C. Discussion of the Effects of Act 373 of 2025 – Generating Arkansas Jobs Act 3:56

The Public Service Commission staff, led by Danni Hoefer, opened with an overview that the PSC does not regulate data-center facilities, defined key rate-making terms (kayak, other-form-of-payment, special rate contract, RIM), presented an independent comparative model of the Cypress Solar project showing that treating Google’s $526 million contribution as a kayak rather than an other-form-of-payment would lower the revenue requirement and produce roughly a $300 million net-present-value reduction for ratepayers, and explained that solar projects can satisfy the RIM cost-shift test while providing reliability benefits through accelerated payments and minimum demand charges,,.

Legislators then questioned the $1.6 billion total project cost, the $526 million Google share, the 39 % residential allocation, and whether ratepayers would receive a dollar-for-dollar (or greater) return; PSC staff replied that the project replaces retiring generation, adds system-wide capacity, that all 14 RIM sensitivity analyses were positive, that cost prudence is verified through the docket process, independent monitors, and AG review, and lawmakers pressed further on the financial impact, noting that the selected contract option would impose roughly $300 million more in net-present-value costs on ratepayers to secure a higher return on equity,,,,.

Further discussion addressed oversight of cost overruns, protections if a project is abandoned, the differing rate-of-return treatment under CWIP versus traditional financing, and possible tools such as large-load tariffs to isolate costs for very large customers; the commission explained its judicial docket procedures, the role of the AG and general staff, noted an ongoing affordability docket, and did not commit to a specific $1 billion-plus return for ratepayers,,,.

Critics argued that the CWIP mechanism effectively turns ratepayers into lenders, creating perverse incentives and shifting financial risk to customers-as illustrated by equity-vs-debt analogies, warnings about borrowing costs versus credit-card rates, and concerns that interest is paid sooner-while testimony from the Arkansas Advanced Energy Association and Walmart highlighted the Generating Arkansas Jobs Act’s role in attracting investment but flagged insufficient customer protections, a higher utility return on CWIP projects (8.63 % versus traditional rates), and called for repeal or amendment of the CWIP provision,,,,.

Farmers and other rural stakeholders testified that the Act has dramatically increased their utility costs, electric cooperatives said they will not use the GAJA rider and will rely on PSC-approved tariffs, while Intergy argued the rider spreads construction financing and ultimately saves ratepayers; the chair facilitated the exchange with analogies, noted that no motions or votes were taken, and left the matter open for further legislative action,,,,,,,.

Additional inquiries from Representative Wooldridge and Senator McKee addressed affordability, projected rate increases and the pending general rate case; the chair noted that Arkansas rates are about 22 % below the national average, that the upcoming rate case seeks less than a 2 % overall increase (under 1 % residential), and that new tariffs such as time-of-use and low-income discounts are being proposed,,.

Official video page ↗

Transcript

Transcript available Whisper ✓ SliQ live captions ✓ Download .txt
Machine transcript

May contain errors. Verify important quotations against the official video.

About transcript accuracy
Source
SliQ live captions
Model
SliQ live ASR
Processing date
October 19, 2026
Speaker 2 1:58
highway com The jointittee on Energy will come
▶ Play
to order welcomelcome to jointnergy and today's meeting I'll recognize senator Johnson for any comments appreciate Senator Johnson putting together this agenda as I understand it's kind of a continuation of what began at our last meeting Senator Johnson you're recognized for comment thank
▶ Play
you thank you very much Mr Chairman yes it is we we kind of ran out of time last time and I appreciate the witnesses that were here at our last meeting coming back today we also have some additional ones I I will say as far as an agenda thing it's it's maybe a little less about the data center centric agenda because as you know we had Google last time which their representatives were very informative and this will be a little bit more about the entire process including the the generating Arkansas Jobsxcts thank you Mr Chair. thank you senator members
▶ Play
of the first item on on our agenda today is the consideration of the minutes of the September 15,2026 meeting we have a motion from Senator Mcee is there a 2nd 2nd by Representative Gramlich. Is there any discussion on the motion seeing none all in favor say aye any opposed the minutes are approved now we're gonna move into the discussion of the effects of actcts373 of2025, first on our agenda we have representatives from the Arkansas Public Service Commission if they'll step step forward thank you for being here today and if you would if each of you would just introduce yourselves to the committee so we have for the benefit of the record and then we'll recognize you for some statements. Thank you
▶ Play
Mr. Chairman. I'm Do Webb, chairman of theublic Service commission welcomelcome Danny Hofer chief of staff at the
▶ Play
PSC Welcome y'all are recognized to make any
▶ Play
statements that you wish to present thank you so much if you'll give me just one
▶ Play
moment to open my stuff up and get our slides up while she's prepared while she's
▶ Play
preparing let me just make a general statement that the public service commission is very aware of the desire of the state to attract new industry and that additional public generation is necessary and we're we're very supportive of that policy bothth of the legislature and of the governor we wish to move in that direction and be as quick as we can under the judicial process that we find ourselves in Mr chairman thank you you're fine it's
▶ Play
my first day using a computer thank you all so much so before I proceed, I actually want to briefly turn to our talking points that we had prepared for the September meeting just for one moment because I want to particularly note that the Arkansas Public Service Commission does not approve data centers or their facilities we are not in the sighting permitting or regulation of data center customers we regulate public utilities and their relationships with all of their customers but not the customers themselves. So from the pers from the perspective of the commission a data center is a utility customer and the foundation of the APSC's oversight of utilities is to ensure that utilities provide safe adequate and reliable service throughout their service territories and that their rates in terms of service comply with Arkansas law. with that I'd like to go ahead and actually start with my slides for today. so during September's jointgy meeting the APSC was asked to compare the use of Google's contribution as an other form of payment. I don't look think I'm looking at my right side. Sorry we were asked to compare the use of Google's contribution as an other form of payment versus as a kayak or a contribution in aid of construction and to do our own calculations for that comparison. we interpreted that to mean that we should complete our calculations independently and we have we did have a few people reach out and offer to collaborate on numbers throughout the process however we felt that it was important that we err on the side of caution and so we completed our s our slides separately. So everything you see here today, this this was our independent work product and in response to the directive of this body, we have prepared the following comparative modeling using numbers provided to us in official regulatory filings. all numbers used by the APSC in this modeling our numbers provided to us by the company and official regulatory filings no outside numbers have been used or assumed. I want to define a few terms that I think will be helpful in understanding the actual modeling in this presentation so the first term I want to define, I mentioned briefly in my last slide, it's an acronym we pronounce it as kayak. it looks like it's spelled Cac or something. I don't know what it looks like it's spelled as but what it stands for or what it refers to is contribution and aid of construction. So even though it's not spelled like the boat kayak it's pronounced like the boat kayak. the specific rapemaking treatment for a kayak is prescribed in code so that is what that statutory reference is to there and the actual function of a kayak is that it is the amount of contribution is deducted from rate base reducing the amount recovered from ratepayers in the amount of the contribution. for what it is I think it's important to note the definitions we're providing here as key terms are provided purely to help explain the function of certain terms and they are in no way intended to show preference for one term or another so the second term I have here is other form of payment this also the ratema treatment for other form of payment is also prescribed in statute so that is also what that statutory reference is applying to or or referring to and the function is that the full amount of the project is placed in rate base when there is another form of payment and then the contribution itself is straight line amortized across the life of the unit reducing the revenue requirement through deferred revenues. So just moving on to the next couple and I promise these are the last two terms that I really want to define. but special rate contract is exactly what it sounds like but it's a form of promotional practice and there are certain elements that must be met with or before the commission that a utility must prove in their application when filing a special rate contract one of the things that a special rate contract requires is that it requires a positive RIM test, RriM stands for a ratepayer impact measurement test and that measures what happens to customer bills or rates due to changes in utility revenues and operating costs as a result of a promotional practice. a positive result indicates a positive impact to the utility system as a whole. So some cyprus solar fast fax as you can see here we've noted that the total plant cost is $1.6 billion customer contributions526 million dollars. Life of the unit is30 years the commission approved EAL for a special rate contract with Google that is tied to this cyprosolar facility and it had a positive RIM test and in fact, there were a total of 14 sensitivities that were run during the process of this application so the utility initially filed their application for special rate contract. they filed it with two sensitivities and when I'm saying when when I'm describing sensitivities I'm really just describing variables or hypotheticals that refer to future outcomes so in this situation the the primary future outcomes that we're examined encompassing all 14 addressed things such as whether or not the customer achieved full ramp whether or not the facility qualified for tax credits and just other financial metrics that may or may not come to pass so the utility in their application they included two sensitivities during the commission review process we asked them to conduct an additional 12 sensitivities. all 14 sensitivities so that's 14 conceivable future outcomes and some of those 12 that we asked them to calculate for us actually we're combinations so it wasn't just a single, variable that was changed it was imagine you know this doesn't happen, this doesn't happen and this doesn't happen. in all four of those sensitivities each one produced a positive REM test result. So what that is what what what that demonstrates is it's demonstrating a total benefit to the system. a utility when I talk about total benefit to the system a utility business is largely a business of fixed costs and so adding a new large customer to the system helps pay for those fixed costs and ultimately it provides downward pressure on rates so that doesn't inherently mean that rates will go down but it does mean that our rates will be lower than they otherwise would be without the contract? So then I come to what we were actually tasked with what we were specifically tasked with preparing for y'all today was we were tasked with preparing a year by year comparison of what would it look like if the Google contribution was used as a kayak, a contribution in aid of construction instead of as it has been used as an other form of contribution excuse me and other form of payment so I'mg give me a moment I'm going to blow this up. Obviously it's really small. So the different coloured boxes here, these basically are just denoting different chunks of years. So bluee is looking at 2026 through 2037. the pink is looking through at 2038 through 2049 and then so on for the green out through 2059. So I'm going to go ahead and start in the blue here because all three of these chunks have the same columns they're just reflecting different years. OK. so in utility ratema we use a term called the revenue requirement and the revenue requirement represents the amount of money that a utility has requested to earn. obviously if they are approved to earn it then it is the approved revenue requirement. So with this facility we are looking at an approved revenue requirement. Here we have modeled the revenue requirement of Cyprus solar under two scenarios. So one, the slide state's current but that is the other forms of payment and then to the right of that you will see kayak. so that is the second scenario under which we have modeled the revenue requirement. the slide to the right of that that says delta delta just reflects the difference so it is the difference between the revenue requirement, under the other forms of payment and the revenue requirement under the kayak so that produces our delta here in this first red column and then in this second red column we went ahead and calculated we calculated the billing impact per 1000 kilowatt hours 1000 kilowatt hours is considered the average customer or the average customer's use per month by customers on the entergy system and so a 1000 kilowatt hour model would show what the average residential bill is quoted as being and in order to derive this number we went ahead and we took the number that you see here in the delta and we multiplied it by the rate allocated to residential ratepayers so for the purpose of the generating Arkansas Jobs Act writer that is39% and some change and then we divided it by the billing the residential billing units or the residential sales units which are7.543 billion dollars that would give you a per kilowatt hour rate and we went ahead we multiplied that by 1000 so what you're looking at in this right column the second column of red that is the 1000 kilowatts per hour different for each of these years going down. if we go ahead and come to the far right of this table we at the bottom you'll notice there are 22 total or two sum rows the first total is in nominal dollars the second total is in net present dollars and those net present dollars are set to 2025. We use $2025 because this application was filed in 2025 and all of the numbers used in it were using $2025. So we felt it was the most accurate representation to adjust it to $2025. and for anybody who is interested the the NPV calculation we used a discount rate of5.76% which we took directly from EAL's capital structure filed in their 2025 FRP filing. after this slide we do have some subsequent slides that show our work in terms of calculating the revenue requirement and if anybody wants me to walk through those slides I would be happy to but to the extent that y'all we are are ready to ask questions we are certainly ready to receive questions. Representative Acre you're recognized to for a question thank you
▶ Play
Mr Chair thank you both for being here today and for the work that you
▶ Play
guys have done on helping explain y'all's thought process a few questions I just have to help us better explain the implementation of this to some of our constituents when I look at the math I see $1.6 billion cost to get this up and running iss that the correct figure before it starts operating? yes that is correct and526 million as part of Google's contribution to that leaving roughly a billion dollars that is being paid for by the ratepayers yes that is correct when youment benefits and I think of terms as a business if the ratepayers of Arkansas are paying a billion dollars for this project to exist what benefits will they receive and can I get a list of those beyond I believe we keep hearing the term costs will be lower than they otherwise would have been and that is feeling extremely incomplete at this point so is there a list of benefits that will exceed a billion dollars to where the ratepayers receive a billion dollars in return for
▶ Play
this yeah so I would say that there's a number of benefits that are brought by both this contract and by the unit itself. so they're tied together but they're also separate in a way. So with regard to the unit itself we are in a phase right now where we have two simultaneous things occurring on the one hand we have quite a bit of generation that is set for retirements and so in the coming years we're going to see a good number of or a good percentage of Arkansas generations retire and so there's a natural need to go ahead and replace that generation. in addition to that we're also seeing for the first time in a number of decades a considerable amount of actual growth in electrification, economic development and so we previously a lot of utilities have seen fairly stagnant or or maybe very slight incremental growth. there's been a lot of growth in recent years and so and and there's a considerable amount of projected growth so knowing that there is both a need to replace generation and also build additional generation. this is a new additional resource that is being put ongy system. it is a system resource. so it'll be available for use by all customers and speaking specifically to the contract when we talk about rates being lower than they otherwise would that is over the life of the unit. and so it is true that upfront especially especially in when you're seeing a a model like Cwhip you're seeing that there are financing costs being collected upfront, but those are costs that then will not accrue interest in the same way that they would under the traditional model and so there is over the life of the unit a reduction in total amount of what would ultimately need to be recovered from ratepayers. follow up I appreciate that cause I
▶ Play
understand that you guys can only review options that are presented to you you're not in the business of you know, projecting or making suggestions on what power companies should look at producing but again I will continue to press on the need for something to show a billion dollars of return back to ratepayers who fronted the cost for it to be built and I do feel that the the expiration of generation and new generation being necessary it's feels like an incomplete answer for those who will have put forth a billion dollars before this is turned on and expect to see a billion dollars and one returned back to them what can you offer as that is more succinct and possibly multiple line items of benefit. So you did
▶ Play
hit on a good point we don't get to pick the projects that are filed in application with us we are not part of negotiations the way that the model works with utility applications and the PSC is that the utility brings us an application and then we operate within the existing framework, uh, which a large part is dictated by statute. in terms of the elements that we must check to determine if something is just unreasonable if something is in the public interest our process is a judicial process and so two parties are automatically made a party to all of our dockets. one of those being the uhagG's office and the other being the general staff of theublicervice commission which for those of you that remember the general staff of the public Service commission is not the same as the commission staff. it is a separate staff we consider it an investigative neutral party and it's the only party in our dockets actually that does not play an advocacy role. They play purely a neutral review role and so when they look at dockets they're purely looking at you know, just do the numbers check out but the AG does play an advocacy role under statute theagG is charged with representing ratepayers and so this both of these the thisappeared before us in two different applications. One application for the special rate contract and one application for the generation facility itself and in both of those dockets the intervenners the other parties were were fully supportive of these projects and because we operate in a judicial process at the PSC. when a utility meets their burden of proof, both under statute and our precedent and then also when all of the other parties in the docket are supporting it it it leaves the commission in a position that you know all the evidence is supporting approval of such a project or or such a contract. Final follow up Mr Chair and
▶ Play
thank thank you for the leeway so is it the publiclicervice commission's opinion that the ratepayers will see larger than a $1 billion return. on this project and over what time period will they see that return
▶ Play
I think it's the public service's position that over the life of the unit they will see more benefits to the system as a whole with this contract and with this unit than they would see without the contract and without the unit. thank you p re
▶ Play
Speaker 51 26:26
s ent ative m c g re w you're recognized
▶ Play
for a question thank you chairman and thank y'all for being here today on the cost of the of cypress solar 1.6 billion do y'all does its public service commission look into that to see if that cost is is a similar to what cost would have been in some other state or how do you verify that that cost is reasonable? Yes, so that was verified during the
▶ Play
application and docket process. so when I spoke about the other parties in the docket specifically the general staff and the AG staff. they do a lengthy deep dive on a number of things including the cost of the unit and comparables and yes the short version the short answer to your question is yes thank you Senator Mcee you're recognized for a question
▶ Play
Thank you Mr Chairman and thank you both for being here appreciate the work you do. Iu I just want to make sure I understand your chart here the bill impact per 1000 kilowatt hour residential bill is that based on the kayak or
▶ Play
the current? so that is based on the difference between the current and the kayak. so we could go back and and produce and no that's that's fine just wanted to make sure I knew
▶ Play
what it was no thank you very much senator hickey you're recognized for a question
▶ Play
thank you Mr chairir. I'm Miss Hford. appreciate you doing this information I got a couple of questions though so the assumption that we're making and I guess have to make from what you all were tasked with is that we're assuming that if we have stayed under the old system where energy was required to capitalize it that they would have went forward with this project is that correct? Honestly can't speculate it's
▶ Play
possible they haven't we don't have anything in regulatory filings that indicate either way to us
▶ Play
but what I'm saying is we have to make that assumption to do these calculations of the numbers correct? I understand what you're saying understand yeah I understand you understand what I'm saying but that's what we did here is that correct? what we did is we took what what the benefit would be or or what they're what their that they were going to do it no matter what under and I understand they may have not have but what what we're having to make is an assumption here is that they would have done this to come up
▶ Play
with these numbers yes if if your question is that we assumed that all we assumed all other things in the contract were the same with the exception of how the contribution was used. We
▶ Play
changed no other variables and up here I see it says this is a under a rim it says that's a positive result in indicates a positive impact to the utility system whenever you say a positive impact to the utility system are do we extrapolate that out to say that we believe that that's a positive impact for the
▶ Play
ratepayers also is that it means is that it's a to the system as a whole but it's not a positive to the utility. So all of the all of the metrics in a rim analysis, are specific to how and whether and how much there is a shift to other ratepayers by bringing a customer online and say giving them xyz rate and so in in this fact pattern when when we refer to there's a positive impact to the system it's a positive impact to the system of other right of existing customers I don't guess I'm smart enough to understand what you just said that's all right. I
▶ Play
think I think I talked in a circle
▶ Play
anyway. no so when when we say a positive impact to the utility system. we are not saying that it is a positive impact to the utility period we are saying that it is a positive impact to the customers on that system so when a rim analysis is conducted the primary thing it's looking at is whether there is a cost shift that is occurring to existing customers whether other customers will have to bear additional costs that they otherwise wouldn't have to bear and in the case in and in a positiveIM result shows that no they that existing customers will not bear additional costs and the not only will they not bear additional costs but with a positive result they will actually bear fewer costs the asterisk to that is that it's not that they will bear fewer costs than they it's not that they will bear fewer costs that their their bill will go down but they will bear fewer costs than if this were to be brought on and say the traditional but without a special rate if this customer joined the
▶ Play
system without a special rate. that's that's gonna lead to my next question then so under the old system whenever they required to use their own money go out and get their own bonding or whatever they did and they'd complete the project we call that amortization is that correct whenever they were they had to go out and they would amortize it but then they would come back to you all after the project was complete and you all would increase customers rates at that point wass that right and what you would do is you would base that on you would look at everything that they had done during this project, everything that they'd done during the project to make sure that you thought the costs were all OK and everything like that is that that's correct yes that the that the costs were prudently incurred right let me ask you this so under this this new thing with the sea whip whenever they first begin making draws so if they put on x amount of dollars or whatever are we allowing them also to go ahead and put their return on whenever they're whenever they're doing that so in other words they not only are they getting the cost are they not also getting a cost like a return that's being put in their pocket for doing it
▶ Play
under the traditional model no under the sea whip yes under both models there is a return yes,
▶ Play
under both models there's a return OK do you know what the return is on the
▶ Play
current under the sea whip what we're allowing don't have the number right in front of me but I know that it was prescribed by it was prescribed in in Act373 what that would be not the actual like percentage amount but the method for calculating that was prescribed via statute. you know approximately yes but I don't wanna I don't want to be wrong so I
▶ Play
would rather if it or 8% closer to closer to 8% fair enough ok so let's go back to the
▶ Play
the old wayen senator hickey I'll let you ask that question but I I'm gonna have to move to some of your other colleagues here in a minute just give her a heads up thank you so under the old way so
▶ Play
under the old way what would that return have been that we would have allowed whenever they brought it
▶ Play
back to the PSC so a different rate of return is set in each rape case which would be the only way to get plan or yeah to to move plant and service to so to move an asset into rates. but currently it is a slightly lower rate based on when assets transition from CwIP to plant in service they will earn a different rate of return. and this is still the same question
▶ Play
Mr chair but I'll stop after this if that's if that's ok sir so so here here's my here's my thought on this and again if there's a fault here I have to take blame too because in the end after the amendment I voted for this. so I'm not trying to dodge it or you know, anything like that because like I say, depending on on this I could be a fault for voting for this so let's just get that out there in the open so my question is this the way that we've done this with this rider what is the impetus for the utility to watch their costs and make sure that they're even doing it as prudently as possible because if they're not doing it as prudently as possible and they put more money on at this point what that's being done is it's going on these customers bills and they're getting a return on whatever amount's there. So would it not be better from their standpoint if the cost were actually higher that were going on that rider just from a straight up financial thing is what is straight up financial situation well so much like in in the
▶ Play
traditional model once a once an asset actually goes into base rates so once it is removed from the writer and the utility moves it into base rates. Actually I take that back oncece it goes plant and service. so I apologize. Once, once the unit goes plant and service. so it just goes into service. at that point the commission begins its review process of all of the costs incurred and at that point we will do a review for all costs to ensure they were prudently incurred any costs that would be deemed impertently incurredwood require a return I I know that there's some some stipulations about what exactly happens exactly how that return is treated. but there there is a mechanism for cost correcting. I'll stop Mr chairir thank you
▶ Play
thank you senator hickey and and you feel free to get back in the queue I just need to move down through here a bit Representativewooldridge you're recognized for a question
▶ Play
thank you Mr chairir and I think Senator Hickey's last question kind of was the start of my question just to expand on that a little bit what prevents the utility from continuing to have a project in the queue kind of following the same line of questioning that he stopped at it seems to me that there's potentially maybe an unintended consequence here that it becomes lucrative for a company to always have a project in the queue and then what's that oversight in terms like he mentioned
▶ Play
of the actual cost of the project so for these generation projects the commission ordered that the utility must, contract and it's to be approved by us so it's not just that they pick whoever they want but they must contract with an independent evaluation monitor. so they provide to us in a docket, uh3 or4 proposals of firms that they propose to use then because everything in our process is a judicial process. The other parties have an opportunity for feedback to raise any concerns, support and then once that independent monitor is in place that independent monitor is tasked with keeping up with all of the construction as it's going on if if there were anything that that independent monitor flagged as concerning that's something that would appear in a report to the PSC the utility also has a requirement to immediately notify the PSC if there are major changes in the cost projections or if there are stoppages in construction. so the old way versus the new way
▶ Play
do you anticipate an uptick in project request under this new model we have definitely seen an
▶ Play
uptick in requests but I don't know that I can't tell you that there's any causation or it might be mere correlation because as I mentioned earlier we are in a build phase and a need to replace old generation add new generation so Id I don't want to speculate on that. OKollow it
▶ Play
Mr chairir. one more what protections are in place for the ratepayer if a project's not completed so kind of back to the first question you know to me there may not be an incentive there exactly to keep utility provider from dragging their feet or assuming additional costs over an additional period of time so what protections are in place for the ratepayer to make sure a that happens and b that a project's completed and they're not just left funding
▶ Play
an incomplete project so are you asking in the hypoth et ical situation that a project were abandoned if a project were abandoned they would still have to come to the PSC and the PSC would then begin its review of whether costs were prudently incurred. So that would be a determination of of all the facts at that point but if there was anything that suggested that they had imprudently occurred those incurred those costs. you know that would be a finding for the for the commission. so if they
▶ Play
are prudently incurred but the project's still not complete with the utility provider be obligated to pay back the customers that fronted the the money for that
▶ Play
project they would not however that is not inherently different from the traditional model there is a difference in when when the money is collected. However, if a utility prudently incurred costs and then through no fault of their own, you know act of God sort of event that would occur to make them have to abandon a project under the traditional model they would still be entitled to seek recovery from the commission and that was the same principle
▶ Play
and process that was under the old model as well thank you Senator Clark
▶ Play
you're recognized for a question thank you
▶ Play
Mr chairir the when you were talking about the 1000 kilowatt hour average bill you mentioned39% Yes. what did that39% figure
▶ Play
represent? So the39% figure represents the allocator or the percentage of total costs allocated to residential ratepayers so where the number that you see above that's in that delta column or or defence column that represents total costs for all ratepayers, 39 % of those total costs are borne by residential ratepayers of the cost
▶ Play
the what protection is there if any as it was mentioned earlier it appears that the more it cost the more the energy company gets paid what protection is there that we're not paying more so with regard to cyrus solar
▶ Play
but not just cyprusolar this also applies to the majority of new generation projects approved by the commission recently. The commission has set a benchmark or what we also refer to as a soft cap. so it is essentially limiting recovery at that amount and should the utility desire to recover above that they would have to come back to the commission and prove why why the costs that they have occurred incurred above that should be ripe for
▶ Play
recovery. the PC have any say so in where we are closing coal plants that we had paid for and they'd got their close to 8% on that could be operational for some time and and then going with something more expensive which is costing the ratepayers more does the PSC have any say
▶ Play
so in that we do not we were not made aware of that until after the fact and we lack any mechanism at this time to any other actions
▶ Play
that's what thought just wanted to be sure. thank you Senator Penzo
▶ Play
you're recognized for a question thank you
▶ Play
Mr Chair. I've got a couple of things in my mind here the the300 million dollars delta does that show that kayak would have been cheaper
▶ Play
that shows that kayak would have provided or would have resulted in a reduction of300 approximately300 million in net present dollars so2025 dollars but518 million nominal dollars in what ratepayers
▶ Play
are will ultimately pay OK and then kind of kind of along the lines that representative Aor was talking about the the plus benefit of the the billion dollar investment you know I'd I'd asked a question before and hopefully you can provide some clarity we're replacing two coal plants you know built you know I think Mr Webb mentioned new generation's the goal and and I agree that that would be positive electrons on the grid so I know that the two gas plants that are replacing the two coal plants are going to generate less electricity than the two coal plants so we're we're at a net loss there is is the solar plant gonna put more electrons on the grid than the data center's going to use or is the data center gonna consume more electrons than the solar plant can produce
▶ Play
so at this time the actual number that the data center is going to use is not been redacted by the utility in our docket. so I can't answer that question for you. I apologize. figured that was the answer and I
▶ Play
think that's something as a body we need to know what that is because if it's if if the invest if the ratepayers are investing that much money into infrastructure and we're actually going to lose electricity lose production that's that's going to be hard for people with stomachs so I don't know when that number is going to be available but I'd appreciate getting that as soon as we can also where where is the money if I may continue Mr Chair where is the money gonna be stored I mean so we're collecting money to build infrastructure in the future is that I'm sure that's going to go into interest bearing account with entergy is that
▶ Play
an accurate assumption that's a question probably better posed to entergy in terms of where they will what
▶ Play
what where that money will be housed OK OK and how do you know if there were any credits tax credits for going with solar instead of natural gas
▶ Play
plant for this there there are some tax credits associated with solar
▶ Play
yes there are some tax credit that would that be realized by the the data center or the the provider at liberty to disclose those details they've not
▶ Play
been unredacted Thank thanks for apologize thank you Representative Beck, you're recognized for a question thank you
▶ Play
Mr Chair my my my first question is this
▶ Play
you know not all kilowattts are equal right you know some are
▶ Play
dispatchable some are not dispatchable so when you guys are doing your model do you actually consider the fact that solars kilowatts are obviously not dispatchable so that's my
▶ Play
first question yes we do that being said we had the the questions that we posed during this process regarding the dispatchable nature of the facility. it was explained to us that and and and and it's not just that it was explained to us this has been this this resource is intended to be a system resource for entergy so it is not wholly earmarked for any one customer and so with it being a system resource, it's less a question of whether the profile of the resource serves a specific customer type more and and more so just whether it is a benefit to all customers on the system Representative Beck let
▶ Play
me add that we do not have the authority to choose the resource we only look at the resource that is brought to us by the utility OK so we can't specify whether what type of resource it is we don't have that authority
▶ Play
so so based upon your answer then you're saying that you know there's been a lot of talk about the the ramping up of power requirements from these large data centers some of them I understand some of them are much flatter as far as their load is concerned which would tend to match solar a little better versus some that are very ramp up and ramp down and it seems like that would add additional cost if you had someone the the major load from this from the google to sell town just use their their name but they're ramping up and down and now we're adding a a generation capacity they're paying for it or a third of it they're paying for that but it it's a flat it's it's more of a flat it's not dispatchable it's obviously doesn't work at nighttime and things like that seems like that would add cost to the other people on the grid because somehow those costs of transmitting have to be occurred somewhere when when the generation source would not be available. A I am I totally off on that not
▶ Play
you tell me if after I answer this if I have like just completely missed the mark on your question but so are you familiar with the concept of fungibility that all all electrons one electron is the same as every other electron very much so and so for the other members of this body if if you're not I'll give an example that you know, if I have a a gigantic bucket. and this is my utility system as a whole and I'm pouring cups of water into it. Once the water goes into the bucket. I have no way of knowing which water molecules came from which cup. and then if I take that bucket and I poke a bunch of pinholes in it and you know little streams of water come out I have no way to figure out which water molecules that are coming out came from which cup or or where they even were in the bucket and so when when you have electrons that are put on the grid there's no way to determine which electron came from which resource and then goes to which customer. So entergy looks at all of their resources, all of their generating resources as system resources. So for them I believe their approach is just to put more electrons on the grid and not necessarily looking at the you know we're going to match this electron with this
▶ Play
customer. and I understand that concept it's a good example but but it it it lacks on a few thingsumber one is if there are no there's no liquid in your bucketbody starts to hurt. all right?nergy has to be produced the very moment Energy has to be produced the very moment it is consumed my concern is is if we're adding something that's that produces a lot of power at a given time but we're putting a load on that is verying constantly we have to make sure now I understand that that could pull from other resources within the grid and get it there but that's my very point in that the transmitting electrons is not free at cost you pay to transmit electrons and it so you could there could be costs related to that that I I was wondering if you're a model that's the point of my question was to see are you gonna capture that cost because if if you want if you if you're not that could be additional cost no our model
▶ Play
does not capture that I will add though I don't know if this fully addresses kind of your concern but the so cyprus solar is a combination of both solar and battery. So there is also a battery system that's part of that resource right that's that's just a
▶ Play
bucket and I doubt the bucket's big enough to last through the night but so the other question is the the production how the solar system that that we're putting in how do you calculate what that will be the quantity of that production are using the the solar's nameplate or are you using a reduced number so the solar
▶ Play
is both looking there is the nameplate capacity but we use if we're dealing in misso and this resources and myo we're using the myso accredited value. do you know what that is not off the top of my head but I can chase that down for you thank you
▶ Play
Senator Mcee you recognized for a question thank you Mr Chairman. I heard
▶ Play
it mentioned or I saw here that the kayak versus the current the revenue requirement would be reduced by a little over500 million so what I'm hearing you say is that the commission found through the RIM analysis that the benefits to existing ratepayers over the life of the asset were greater than that difference.
▶ Play
not exactly what the commission found was that there were the benefits to existing customers were there no matter how this contribution was treated so there were there were benefits to customers the way so the way it was modeled all of the rim analyses were conducted using the other forms of payment none of the ribb analyses contemplated maybe two of them contemplated a kayak and the majority of them contemplated other forms of
▶ Play
Speaker 184 56:22
payments hearing it's just that
▶ Play
both provide benefits with respect to whether or not an
▶ Play
asset you use the nameplate or the accredited value these are some these are things that you work consistently with organizations like MIo the balancing Authority and SPp to ensure obviously they're more concerned about their reserve margin than y'all are but that's what the utility's responsibility to make sure that they're generating enough power to serve their customers is correct they have a duty to ensure that they are generated enough to serve their
▶ Play
customers do they do they face pretty severe fines if they don't do that? Yesx extrememe. OK thank you Senator
▶ Play
Clark you're recognized for a question thank you Mr chairir The if I understood
▶ Play
Mr Webb correctly a while ago the y'all don't get to decide whether they bring you solar or gas or coal you have to make a decision on whether the what they bring you and so and you also maybe I'm wrong you don't have privy to their contract with the new large customer that says that they have to have so much percentage of renewable in order for that customer to come into Arkansas and do business that's correct we're not a part of those negotiations of solar cost a lot more than gas or coal y'all aren't y'all don't make any decision on that and so when you say that the consumer is getting39% of this cost if the new person coming in is requiring that they use solar it seemed like the customer should pay 100% rather than the rest of us paying more but y'all have no say so in that
▶ Play
we have opened a we've opened an affordability docket. This is not a direct answer to your question but I think it it might hit on some of it we've opened a specific docket targeted with looking at affordability concerns knowing that we are in this build phase and knowing that the unfortunate reality of being in a build phase is that also bills will increase to support that build. and we have all of the utilities in Arkansas participating. We also have the AG's office we have quite a few interveners we've even had a few large customers join us in that docket. and we're looking at a number of tools in that docket but one of the tools and I bring this up because one of the tools that we have asked all of these utilities and interveners to bring us information about offer us testimony on two of those two of those tools actually both large low tariffs and also sleeveed power purchase agreements offer opportunities or or options that large customers might be able to support resources when they have specific resources that they want to choose. you want to dumb that down for me? Sure Yeah so we are we are looking at some different tools that are being used in other states they haven't been used here yet but they are tools that will better isolate costs to large customers particularly when very uniquely large customers also have particular requests for generation type and that with with the intent to hopefully inci insulate or at least mitigate the impact on other customers and how would you know that
▶ Play
they had those requests how would you know that this large entity has the request for the renewable so we wouldn't know on the
▶ Play
front end but in in states that have implemented tools like this say for instance they call them large load tariff but it's it's not like a tariff like a tax that's just a large load rate schedule. and at least in some of the states where it has been implemented it's just if you are a customer that meets a certain profile with regard to your use your use is however high or it you know, hits a certain threshold percentage of of you know load or something like that that those customers then must take service under a certain right schedule. That doesn't mean that that is what is coming to Arkansas but it is a tool that exists in some other states and and we've asked our utilities and and large customers here in Arkansas to bring us more information on it so we can find out
▶ Play
if it's something that could work here a compliment you for working on that but as it stands now if they want to put in solar because companypany x needs in for their stockholders to show that it's a certain percentage renewable and solar costs a lot more than the rest of us are actually subsidizing their energy cost if we're paying for a percentage of what we didn't want
▶ Play
and they do they do still have to prove that it's a reasonable cost for that resource. so the the the solar still would have to be reasonably priced and if
▶ Play
the federal tax credits went away and they abandoned the project that's a perfectly good reason for them abandoning it and us still having to pay for it is the federal taxpas went away we didn't know they were gonna go away so
▶ Play
we still get to pay for it right so this might not apply to all situations but the scenario actually at hand here with Cyprus solar one of the models that we asked the utility to complete was under the hypothetical situation that the tax credits go away and that the facility doesn't end up qualifying for them and it still did produce positive a positive rim test result which means that other customers because of so like I mentioned earlier utility companies are primarily made up of firm costs and so when you bring a very large customer onto a system they're going to pay enough that they are going to apply downward pressure on the rates of the the the firm costs that other ratepayers or other customers are paying so in this situation there would not be a cost shift even if the facility doesn't qualify for tax credits I appreciate the
▶ Play
work that y'all do thank you Mr chair.
▶ Play
all right members we've got about5 in the queue we've gotten down to two but we're back at 5. I just we're about an hour in just want to continue to try to give members leeway. just wanted to kind of keep us keep us on track here so we'll continue through this. Representative Gramlick you're recognized for a question thank you Mr Chair. I've got
▶ Play
several questions and I just need to how much was the con the google contribution we've heard about that a couple of
▶ Play
times. what was that number so there's multiple contributions but they total of an amount of526 million
▶ Play
dollars. who ultimately decides how that contribution is going to be used whether like current or the kayak or what who makes that decision so there's a
▶ Play
couple of ways that it's determined but the first way that it would be determined would be the utility can determine the utility and the customer together in the contract determined what the payments were going to specifically be for and how they were characterized and if you want I do have I have an excerpt from testimony that the utility filed with us. so there was a question are accelerated payments and minimum demand charges other forms of payment so they're referring to essentially was is the contribution or the contributions being made other forms of payment and the response from the witness was yes, those two categories of payment are not kayak they are payments for electric service that per negotiations exceed the rates Google would otherwise pay under the large general service rate scheduled during its ramp period. Google's higher rates are set at a level to financially support the development and ongoing operation of Cyprus solar.
▶ Play
and then I guess with this whole thing that we talked and it's a little bit of what Representative Aker said but like a benefit to the customer so like ultimately the benefit to the customer would need to outweigh the returns entry you would receive right? like like ultimately like we're not the energy is not going to receive a higher return than what the customer is going to receive from like the cost sharing or or the cost reduction right or wrong so the
▶ Play
the not all benefits are purely reflected in bills. so there's other benefits that the customers receive and some of those benefits are things like reliability. So, um, for instance, you know there's a benefit to your AC running on a hundredgre day in august or when you come home from work and you flip the light switch that the lights come on and not all of those are reflected inherently in bill costs but they are reflected uh, in in putting more electrons on the grid but the cost recovery model through the PSC is not a one for one. it's that a utility is legally obligated to serve its customers and its service territory. that's part of the exchange for the regulated monopoly service territory is then they also have a duty to serve any and all customers including any and all customers that would locate there they don't have to already be located there. and so part of that cost recovery model is that utilities then have to build generation to serve customers even if they're new customers. and the requirements that we follow, are that the cost to be prudently incurred so that the costs are reasonable, they're just they're in the public interest but it's not an inherent 1 to 1 model. this
▶ Play
is my last question thank you. So and it kind of goes back to what one of the senators talked about over here was solar and you said that if the prices were reasonable so even if solar were to cost more but as a reasonable cost for solar but not necessarily the best for the ratepayer a project could still be approved
▶ Play
possibly but I don't want to say that that's the fact pattern here there's other variables that could go into why a project would or wouldn't be approved but and and I also want to make sure you know there's a situation where a cost could be slightly above but I mean any resource that comes before the commission that's just exorbitantly priced even if it's reasonably priced for that doesn't mean that that there's other types of resources that are incredibly expensive and even if it was a reasonable cost for that if it's incredibly expensive and just like bad on its face for ratepayers. that that doesn't you know, mean that the commission's going
▶ Play
to approve that so you're going to besides rate you may weigh stuff like reliability or the infrastructure or ass there's and obviously those aren't numbers like penny per penny but they do have a value absolutely thank you all right members we're holding
▶ Play
steady with these last few in the queue so I'm I'm gonna get through these last few we're also getting back to some members that have had previous questions senator Penzo you're
▶ Play
recognized for a question. Thank you Mr Cha I'll make these quick the the rim analysis that's done is it when when that takes place do you evaluate is there a difference between solar and gas
▶ Play
and the that analysis it the analysis is purely looking at whether there is a cost shift based on that based on the promotional practice that's being offered versus if the promotional practice was not offered. OK, I
▶ Play
was just curious if like the dependability of solar vs natural gas was factored into that they're not
▶ Play
not with the rim. there there are some there is a similar review I think to what you're asking when reviewing generation but not the rim itself.
▶ Play
OK OK. and then Representative Gramlit kind of touched on this but I just want to kind of clarify for my own thoughts there there were two options there was the the kayak and then what we went with and the kayak would have saved the the ratepayer300 million and 11 cost ratepayer300 million more than the other and also generates more money for energy
▶ Play
iss that accurate? so it it costs30 million more in NPV. it's it is518 million nominal dollars but that's over the life of the unit so that's over30 years that's not over just like one year as for the second part of your question, the same amount of money is is being contributed by Google so I don't I don't have numbers in front of me on
▶ Play
the second part of your question. well to me to me it looks like the decision was made to charge 300 million more to the ratepayer in order to get a higher return on equity and if I'm wrong about that please correct me but should should should they be able to make that decision I guess would be my question to the body to charge the ratepayer more and make a higher profit when they could have saved the ratepayer money so if you could give me an answer to that I'd I'd really appreciate it thank you.
▶ Play
Senator Hill you're recognized thank you Mr chairir. I thought you forgot me over here I'm gonna I'm gonna have about three different questions for you and just kind of kind of following up I just want to go go through everything so going back to when we first started talking about this you said that there is independent company who is going to be overseeing the projects that is hired by the company that's doing the project is that correct? That is correct so if ok I I think you answered
▶ Play
that question right there and so we do have oversight over that company we first have oversight over which of the companies because they have because they have to propose a few different options to us. and then we have oversight over that company and and all of their reports are they they have to submit reports throughout the process of construction to the PSC so that that all is overseen by the pSC so you're supposed to be overseeing the overseer then correct so y'all going out and inspecting and
▶ Play
checking that part of it overseeing not personally no so y'all going out and inspecting and checking that part of it overseeing not personally nook other thing here is looking at what you said a while ago said you're not at liberty to speak about who is setting getting the tax credits that's out there from the company so with that being said I think I think that answers the question pretty much who's getting it it's definitely not the ratepayers that's going to be getting it so we're asking our ratepayers to pay $1.6 billion for our project and allow a company to receive the benefits for the tax credits instead of the consumers out here that's a yes or no there's very little I can respond to
▶ Play
that that what I didn't ask you who it was. I know but virtually all the details surrounding that are redacted. and
▶ Play
they're red redacted because there's no transparency here. they've decided to sue the individuals who were involved with the foia information earlier in the year and we're supposed to trust them with
▶ Play
Speaker 141 1:14:22
$1.6 billion can't speak to the utility
▶ Play
and the customer's choice to redact things however I can tell you that at in the order approving the special rate contract the commission did set forth some specific requirements for future special rate contracts and things that would not be allowed to be redacted and that includes some of the things you're asking questions about. thank you on that and just one more thing we're talking about the benefits and I'm
▶ Play
almost through Mr chairir. we're talking about the benefits to the customers at at the end that their rate should not go up as drastically amm I correct on that? how can we determine that when we do not know what Google's gonna pay because they have a special rate how do we know that part of their rate's not gonna
▶ Play
be shifted over to the consumer out here so the utility has conducted modeling and provided us with modeling and in addition to the commission having access to that so do the other parties in the docket but Id I understand what your question is yes
▶ Play
it goes back to transparency and trust and someone having a special rate against our largest industries that we have in the state who are actually already here doing business and have been for years we're gonna bring someone with the outside of here and give them a special deal but not our normal customers I will tell you that
▶ Play
this is not the first special rate contract that has been approved by the commission but it is the only data center special rate contract that has been approved by the commission the thing about special rate contracts is that they do they they are a tool to bring certain large customers and as I've mentioned they can't saddle other existing customers with the cost of it that's the purpose of the rim analysis but just to give you an example of previously approved special rate contracts I believe most if not all of the previously approved special rate contracts are all steel manufacturing facilities and and those have those special rate contracts are are part of what's been able to make Mississippi County the largest steel producing county and then in North America. so they they are a tool for the utility to be able to use and and and they do come with a good bit of oversight from the commission. We we wouldn't have approved the contract if it was not you know if it was to the
▶ Play
detriment of ratepayers thank you very much uhpresentativewooldridge, I think it dropped out but asked to get back inpresentativewooldridge you're recognized and then my chair
▶ Play
co-chairman has a question thank you Mr Chair that'll be quick I'm just really trying to learn and get an explanation because this is not an area of focus for me particularly so do we have an intergy shortage in Arkansas with the coal plants going off production? we have a projected
▶ Play
potential projected shortfall however with the amount of generation that has been approved and also is currently under application before the commission assuming approval on that and assuming you know no no new growth no. however, that doesn't you know, permit for additional growth so it also doesn't contemplate future retirements either so yes
▶ Play
or no there's a shortage I think there's nuance to it I guess what I'm trying to understand and again I don't know all the details surrounding this but if there's a shortage which I hear from some folks that there is and I guess there are nuance and detail around that. why would we be taking on large utilization customers like this that aren't Arkansans and I'm not opposed to the google venture necessarily I think that maybe that brings value to the state of Arkansas but it's kind of if we can't provide for those Arkansans that need the services potentially why would we take on additional buildouts like this and utilize citizens paying for more than 50% of the
▶ Play
build out. new large customers do offer an opportunity in terms of both because they're contributing to existing fixed costs for additional economic benefits on the system but then also depending on how large of a customer and what kind of contract is negotiated they may also like in the instance of Google make contributions to support additional generation. So I think they're is certainly a potential for added economic value so it would be an issue of scale then your opinion is that by adding them down
▶ Play
the line that's going to be better for the ratepayers that are on that line it can be. I mean that that's assuming you know certain facts
▶ Play
and details but yes thank you thank you Mr Chair thank you
▶ Play
Senator Johnson you're recognized thank you Mr Chairman couple things and this is to both the chairman Webb and Mshofer in the paper today there was a quote from commissionerate said this commission has been particularly sensitive about the amount of Susan Prince's confidential information not just in the special rate contract dockets but in resource dockets as well and I think this commission has urged that as that information becomes public it should be unredacted in the underlying dockets where it was held out as con confidential that's bothered me a lot I've expressed that to you Miss Hofer personally and you've you've said you thought that perhaps they would meaning entergy would have unredacted that prior to this hearing but obviously that did not happen correct they did redact the
▶ Play
information that we asked them to redact we we asked them to redact specifically the information needed to conduct this comparative analysis for y'all and and they underredacted everything we asked them to
▶ Play
and then totally separate question we talk about different all electrons are equal but in the mortal words of of Orwell some electrons are more equal than others ins as far as federal tax credits are involved so if the ratepayers of Arkansas are paying for an electron on their bill and they're also paying for it on their federal tax return meaning that the government gave a credit to somebody that they didn't get that credit are they it's sort of like paying twice would it not be because you can't compare if the utility pays 100% of the cost of that electron and then another electron they pay 8090% of that cost that difference de facto is borne by the American taxpayer is that a I seeing
▶ Play
this correctly I I understand where you're going with that. I don't have you to quantify was going to say haven't haven't modeled it nor have I reviewed any modeling that I could substantiate that
▶ Play
and and that kind of follow up on what represented almost said senator but I'm gonna get ahead of myselfwooldridge said there is a we're replacing one form of generation for another so it's it's obvious that we're gonna we're not the the coal is out and solar and wind and gas are in but I'm just I'm just trying to make sure that when as we do this we're looking at the same thing we're using in apples and apples comparison on this and I'm not so sure that you know we're actually doing that but what other information is still redacted the public doesn't yet know about this agreement between Google and Egy. And I'm not saying tell me now I'm saying what type of thing is is I would say that
▶ Play
the majority of the contract remains redacted. and which that doesn't mean that the the majority of of terms that you know any one person is interested in remain redacted but just in terms of breadth of, you know, number of pages lines per page the majority of
▶ Play
the contract If I don't like that and I wanted to
▶ Play
do something about it what are my options you as a senator or you as a person of Arkansas
▶ Play
Well, OK let's say senator Mark Johnson and Citizen John Doe both of those two people so particularly you know
▶ Play
Anybody is entitled to petition to intervene in one of our dockets that doesn't mean that they would be granted intervention in one of our dockets but there's always the avenue to try to intervene. there's also other ways that you could participate in a lesser way. individuals parties can make a statement of limited appearance in our dockets. You can also make public comments. Anybody can make a public comment so I I I could have started there I suppose. A public comment is is a tool that's available for anyone and everyone in every single one of our
▶ Play
dockets. and as senator Johnson what could I do other than introduce a bill
▶ Play
to that's that's think the the only thing that
▶ Play
would assume differ from you being in the statute allows this redaction it's allowed in Arkansas statute correct yes we have an exemption to foia under 233 32316 you don't have to cite you don't have to ci do actually have it somewhere but the point being that that the general assembly did make an exception to foia for this type of thing that is correct and if I as senator wanted to repeal that I could consider introducing a bill and trying to convince some of my colleagues to support it is that
▶ Play
it's a simple answer that's certainly your prerogative and obviously the prerogative of this body I would definitely be remiss not to mention the importance of the commission in being able to protect certain information there is a lot of highly sensitive grid information and and infrastructure information so not just on the electrical grid but on the on the gas infra infrastructure side as well in terms of how how energy is transmitted transported I hear you and and I won't say that I'm not
▶ Play
necessarily looking at that I'm just looking at what our situation is as far as transparency much of which is justified I'm not against NDA's I do see I have a fear that there are many that hide behind these things and keep things out of the the public venue that should be in the public venue and and that's probably something way beyond the discussion we'll have today but I appreciate your candid answer and thank you and thank you Mr chairman thank you and
▶ Play
thank you to you both for appearing today and and answering questions members first chairman members we're gonna move to item C2 economic analysis of construction work in progress provision as they come forward I'll I'll turn it over to co-chairman Johnson. he could make an introduction as these two individuals have their have a
▶ Play
seat Thank you Chairman shepherd and we'll keep the ball rolling and while you have to step out for a moment gentlemen thank you for coming please push the button on your mic which will turn it on and introduce yourselves for the record
▶ Play
Speaker 248 1:27:38
Hello, I'm Jasonwalter. I'm an associate professor of economics at the University of Tulsa. my research focuses on market structures regulation and I also teach and conduct a lot of policy analysis move a little closer to the mic oh sorry thank you should I repeat that or is
▶ Play
that all right? No it's ok for doctors all right good to be with you guys. my name's Doctor Eric Olson. I'm PhD in economics. I am head of the economic liberty branch at Florida State University and I'm currently on unpaid leave from the University of Tulsa. I should disclose that this is my personal opinion not the IGC's statements that are there and look forward to discussing this with you guys today
▶ Play
thank you and if you have a statement you can I'll let you choose which one goes first go
▶ Play
Speaker 248 1:28:25
right ahead I think I drew the the smaller straw so I guess I'll go first there's a lot of great questions and and I want to start this just by providing a little history with Chi cu this is not something that's new or hasn't been utilized before but before that I want to mention that Cwhip shifts both the finance and the risk that's the bulk of what it's doing. It doesn't eliminate the cost of financing for a power plant it moves the cost and with that the risk and that movement is from investors to ratepayers.ustomers become the lenders they're not entitled to any return or on interest and generally they bear little protection this also comes about when we have overruns delays or abandonments that were mentioned previously. and this happens while the utility generally is authorized to earn a return the day construction begins. when this first came about it was in the 1970s and there were about33 state commissions that allowed it. Within that short time period there were an abundance of overruns and your neighbors to the north actually had a ballot measure where voters denied the use of sea whit permanently unfortunately the legislature if you've been following Missouri politics then went back and enabled it again this how was just recently in 2025. when these happened there were
▶ Play
excessive overruns and could you just pull
▶ Play
Speaker 248 1:29:59
the mic a little closer'm very sorry yeah no problem please continue. OK so by 1980 FerRC or theederal Energy Regulatory Commission had restricted the use of these quips and in 2000 this is when it came back again when we had large plants back in the seventiess is when we had a very large energy demand and that was the catalyst for putting these these sea whips in place and overall by 1980 they've been abandoned because of how many overruns and abandonments and also illegitimate uses of ratepayer money had appeared. This happened also after 2000 if you want to look up the ogel project or those ones in Georgia where they also went excessively over budget. and my concern here today is that Arkansas is on the path to do the same thing and Arkansas is not alone we've seen these pop up in Wisconsin, Missouri and where I currently live Oklahoma And I've been able to see some of the slides thatnergy has provided and with their analysis that states that there is a large amount of savings and the $2.25 billion figure that doesn't take into account time value of money which I think of a few of you already recognized and the savings that doesn't account for what the users could have also been doing with that same money but the biggest problem is that it's going to shift those risks onto ratepayers but it's the current ratepayers that are going to take on that risk and it's going to be future ratepayers that may see those rewards. This doesn't just count for residential this also applies to businesses so current Arkansas businesses are going to be taking on those risks and future Arkansas businesses are the ones that are going to reap the rewards. how these bills are crafted has a huge impact on the incentives that are created by these energy companies. and for act I might get the number wrong I think it's373 the default is largely to approve any kind of overrun or adjustment that occurs although it is subject to some review those challenges are already somewhat apparent just in the disclosures that I think you'll be able to see later on when energy provides their slideshow where they had a550 million dollars bill forirronwood. This was the approved amount and then they claim that the total cost is going to be700 million which is already a huge difference and across all of the three projects is amounting to I believe it was $252 million that's above what was the projected or approved cost and I've been able to be able to find any disclosure or discussion as to where these additional costs come from other than energies initial use of what those costs were when they applied for it. Now if you go through their slides and go through their dockets which again are are hard to to find and some of them are not finalized but with those estimates why the550 came in is that the initial estimates according to a judge were more than likely not reasonable and if you compare them to similar generation and surrounding states you'll see that those expectations and costs for a kilowatt are much higher elsewhere. unfortunately under the current form of Act373 consumers are already going to be paying the return on that ironwood and other projects because of how
▶ Play
let let me interrupt you for a moment your thoughts seem to be following some slides uhfirm that you're looking at I don't have
▶ Play
Speaker 263 1:33:51
sites this is just notes that that
▶ Play
are your notes because you you were refer everyone was looking for the slides so they're all slides on this he
▶ Play
Speaker 265 1:34:00
is better prepared so he has nice slides that's no problem please
▶ Play
continue but but I had several members who were were confused thinking that you that we were missing some of the
▶ Play
Speaker 248 1:34:14
PowerPoints my apologies just wanted to kind of a general overview of the history what has happened previously and and where Arkansas is and what similar state scenario also experiencing and through the slides that that we've been able to view just briefly some of the things that popped out at us that were concerning and lead us to believe that this is something that's likely to happen here in Arkansas as well and I want to mention that when we had those first uses in 1970 we had a large electrical demand increase and in the last 20 years we had relatively flat electrical demand up until about the last five years where this this growth has definitely occurred and we're not here to analyze the sources or any of that but we have a huge increase in demand. We have volatile pricing especially when it comes to gas turbines and this creates additional risk for anybody that's trying to do planning and right now the ratepayers are the ones that are on the hook if there are any hca hiccups that happen along the way so again I I encourage you to look at the slides and and get additional justifications as to why the approved amount differs from what they say the total costs are and those may be legitimate I I don't have those answers but it is I think something that's noteworthy and should be concerning to this body and what I would advocate for just as somebody who does policy analysis. The previous approach which was allowance for funds used during construction is something that is tried and true. they get the benefits when the projects are completed OK? In addition there are ways to phase in the rates so that current consumers are paying for what they're receiving but they're not subject to some kind of shock from electrical changes and also when we have this new generation and new firms are coming online that they pay their full way so large customers should be paying upfront if they are requiring additional new generation and then finally the cost caps should be established and the default should be to protect the ratepayers and require the utilities to justify it before they're given any allowances because right now the prudence isn't going to occur potentially until these plants are online which is going to severely limit what options the commission or this body has in in this situation and with that it'll be some other suggestions all let my my partner thank you doctor
▶ Play
Walter Doctor Olson it's all yours sir and turn your mic on again now get that mic on. I don't need
▶ Play
one I'm used to that projection in the classroom guys. right so let me talk about kind of the economic liberty component to this that I think a lot of times people haven't really thought through so a couple things that I wanna highlight at the very beginning is when we do a sea whip type project what we are essentially doing is requiring ratepayers to essentially finance essentially act as a bank for the utility to build that construction. Now whatever the writer actually is if it's $1000 or5,000 dollars or $10,000 or even 20 I don't get to pick how I spend that money that is now essentially mandated to me by the utility for this new infrastructure that they are deeming that goes into it now a couple of things that I do think are worth highlighting think the gentleman umpresentative Archer at the beginning was asking about if we give them a billion dollars will we get $1 billion more and I think the way our inclination is to think about it is in terms of rates of return but if you guys notice that's really not how the CWIP operates. You essentially get a benefit that's not gonna be like a rate of return when you traditionally think about an investment what I'm gonna get is yes maybe I have a more reliable grid but if my bill's higher maybe I would take a less reliable bid for a cheaper route etc. I hope you guys can kind of see the point that's kind of coming on with it the benefits may not be something that I choose to spend that money on that's there OK, so a cou couple different things that are worth highlighting again consumers generally cannot opt out the project may primarily serve demand that arrives later I think that's what we heard a lot from the previous speakers about projected demand and energy demand etc. I would just kind of highlight a couple cases where this has happened before if you guys remember back in 992,000 and2001 we had essentially a build out we call it the dot com stuff but it really was a a a we overbuilt fiber optic lines and it about took out several of the of the companies in Tulsa Williams is one of the the the most famous cases where essentially they overbuilt the infrastructure at the beginning expecting the demand to be there that it's not my point is only highlighting it's speculative OK so these forecasts when they're coming out they're not necessarily guaranteed OK I think you guys have heard enough about this the kind of the way the AFUdC and the C would kind of go through and operates again I think the biggest thing to highlight with this is the reason that probably the companies' prefer the CWIP is it improves their liquidity immediately so on under the old system of the AFUDC that's not necessarily operating cash it's getting generated it's gonna be on the income statement but under the CWIP that cash is actually coming in through the door right now now that may lead to lower borrowing rates but it doesn't necessarily translate into savings for the customers because there's gonna be all sorts of other things that are gonna matter whether it's going to be construction costs construction delays how things pan out in terms of permitting etc and all these other things that are there so it could lead to some savings but it's only gonna be very limited savings when it comes to the financing component it's not gonna be savings for the entire project per se OK again I highlighted this before I just want to highlight one more thing when you're forcing ratepayers to essentially pay CwIP. they have essentially a stake in the game with limited I'm sorry they have they really don't get to choose the rewards that they are essentially being forced to pay so when you go through and look at this I mean like I mentioned the example before if you're forcing me to pay 100 bucks to the utility to build this facility that's $100 that it could have spent at the local restaurant, right and and I don't have that choice when we're doing these type of writers etc that kind of comes in with it you know I mean I I get it you know if you can get somebody else to pay for your infrastructure that's a pretty good deal traditionally we've done this in terms of youU equity or we essentially go to the debt markets to do it but it's kind of unique that you have an entire system where you prepay for services that may or may not be needed or wanted into the future a couple things Jason mentioned this earlier where the nominal lifetime difference right now is 2.25 billion over the lifetime of the project the essentially present value terms for those that are maybe not as finance or economics inclined that just means hey how much is a dollar gonna be worth in the future and let's pull that to know how much that those savings are today now a couple little tricks or things to keep in mind with that when we're doing that it's called your discount rate are essentially the denominator in this present value calculation the saving s depend a lot on which discount rate they use and if I heard the previous speaker it was5.63 that was there and just kind of a rule of thumb for you guys the higher the discount rate you use the lower the savings are gonna be and and vice versa ok so if the essential discount rate goes down the savings would be a little bit higher ok a couple other problems with Cwhip again as an economist the way I kind of look at this is what incentives are you creating? I think one of the big issues that's been known in the economics literature for a long time is one is called avery Johnsonf effect which means that essentially there's a tendency to overbuild infrastructure if you get a guaranteed return on that project or you have a tendency to what we call gold plated and that means maybe tack on extras that you also get a rate of return on that aren't necessary are strictly necessary for the project itself there is the risk that you build it out and then it's just not needed or the demand doesn't necessarily translate that people have or to be honest with you guys, the technology changes right now you know it's about AI and compute and a lot of the the the demand for electricity is coming from that and that could be the case but again it's hard to predict the future it's kind of what end up saying with that ok so if you guys choose to stick with Cwhip a kind of a couple suggestions again I would definitely make sure you get some independent analysis on how this project actually is gonna pan out no essentially a meeting on the the modeling component to it I think a senator was talking about having the company pick their own independent auditor I think having companies do their own pick their own independent analysis or independent folks doesn't necessarily go that well we saw that with the financial crisis in 2007 and2008 where the rating agencies got things wrong so there's kind of a moral hazard problem that comes in on this I think we should you should put conditions in on that and then I would for sure be transparent with ratepayers about whatever benefits they are going to get my suspicion or my guess is that most ratepayers when they hear benefit don't think about it in terms of a conditional benefit or a counterfactual benefit they think about it in terms of the actual rate pa the rate that they're gonna pay for that electricity not you would have paid 16 cents per kilowatt hour but you're only paying 14 now they don't necessarily interpret that as a benefit they're like my rate went up by 2 or3 or4 cents per kilowatt hour and with that'd be happy to answer or take any of y'all's questions that you have
▶ Play
if I could start with something you just said Doctor Olson you you talk about completion milestones and all this it was it was mentioned earlier that there's possible incentive to drag your feet and and I guess what I'm saying is that to see whip create whether it was intentional or not an incentive for utilities that are using other people's money to not get in a hurry to complete the project because it it's an econou could be an economic benefit to them to move a little slower is that correct? Yes I mean
▶ Play
the my I think the incentive is definitely there to be honest with you like if I'm not gonna get any cash until my essentially plant is online and generated right that's an incentive for me to complete that project as soon as possible so that that cash flows in and the liquidity flows in if all of a sudden I'm getting essentially cash on the sea whip rider immediately there's not necessarily that incentive that's there so
▶ Play
it's like the difference between a person that's salaried how hard they work and how someone that's commissioned and how hard they work is that a maybe a more down to earth analysis I think so I mean
▶ Play
the best thing the thing I love about economics is incentives matter so I think that's
▶ Play
for sure I always say life's a series of incentives and disincentives but to take that another step there's actual real cases this you mentioned the vogel plant in Georgia took not just a lot more money it took a lot longer could you talk do you have those numbers or at least I I don't
▶ Play
Speaker 248 1:46:16
have those numbers but it's not a unique scenario. I mean even in Missouri back in the seventies when the Calloway plants that lasted three years longer than it was supposed to and I think it almost cost double the original plan and that's why they abandoned the other portions of the plant and this isn't unique to nuclear it's happened with colo and it's also happened with solar I I don't have those figures with me but I could certainly share them if you'd be interested in having
▶ Play
them if you could but it's it's fair to say that there are several instances of this that can be referred to yeah ratepayers have been burned I'm hoping this will work over here we have3 in the queue p re s ent ative beck
▶ Play
Thank you Mr Chair and as this was all explained to me that the advantage in the savings for the consumer is that we would be more or less paying the interest on what we're doing as we go along as opposed to holding it and accumulating until the end basically all right so my question is this why wouldn't you just give them the money to to the project just give them the amount of money that you're gonna pay for the rent over the next year would that not be the most effective way I mean you'd get more money you wouldn't be paying any at least on that amount you wouldn't be paying interest so for that make
▶ Play
sure I understand what you askssentially say hey here's a billion dollars go build the project a billion is too much I'm ok
▶ Play
I'm not gonna give you no but I'm saying you know it's it's probably only gonna be a very small amount of the project maybe 25cent or that you would pay over that year or whatever so why wouldn't you just give them that money up front I mean would there be additional savings to just give them that money upfront and there would be no interest paid on that portion by
▶ Play
Speaker 248 1:48:19
anyone I I would say it's it's in line with why we have concerns with CWIP's use right now what you're asking for is a greater investment upfront before people would actually receive any of the additional benefits and they'd be taking on even more risks cause instead of financing the bonds now they're actually putting the money into the plant so the exposures even greater and it's going to happen acutely at that very beginning which should be even more harmful for those that may not have adjusted their electrical usage at all
▶ Play
so I I guess I was just looking at it wouldn't that produce in the end a much lower rate for here on out like one model might produce a fort 14 cents per kilowatt hour rate versus the other model maybe a a tels beca because there's no interest being paid on that portion so
▶ Play
Speaker 248 1:49:18
basically they'd be paying less interest on the on the project as a whole that that could certainly happen if if they wanted to further expose themselves to that but this is all happening before it's providing any electricity so I mean you could get a rider that's huge and have everybody chip in now to pay for the power plant and they'd be paying no interest but that's a lot of risk that you've just exposed everybody to and at a time where they're getting absolutely none
▶ Play
of the benefits thank you thank youpresentative Beck vice chairir Grahamlick you're recognized thank
▶ Play
you Mr Chair. I think I understand your arguments for the speculative future stuff that makes sense but you know we're about to have to shut down two coal plants due to judicial decisions that's something we have to do we know that loss is coming you would argue that even though we know that's going to happen that we should not use a sea whip to try and save costs on consumers.
▶ Play
Speaker 290 1:50:25
can you steel man that just the
▶ Play
risk yeah I mean I think we're going to take a steelman the other side it's gonna be hey we can get the funds upfront conss it'll lower borrowing costs over the lifetime of the project when the funds come in we'll get see whipple enable us to have funds faster in order to get the generation quicker onto the grid that's the best argument I think that from from that side of it that's there and somehow with that because we do it now we will save interest costs over the lifetime of that project OK and that's wrong
▶ Play
for a project that we know we have to replace electricity because you're essentially using
▶ Play
your ratepayers as a bank without paying interest to your ratepayers they are not equity payers into this projectno model let me put it like this another thing you could do is issue equity take those funds and build the project that means you'd have more shareholders with what essentially CWIP does is say hey let's charge our customers now for the dollar amount that we need to build the project and then they'll get the benefits later or you could go to the debt markets and borrow that same amount of cash to build those funds and so I mean it's immense ly profitable for the company and that's why they makes sense to do it I'm just not necessarily sure it incentivizes what you want when it comes to
▶ Play
completing that project for the ratepayers so you're just like in principles we should not be doing this because it's bad for the ratepayers and they take risk. I think it's
▶ Play
Speaker 248 1:51:57
probably not the best thank you I think I would just add on that it changes the incentive for how the business would want to build those plants as well and that's something to consider between these two different plans because it's going to get evaluated when it's actually used and useful as opposed to them making all the decisions and being able to use those riders up front and so how a company is gonna behave under those circumstances is different because the incentives are different thank you thank youpresentative Grahambly
▶ Play
gentlemen I have used an analogy and I keep saying it all I better ask if you think it's appropriate and and and accurate when I was a kid a fellow named Sam Walton came to my hometown and found a piece of dirt next to the sale barn in downtown Conway and bought it and he built the store it's called Walmart he hired people he put fixtures in he put inventory in and and let's say theoretically when Mr. Sam opened that I went in and I bought a pair of socks and I would I be knowing that by buying that pair of socks I was not just paying for the wool and the knitting and the labor that went in to make them I'm also paying for the land and the building and the employees and the other infrastructures going in there so so he didn't come to me and say give me your money in3 years I'll bring you a pair of socks. he capitalism most cases seems to work where the the company finds the capital whether as you mentioned it'd be issuing more stock or or going to the debt markets getting a New York bank to to finance it but in this case as you said the ratepayers have become the bank am my is my soc analogy at least somewhat accurate I think so yeah yeah ok thank thank you moving along senator Hill you're recognized good analysis there Senator Johnson I will I will
▶ Play
say one thing just kind of to open everything up for everyone we've talked about replacing the energy sources out there that we have we have two coal plants that are that are being closed down we've got a got to pick up that volume but we're trusting the same people that are shutting those coal plants down instead of going forward and trying to see what the cost analysis would be between the coal plants and build a new solar project it makes no sense I think you guys said it exactly right a while ago when you talk about this we call it a fee that you pay a fee earlier or you can actually call it a tax from our energy group but it's every way you want to because they control the money once it leaves your pocket and what they're going to do with it would y all agree with that analysis? that's fair. thank you en ator
▶ Play
Hill I might remind you we actually have3 coal plants on the choc chopping block because turk down which is on Swepco is also on the chopping block I'm I still haven't given up on saving them I was told by someone with the EPA recently that one and he and she didn't say one which one was which but she said one of them you probably can't save one of them maybe you can and this is one of the things that I reached out to EPA because of the overturning the Chevron decision with loper bright which basically Supreme Court deemed that the logic by which entergy and Swepco conceded on the lawsuit that was filed and entered into a consent decree was based on erroneous interpretation of the law since Congress never passed the law that they claimed that these coal plants were violating so and and this was straight from an EPA official I won't name her but you probably know her senator hill but the again I'm hoping that we could save at least one of those coal plants maybe two I think turk is so new and so efficient that a strong case could be made that that that decision to close turk should be rescinded but that's that's a lot of speculation there but thank you senator for bringing that up Senator penzo you're recognized thank
▶ Play
you Mr Chair. the the argument's been made that this this will save interest on borrowing money to build the plants I guess I guess the way I look at it to counterarguing could be made that if the average Arkansan has5 dollars to $10,000 of credit card debt. Average interest is 20% on those credit cards. As an economist, would you say that the the rate of borrowing that money is probably 20% and on the flip side a corporation's getting to stick that money in an interest bearing account and make interest on it while the ratepayers' financing it arguably 20%
▶ Play
yes I would agree with that and I'd say you're better
▶ Play
off paying down your credit card debt I would agree thank
▶ Play
you thank you senator senator Bryant you're recognized thank you Mrir. So I'm just comparing this CEP process to the regular process and it's just from my recollection during as we approached this process whether we as ratepayers act as the lender throughout the build process or whether we let the utility as a as a regulated monopoly go out to the market and borrow that money. they're still going to roll up all those costs and push it to the ratepayer and so is it you know I hear these conversations but at the end of the day the ratepayer's going to pay those interest costs whether we pay it now to the end of the construction or wait till the construction is finalized and push it out another five years. So today's dollar is cheaper than the dollar in five years. you know inflation and like you know economics determines that but is that not still the process? Well yeah but one thing I
▶ Play
would end up saying with that is if you roll it up now you're like let's say in5 years you might have additional people that are moving in because of the additional power sources that are there etc. that then on their old way they will start sharing the cost of that bill as well or the the the interest costs as well and so yes you will still end up paying the interest cost for that I mean that that's definitely true I mean the way that it's kind of worked out but I think that if I'm given a welfare analysis meaning I don't mean like just financially. I think the ratepayer's better off without the C whip and then paying later when it
▶ Play
Speaker 302 1:58:48
comes rolled in if I could just expand on that too,
▶ Play
Speaker 248 1:58:52
I think it's always important to note that that plant depreciation can happen over 30 years and how long any of us or one individual is gonna live matters and if you're now buying electricity you're going to be paying for something you're not gonna get the benefits so from an individual when you look at that analysis it's important are you paying for what you're actually receiving or are you paying for what somebody else is going to receive and the second part to that in terms of the accounting and and the mechanism we still have a difference in an incentive that's gonna happen between the two but just to tie back to some of our suggestions additional and you know analysis of when those costs change even if you stick with the sea wave approach would at least provide some due diligence when they make those adjustments so even if it maybe not a complete overhaul but that oversight is gonna matter and with the previous version it happens when the project is done whereas now it could be a long time before you know what they're doing and you're able to do that analysis and if I can say one thing there's also additional ways to get new
▶ Play
generation you know what I mean like new power onto the grid. it doesn't necessarily have to always go through this one way I mean there's essentially behind the meter generation other alternatives that are there that are options we
▶ Play
Speaker 248 2:00:16
we didn't want to throw out radical ideas but there is competitive procurement where you can start having a bidding process for anybody to start creating their own generation that doesn't have to be controlled by a regulated monopoly but there's there's other options out there too. I'm just saying that I don't think the current one is is good and I I would suggest a different route that would help out the state
▶ Play
with no further questions gentlemen thank you for coming appreciate you and we'll move on to the next panel is thank you sir Mr Steveris with Walmart and Miss Lauren Waldrop with the Arkansas Advanced Energy Association if y'all will come up and think y'all are experienced enough you know the drill welcome please pull the mic close and introduce yourselves for the record
▶ Play
Yesir I'm Laurenwaldrip executive director with the Arkansas Advanced Energy Association. and Steveris, group director utility
▶ Play
Chair Unverified 2:01:21
partnerships at Walmart. thank you both and either can go first
▶ Play
whichever how y'all want to work it out it's ok with you Mr Chairman. I'll
▶ Play
go of course good afternoon Mr Chair. chairs and members of the committee. my name's Lauren Warop and as I said I'm the executive director of the Arkansas Advanced Energy Association on a personal note, I will share that I'm actually supposed to be on leave right now as my husband and I mourn the loss of our son earlier this month but I felt it was important to be here today to share what we've learned over the past year and a half about a policy that impacts so many Arkansans. AAEA is the business voice for advancedgy in Arkansas. We represent companies across the energy economy including Walmart and a central part of our mission is advancing policies that support economic development, job creation, affordability and reliable in a reliable energy system capable of meeting Arkansas's growing needs. Our intent today is to provide some insight into what we've learned now that we've seen Gaza implemented into practice. The Arkansas Advanced Energy association and Walmart were two of only 13 parties that intervene in intervened and entergy Arkansas's first annual Gazarir proceeding and we participated in that case we reviewed those filings and we saw firsthand how that policy translated into customer rates. So I'm going to keep it pretty highle today some of the things that I just want to mention prior to to Steve sharing his comments have been touched on earlier so I'll in the interest of time I'll be quick but there's three main things that I particularly think are important as we consider what we've learned in this past year and a half through extensive discussions on this topic. first of all, I economic development has to work for both the businesses we're trying to attract and the customers who were already here. Senator Hill, I want to thank you for some comments that you made earlier specifically to that notion we understand the intent behind Gaza. We certainly need more mechanisms in place to get more energy on the gri d as soon as possible and we don't debate that but and we certainly need to to continue to enable competition for major economic development opportunities. do other states use this these C whip types of mechanisms as part of that strategy absolutely but many of those laws look quite different from the one that we have passed here in Arkansas. They include stronger customer protections, greater sharing of construction risk and clear safeguards around what happens if a project is delayed for example or if there are significant changes or the project really just never comes to fruition. A lot of states have things in their policies that protect ratepayers from bearing that risk. they also provide clear protections to ensure that when a project is supported by payments or commitments from the new customer driving the investment that those dollars are appropriately recognized before those costs are passed along to existing customers and I think the numbers that were shared today with the publiclic Service commission we're very very telling about what that looks like for for our existing customers. So if we're asking our candidates to begin paying for infrastructure years before they receive power from it. I think it's reasonable to make sure that they receive meaningful protections in return. just to that first point I think it's also worth noting that as we do increase costs on energy those are also t taxed so we're essentially increasing taxes just the same Second we need to recognize the opportunity costs and risk that we're shifting to existing customers. Doesaza reduce financing costs that would otherwise accumulate in the form of AFUdC absolutely there is a benefit to doing that but we accomplished that by requiring customers to give up their money earlier and so for example for a manufacturer those dollars could use to be to buy equipment for a small business those could be used for working capital for a family they could pay down debt a credit card was mentioned or even just simply used to be invested but Gaza recognizes that entergy's capital has value and compensates the utility when its money is tied up in construction. but I think my point here is that customers' capital has value as well. That doesn't mean that so youwa recovery is inherently bad. it just means that the the appropriate question should be whether accelerating those payments produces a net benefit for customers after considering the timing and opportunity cost of their money. and for some ratepayers that might look like similar to me paying into socialcial Security and I will never see that money and so just to kind of put that in perspective and then my third note at the end of all this Arkansas still needs more power that was very apparent based on conversations from this body in the previous legislative session and I think that that's something that we can all agree on. I did want to clarify a statement that was made earlier uhpresentative senator electwooldridge regarding your energy deficit question. our friends at the utilities have told us that we will have an energy deficit in 2027. You can look that up in the integrated resource planning docket, um07016u and they're June 17th filing. we are projected to have an energy deficit next year. So I just want to be very clear about what the utilities have told us in that and that's not that's not our projection that's that's entergy's own resource planning showing that shortfall so while customers are beginning to pay today for billions of dollars in new investments we still have to confront the fundamental problem that these policies are supposed to help solve which is having enough affordable reliable power to support existing customers and future economic growth. Senator Mcee, I've heard you say on multiple occasions no one cares what it costs if it's not there right? and we we simply have to have it there that's why I think it's important to remember that that this policy mechanism is for financing. it's a financing mechanism it's not itself an energy strategy. so other states are also giving large new energy users more options to be a part of that solution. a lot of them may require these new users to bring their own power to grid some just give them the choice in Arkansas we don't even give them the option to bring their own power to grid. if a company wants to come to Arkansas create jobs and invest billions of dollars and is willing to help bring the power necessary to serve that investment. I think our policy should at least give us the flexibility to consider that so none of these issues requires us the good news is to choose between economic development and protecting existing customers the good news is that we can do both. Our goal should be to preserve the ability to move quickly while adding reasonable cu customer protections creating more options for bringing needed generation onto the grid and making sure that the benefits and costs of growth are fairly shared across the board. our association has been deeply involved in these proceedings where these policies are being implemented over at the regulator at the publiclicervice commission and so we we would love to continue to be a resource as this conversation continues and so with that I'd like to turn it over tosteveris as he said he's the group director of utility partnertnerships for Walmart to talk about those issues from their perspective thank you Mr Chairman and the committee for the
▶ Play
Chair Unverified 2:08:56
opportunity to be here todaygain my name is Steveris, group director uttility partnerships for Walmart amongst other things my job responsibilities include oversight of statele utility rate matters including regulatory dockets such as those before theublic Service commission and utility related legislation. Walmart is proud to call Arkansas home and has made a large investment in the state. We employ over60,000 associates at 128 stores, a distribution centers and our home office in Bentonville. Additionally, Walmart supports other Arkansas businesses and our fiscal year ending 2025 we spent 13.5 billion with Arkansas-based suppliers supporting over37,000 supplier jobs in the state Walmart, like all Arkansas businesses, needs affordable and reliable power to serve customers in our local Arkansas communities around the country and globally we take electric service from 26 electric utilities in the state over the last five years the cost per kilowatt hour of electricity delivered to our facilities in the state has increased over 20% for all utilities statewide. while our Arkansas statewide cost per kilowatt hour is significantly less than several bordering states when we look at particularly Texas as a competitor or a comparator sorry it remains about 20% higher than our cost per kilowatt hour in Texas. it's important for the state's public policy to to support economic development and a step was taken with the generating Arkansas Jobs Act of 2025. while we are still early in the law's implementation, the legislature should examine lessons learned to date to ensure that the law can achieve the objectives of bringing economic growth and jobs to the state in a manner that recognizes that affordable and reliable power is key to all economic development in Arkansas d d ition ally the law predates President Trump's White House ratepayer protection pledge which was signed by AEP entergy and OGNE as the legislature reviews energy policy for the 2027 session, Walmart encourages aligning any potential changes with the purpose of the pledge. Thank you for your time today and happy to take any questions. thank you
▶ Play
very much Mrri I'm glad you you brought up the the ratepayer protection pledge and the fact that President Trump had done that and I'm it's a little ironic that right after that we we got the sea whip rider come in but we're not worried about Walmart leaving Arkansas and we want to thank you for being here was my analogy about Mr Sam coming to my hometown and putting in the soxx is that is that would you say that was accurate as far as how we're changing things I would I mean yeah to your points essentially when we
▶ Play
Chair Unverified 2:11:34
build a store and we put the products into it we're making all that investment with the plan that we will be able to sell products to the community and ultimately if if the community shows up great but if they if we're not doing what the community wants in terms of being a seller or a store in their community and they don't show up that's risk that we take as Walmart and so that yeah essentially captures it we're not prech ar g ing everybody for the socks we may sell you in the hopes that you may or may not show up
▶ Play
as a regulated utility you don't have to worry about a competitor where Walmart has to worry about somebody else that we might sell
▶ Play
Chair Unverified 2:12:14
those socks that's correct and yeah one of the the interesting things about Chi because you know utility regulation is a process that's set out in the absence of a competitive market for the product the utilities are granted monopolies and are regulated as such and part of the reg the broader regulatory comp act there's no real analog for that on the competitive side we all have to put our best foot forward using the sock analogy sorry that was it's been a long day and whether or not customers respond to that is up to the customers so whereas again the utilities just don't have that and so when we look at like the returns that we would see in a competitive market versus the returns that the utilities have things like Cwhip need to mean or the people who are making the decision about what the appropriate returns are need to remember that in the competitive market we don't have these sorts of prepayment structures like that thank
▶ Play
you ok we have a few people in the queue and we'll start with senator hickey you're recognized thank you Mr chairir
▶ Play
just blunt right here so I wanna make sure I fully understand what you're saying you're sitting up here in our position you repeal Cwhip you try to amend it what do you do? Wow that's a good question
▶ Play
Chair Unverified 2:13:38
I think there are there are a number of things that can be done I think part of it depends on how deep you want to dig into the bill. historically Walmart's advocacy on CWIP has been to oppose it for the last two gentlemen did a great job of sort of talking through the technical and risk aspects of it and we've brought up those those points in many dockets in a number of states but the other piece I think is you know looking at the ratepayer protection pledge as an example is how are we making sure that when Google or another company comes in costs are incurred for that project that the the monies that they are spending or the the checks they're writing whether it's kayak or something else are applied first so that an a mechanism like Gaja becomes sort of a backup and balancing mechanism not the primary funding source for those projects so that's you know certainly one way you can look at it one of the other things that the legislature could look at is really aligning the rate of return that's assigned to assets that are in the aucha rider similarly to how they assign all of their assets because my understanding is that the the rate of return is higher forgaa assets than they are for regular assets so there are a couple of technical changes that could be made to sort of soften it if the legislature chooses not to
▶ Play
do a full repeal. Mr Chair, if I might just add umler ok from a big picture standpoint Senator hickey we are really kind of to the point now with our resource planning that the way that we've always done it is not working and that's become very apparent as we're coming up on a on a deficit in a few months right? and so you know we've got the annual FRp we've got rape cases right now we're in rape case negotiations with interreg Arkansas for the first time in 10 years that we've had a full blown rape case. Now we've got Cwhip or Gazza and so we're getting to the point where it's kind of piecemealed together and it's all still obviously insufficient and so I think it's important that we take a step back from how these conversations have historically happened and really take a big picture look at how we can optimize the different resources that we have available to us in a way that is most conducive and fair for our ratepayers. well I'm struggling with this just to be
▶ Play
honest which way to go I mean whether to do you know again it's up to this body 18 in the senate51 in the house and that'll be what happens but you know from my standpoint and I usually always try to look at everything from a policy standpoint but you know this one's actually went a little bit further even from a political standpointhait team use that word here but I'm I'm going to because you know it's reality because what I see that has transpired with all of this because of taking this money upfront not putting it towards the cost of the construction hearing all this other stuff worrying about you know we might not be building the thing as prudently as possible you know whether or not that's that's true or not that could be the perception out there we have this as a wine item on the bill which I fully agree with you know so even if this body got in here and tried to amend it at this point and got everything perfect, you know and said well the legislature has fixed this that bill's gonna continue to come out that line item is going to continue to be there everybody in the world is going to be showing their bill and saying I thought the legislature fixed this and we're still getting these increased costs on there so I'm gonna I do struggle with it and that's more of a comment Mr Chair, but I just think it has to be factored in with all
▶ Play
of this so thank you and I appreciate your comments today. thank you
▶ Play
senator hickey senator Penzo you're recognized thank you Mr Chair. I'll go ahead and just dovetail off what Senator Hickey said and I I think we should repeal it and go ahead and pass that piece of legislation that would allow the streamlined process of energy production behind the meter that would eliminate a lot of Arkansas's deficit issues coming forward have a allow a data center or another corporation to come in and build their own production the process right now is overburdensome and it needs to be streamlined and we had legislation before us last time so I'd like to see this repealed and that one passed that would be my choice but so my when when Mrris sat down the first thing that popped in my head and you know, I hear from constituents or or I guess I should say people in central Arkansas that have said oh my bill went up 20 bucks or some people that have big farms hundreds of bucks and some people even thousands and I was like wow what kind of burden did this put on Walmart do you are you able to disclose what kind of figure a monthly rate looks like for Walmart corporate? I'm probably I probably can't
▶ Play
Chair Unverified 2:18:47
but happy to work with our government affairs folks and and figure out how
▶ Play
Speaker 347 2:18:52
to get you a picture of that information OK well you I'm
▶ Play
ok with that answer since you don't have a contract with a regulated utility I brought up earlier about the the300 million dollars option and the other option that was going to cost300 million less and we went with the more expensive option for the ratepayer. I don't know Miss Wadrop, can you elaborate on how that structure works and how how maybe entergy might net more by going with the more expensive option I can certainly
▶ Play
try senator Peno I think one question that I did notice so I will say Danny's numbers today that was the first time that I had seen those so I was dissecting them just just the same as you were but to to be clear it's my understanding that the PsE just told us that because interg chose not to apply Google's payment as kayak that is costing an extra308 million dollars and I'm not sure you know exactly some of the different components of the math on that based on just the annual one question that you asked was regarding the higher return that the utilities get to receive when a project is in Cwhip and so 11 clarification that I would make is that the two are separate. and so they receive a higher return on those C whip projects of that 8.63% compared to a lower percentage in traditional ratemaking prior to C whip because of how they wrote the law and so because that because of the way that they figure weighted average cost of capital you know this is something that they've been trying to do at the public service commission since the eight0s and the publiclicervice commission has said no we don't want to penalize customers for in the way that we figure that and so when entergy wrote that that language they took out accumulated deferred income tax and when you take that out of the weighted average cost of capital equation then that makes that return and that percentage that they receive higher. So those are two whether they had applied google's payment as kayak or not they were still going to receive that higher return on the C whip projects and then on on top
▶ Play
of that, I mean isn't this kind of a a a risk shifting because I mean here here here they're getting a certain rate of return on their equity and the risk has been shifted to the ratepayer now I mean I don't know or or and this may not even be a question you can answer because this might have been something I probably should have asked the PSC but I don't know that they're, I mean are you are they still going to get the same rate of ROE when the rate the risk has been shifted to the the ratepayer instead of the investors is that something that either one of you could elaborate on so and
▶ Play
Chair Unverified 2:22:04
there was some discussion in the earlier panel about receiving the cash now so it improves a number of the different financial metrics that the company has during the period of construction relative to what they would be if you know they did traditional AFUDC financing to the extent that that then flows through to the return on equity I'd have to ask my return on equity expert who's sitting behind me and not on the panel today but so we can get you that information but I think the risk piece is real you know we take service from electric utilities in all 50 states we got to experience the VC summer failure in South Carolina and paying and in several million dollars in rates for a plant that never came to light we were there for from the beginning for Vogel and got to experience all the delays and cost overruns and things like that and you know the the the stories go on and on and so there is a real risk that's out there but I think one thing that is a little bit s ur pri s ing about the application of Cwa appear in Arkansas versus what we see in other states is that it is it's being used for resources that traditionally don't get seawIP you know the broader national discussion for CWIP is really around nuclear construction because of the long lead times the amount of regulation that goes into constructing it is is pretty intense you know a change order can require a whole new review even if you're just moving cables from here to there so it's when it's been used it's been used as sort of a mechanism to manage the risk of a project that's going to take between 8 and 15 years and cost you know 10 to15 billion dollars for gas plants for solar, for things like that it Cwhip is not necessarily like the the first tool that somebody would go to in order to say you know we need to use this so that we can finance these projects
▶ Play
you are back in the queue, Senator Penzo but I'm going to ask everyone to move a little quickly I will since you got back in but we'll we'll go
▶ Play
Speaker 158 2:24:17
go go ahead senator you're recognize accidentally dropped out
▶ Play
that's fine I don't know if either one of you can answer this question my my understanding is that cyprus solar is gonna generate600 megawatts and that's if the sun's shining so my other previous statement you know that's that's assuming my understanding also is that uh450 to600 megawatts of usage is what was reported I have of course we haven't got an answer because it's been redacted but that's my understanding from other sources so if if the sun's not shining and they're using that capacity then that burden's going to be put on the existing system and like I said, I don't know if y'all can elaborate on this or not. you know this might be a better question for somebody else but my my understanding is that we're creating three new power generating sources and we're going to be that's going to be at the rate of a billion dollars to the ratepayer and we're going to be producing less energy than we are solar is not dependable baseload production sun's not always shining we could figure out exactly what the average rate is but I mean we're that's going to be a deficiency we already know that the two natural gas are deficiency so I mean could either one of you say whether or not you think that this power production will be less than we're actually at today with when the the data centers online yes sir so I think from a fuel type standpoint. I don't know
▶ Play
that that's exactly the premise of the conversation today but we do know from a dispatchability standpoint that cypress solar does have a350 megawatt battery when it comes to the three projects that were included in Gaza and how that translates to folks bills and just our um, our capacity from a grid as a whole. we know that Ironwood is essentially a replacement for like Katherine we know that Cyprus the majority of that power entergy has told us is for google's data center and then we know that the Jefferson power plant is about 800 megawatt to replace the coal plant which is about 1800 megawatts so simple math tells us there that we're still at a net shortfall when it comes to new power on the grid. so we've seen an increase in FRP we've seen in we're they're asking for an increase in the rape case right now and we definitely saw an increase with Gaza this summer. and at the end of the day we know that those costs are being cost from Cyprus which is you know for a a data center energy project and we know that those costs are showing up on customers bills
▶ Play
regardless of where that energy's going well thank you maybe maybe entergy can elaborate on those questions when they come up and then somebody informed me that the rate went from roe went from6 to8 % while under sea whip so risk was shifted rates increased of returns so I was just told that was confirmed today since I asked the question so I just thought I'd let everybody know thanks for your answers. thank you Mr
▶ Play
Chair. thank you Senator Penzo Senator Hill you're recognized over here I
▶ Play
would like to see the the information from your analytical man since he's not up here or lady whichever one it is that that that has that information I'd like to see that that Miss Waltrip can get that to me offline or whatever I'd greatly appreciate that and know Senator hickey would like to see
▶ Play
it as well if y'all will provide that to the staff we will see that all members of the committee get it Maler yes
▶ Play
sir because when it comes to analytics Walmart's pretty darn good. question for you is did did you say a while ago that Texas is 20% higher than Arkansas ownnergy or or that my good net reversed uht Texas is 20% lower 20% lower OKok I wrote that down wrong I guess I'm used to them just being bigger than everything. I I guess in a nutshell with with you answering my question I had to ask one to say I think we've actually just kind of got through the keywords out a while ago I think we've shifted from a a ratepayer protection plan that we we should hear for should have for the people here who are paying these rates to a to an energy profit plan so I guess I'd appreciate those analytics thank you
▶ Play
thank you senator Senator Mcee you're recognized Thank you Mr Chairman
▶ Play
thank you both for being here today. I read an interesting article last week and I was wondering if you'd maybe answer some questions on it realalClearnergy reported that the advanced energy association in Arkansas the foundation received $1.3 million from companies who are being scrutinized for having ties with the Chinese Communist Party. so I wanted to make sure that y'all have disclosed that relationship with the secretary of state and just make sure that your goals are not aligned with the Chinese Communistarty.
▶ Play
Speaker 363 2:29:51
so Senator Murkey you're telling me you believe that article.
▶ Play
I'm saying that was what was reported and I know that the Louisianaublic Service Commission is considering having intervenners report their sources of funding. I'm just saying what I read and this is important to me this is an important that as Americans we are looking out for what's best for America we know that the Chinese Communist Party is spending hundreds of billions of dollars to subvert our infrastructure and the way we develop to discourage the building of data centers and do all those things so when that kind of thing is reported I think it's extremely serious and want
▶ Play
to make sure it yes and I would say that first and foremost as you know from our conversations one on one our organization is Datacenter neutral. In fact, Google is one of our members and we support data centers that have that are good neighbors that have responsible energy procurement policies and that are transparent and so to say that we are first and foremost against data centers is not true and to say that and to and and well and I just want to correct the record and to say that we have our organization that is pushing for affordability and national security through getting more energy on the grid would have any sort of relationship with China I think is is quite outlandish. I would also say that that was bad reporting because they did not call and get a quote from us. They did not call and run any of those allegations passed us and I I don't think it's merited to give such a false article any morere time which I think is very valuable to this
▶ Play
body received funding from thenergy o und ation which has no ties to China
▶ Play
Speaker 365 2:31:30
yes it's a it's a that's not true ok that's very she answered
▶ Play
Speaker 185 2:31:34
your question Senator Mckee thank you Representativewooldridge you
▶ Play
recognize. thank you Mr Chairman and first of all I
▶ Play
just want to say appreciate you being here and I'm sorry for your loss I can't imagine how difficult that would be so you're definitely in our thoughts and prayers I do have a question and may be appropriate for you guys or it may be appropriate down the agenda and I may ask it again but when we talk about a $1.6 billion investment there are two approaches right? so they're the cooperatives which I'm part of a cooperative and an owner in an electric cooperative I guess per se I'm a customer for Craighead Electric cooperative. so as a ratepayer making an investment or paying towards a $1.6 billion investment that the cooperative owns is different than paying for an investment of $1.6 billion that's owned by a private company right so I guess my question would be what is the skin in the game for lack of a better term for the utility if it's not a cooperative owned and I'm not picking on this particular utility it's just the topic that we're debating so what is their skin in the game? Do you know is that clear what what is the investment from the utility if the project's being leveraged by a private partnership with a data center and then the rest of that is being paid for by ratepayers yeah so I mean the traditional model in
▶ Play
Chair Unverified 2:33:07
the investor owned utility world is that the utility would go out and source equity or debt financing for the project build the project you know using that financing and then when the project comes online and is used and useful in the service of customers those customers would then start paying for that and that would include the cost of the financing plus the interest incurred during the construction period so you know in that in that case the utilities investors whether they're you know equity holders or debt holders are the ones that have the skin in the game the utility is essentially their representative because they're the ones who are responsible to their investor and then you know there's regardless of how you finance it the utility's still responsible for the operation and maintenance you know ensuring that the resource is used useful and does what it's supposed to do so when we moved to a Cwhip model it does take I mean it certainly takes a lot of the lift off of the utility shareholders however the utility shehar excuse me the utility shareholders are essentially still compensated based on the rate of return for what comes from that asset because you know when you do CE you don't then go and create an offset to the return on equity to recognize the reduction in risk you know the return on equity stays the same unless something very specific is done so you know the utility the utility still has all the operational stake in the game they still have all the resource planning and there's still a lot that goes on outside of the financial piece of it but it does basically take their shareholders out of it and still reward them for it it's a great deal for them
▶ Play
it seems as such it's good it's good work if you can get it. Yeah thank you I appreciate Thank youpresentative are you back in the queue Senator
▶ Play
Mcee? I will recognize you very briefly thank you Mr Chairman you mentioned a minute ago that Walmart or Texas energy prices are 20% lower than Arkansas. who does Walmart buy its energy from in Texas?
▶ Play
Chair Unverified 2:35:29
so Texas is a mix of traditionally regulated territories so that is outside of the Urcot market which is the bulk of the state so there looks a whole lot like here so entergy El Pasolectric AP's got a subsidiary in that area xcelnergy as well and then there's some co ops and municipal utilities within the airco market we basically buy our power through a a licensed supplier down there and they go out to market they purchase the power and then sell it to us one of the things you know when we talk about resource development we're talking about the $1.6 billion for the resource here in the airco market if if you know a data center or any customer wanted to do a resource like the solar resource that's in question today they would just go out and contract for it the bulk of other customers would never see the cost for that because the developer takes on the risk their counterparty and the deal takes on the risk and then however that that resource operates all customers see in the market but when you bring on a resource like solar it doesn't it's a zero marginal fuel cost resource so it can bid into the market lower and and can bring down market prices so there's a big chunk of the discussion today that we don't have there because those dollars don't ever enter regular customer bills but does Walmart own an energy subsidiary in Texas that
▶ Play
supplies its power. we continue to own that subsidiary but we no longer use them
▶ Play
Chair Unverified 2:37:00
no longer use them we can you talk about that a little bit we given the breath and sophistication of our operations particularly particularly as we grow we made the determination that working with an external third party would be a better fit for our energy supply needs there ok and your numbers remain the same
▶ Play
working with that third party the numbers change with the you know the
▶ Play
Chair Unverified 2:37:23
the market looked at one way then it looks a different way now so it's it's not necessarily comparable but we believe that the change that we've made has been beneficial thank you very much you're welcome if there
▶ Play
are no further questions thank y'all for coming your presentation next we have the effect on agricultural businesses I'd like to ask Miss Laurri Caveous, Mr. Don Kittler, Miss Wendy Stackxx, and Mr Cory Scardda who are all farmers if they would come to the table thank you all for coming. there's a button on your microphone if y'all would one at a time push your button and introduce yourselves for the record and then we'll move my name islourri
▶ Play
Cavan Andwindy stock I'm a farmer from prairie County. Don Kittler, carlisle Cory
▶ Play
Speaker 379 2:38:43
Scardda a farmer in desert thank you all for
▶ Play
coming and I I contact your or your some of you were referred to me I I called a couple others that were your senator or representative referred you to me so wanted to give you an opportunity to tell your own story about how the the sea whip has affected you both in amounts and in in other ways and and I guess you get to go first
▶ Play
Speaker 380 2:39:11
Miss Cavanus OK we farm in the prairie in loanoke County area. first I was it really upset me which maybe I don't pay enough attention to things that it it's like it just appeared on my bill and I had no idea you know it almost felt like somebody just kind of slipped it under the door. Here it is you know and this idea that it's only5 dollars a bill is absolutely ludicrous dollars77 cents was was the quote yes ma'am go right ahead I'm sorry because when I first noticed it it had added close to3,000 dollars to my collective bill, I brought these packets of some of it's just a sample of some of my bills if anyone's interested and I I was like oh my gosh, what is this? you know the archi whatever and so then I start noticing that it's on all my bills and I had no idea what it even was and so I I and this is just this is only a sample I want you to realize that I did not was not able to get all of my bills together because that would be quite a bookkeeping feat but for just the past three months it has added a total of around $25,000 to my energy bills that represent wells, grain bins, homes that we pay the bill for our people that help us and it's unreal and then if this is going to keep going up each year by the end of the time it will be $100,000 and that like I said it's not even all of my bills. so with all the costs that we are incurring anyway the6 dollars a gallon diesel, the you know low prices and everything it's a blow. it's a real blow and it
▶ Play
Speaker 383 2:41:18
was very very upsetting so that's uhstaxs there's
▶ Play
Could we finish each one senator hickey you can ask any of the ones you want to ask at that point but Miss Stacks you'll go ahead and then we'll we'll finish followlo you and then we'll come back
▶ Play
Speaker 388 2:41:41
for questions.'m kind of likeurri. I was just going through my bills and trying to figure out why they were so much higher for the month of June and then they had been previously. I know it was a you know it's very dry year. We had really, you know, watered a lot but we didn't grow rice this year at all. it just wasn't economically feasible so we chose to stick with soy and corn. so honestly my bill should have been lower because it takes a whole lot more water for rice than it does for soy and corn. but they were they were more and about my totals we're relatively small farmers. We farm about 1700 acres and then my brotherin-law and sister-in-law farm with us and they farm about the same and but between all of us it's about an added $12,000 and I know you know in the big scheme a lot of people think well that's not a lot but it is when your bottom dollar's already gone. and our bottom dollar went three years ago. We don't have any more dollars to spend. you know it's adding a dollar to $2 per acre per month. and and you know it started in June this year.ext year it's going to start in april when we start watering you know our crops then that's gonna be so much more and we're already at a higher rate because of agriculture agricultural pumping is a higher rate than a residential customer and there's just not any like I said there's just not any more dollars to go around and I know y'all ask some questions and I really I'm glad you asked the hard questions of people that were here today because those questions need to be answered. there needs to be transparency it's just it's terrible to open a bill and you know, find out that way that your legislature put this on you and and I know we need more energy. I'm thankful for energy. Every time my lights go out for two hours I'm very thankful for energy. I'm thankful to have the ability to pump that water on my crops or else I couldn't make a living. but y'all y'all asked the question about who's who's getting the tax break? I can tell you who's not getting the tax break and that's Arkansas's largest industry agriculture We're taxed on this. we're being taxed on the generating Arkansas Jobs Act we didn't get a tax break we didn't get any break we're not a data center. we're not a steel mill. we're not Walmart. but we spend how much money a year in the state if it wasn't for agricultural agriculture in the state we wouldn't have much of a state and we're getting the brunt of everything. Every time anything comes around we get hit the hardest and it's just I thank y'all for listening to us today. I thank you for the ability to come here and I just really hope that you will consider repealing this act thank you thank
▶ Play
Speaker 390 2:44:45
you Ms Sttaxx and go ahead Mr
▶ Play
Speaker 391 2:44:48
Kitler you next what it boiled down to was basically a5% increase in our electric bills my august bills I didn't go through all of them but the generating jobs actct part of it was $12,760 but in a nutshell we got a5% increase and this
▶ Play
is in addition isackx said to the cost of diesel fuel that you didn't have last year at the at6 dollars a gallon almost you
▶ Play
Speaker 391 2:45:18
got the formula plan that's up50 something% since 16 or 17 generating jobs act and then we're paying sales county and state sales tax on all that it's a pretty fair little increase I would say so yes sir it kind of showed up like she said like what is this generating Arkansas Jobs Act you know and you have
▶ Play
to google it to find out what it is well it was someone had an art had a letter in the paper that referred to it as gotcha and I maybe that's appropriate thank you Mr Scarta they let you you're
▶ Play
Speaker 395 2:46:01
get back clean up here I don't know how good it'll be at that but my name's corey. I'm a thirdgeneration farmer and desart my grandfather started the farm in the fortiess after World War Two after he got back from that and he he signed up he wasn't drafted I'm pretty proud of that anyways you know I I didn't really know much about this till a couple of months ago I think I may have saw Wendy's Facebook post. and then I got to looking in it and and just kind of trying to see what's going on and and farming is tight farming's been tight for a lot of years but the last five or six years have been really been tough inputs are high cost of everything's high and at the end of the day farmers don't go home with a whole lot but next year I know I've kind of ran the numbers next year it looks like I'll probably be paying her I farm3,900 acres me and my brother and we had33 electric wells across three entities so next year we're probably going to be paying 3 $0 to40,000 dollars extra dollars in this fee this generating Arkansas Jobs Act and you know I I kinda laugh at the name of it generate Arkansas Jobs Act because the data center for a trillion dollar company in west Memphis isn't really gonna benefit me when we're struggling to make it each year and they can pay that out of their pocket and not feel it you know that I told you it's gonna be north of30,000 dollars I paid I'll pay next year with the last at least the last three years I took less than that home at the end of the year when all the bills were paid so it's kind of a slap in the face to just a good old farmer country boy that a trillion dollar company gets to gets to get the money up front when I go to pay for a tractor buy land I got to go to the bank and get it I don't get to go take it from somebody and don't have to worry about it so that's all I got to say thank you
▶ Play
Mr. Scart senator hickey if you'll punch in we'll we will put you in the
▶ Play
queuesenator hickey you're recognize enough but this this lady on the end I apologize for your missus yes ma'am. you said in three months it was 25,000 just to be exact though are you talking about the the wine item itself for the generating jobs is that what you're saying was an additional 25 so we can figure yours is averaging about 8300 a month. for that line item and this gentleman down here was 12,760 I heard that was for one that was for one month for you yes sir right. I just wanted to make sure that we were getting those numbers exact. I appreciate you all being
▶ Play
Speaker 388 2:48:56
here also say this you know farmers are we've we've always been said this but we are price takers not price setters we have to take what anybody gives us for our commodity. We don't get to tell anyone what we want for our commodity that's told to us. there's no way for us to recoup any of this where it's just you know it's added on you know energy's going to recoup google is going to recoup. we're gonna get nothing back out of this and we're paying for it now. we may not be in business in five years. We may not be in business next year. I mean that's just how serious it is. so I just thank y'all again for for listening to us. Senator Mcee, you're recognized for a question
▶ Play
thank you Mr chairman thank you all very much for coming. I appreciate the work that you do. I know it's not easy. I'm not a farmer and my dad always said I was all hat and no cattle. I know that things are tight right now and what we appreciate the work that you do so the legislature last year was presented with a situation right with the closure of the two coal plants because of the Sierra Club suing entergy under the Obama administration for carbon dioxide they were releasing entergy is gonna close those two coal plants and so we have to build new generation whether we bring data centers in or not so when we when we build new generation or transmission that's how we pay for our electricity right so we could do nothing and allow the traditional system to operate in which case you'd see your rates go up in five years, maybe3 years,40%. so the legislature had to decide do we want to stair step that incre you know that increase in there and maybe we were wrong I know a lot of people in this room think we're wrong but that I I if when you're put in that position as a legislator you're trying to think how do I serve the folks that I represent the best way possible to try and ease that that burden that's going to be put on them and data centers that's to me that's a little bit more of a different discussion right it's the same but it's a different part of it because we would be paying for new generation whether or not they were coming to Arkansas so do y'all have suggestions I mean I know that the generating Arkansas Jobs Act is what's on your bills now and so that's what you're looking at and I totally get that. I get it too. but y'all have is there would you rather see it at40% increase in five years because I don't think it would be better then but but I'm open to those kind of ideas because I just want to represent the folks that that live in my district to the best of my ability and and try to ease those burdens I'd like to say we already have
▶ Play
Speaker 388 2:51:49
the formula rate plan it's at51% my understanding which I'm not I'm not a brilliant person, but I can I have been told that it was voted in by the legislature in 2015 for about the same reason that we're here again so how many more times are we gonna have to do this that's a great question. I mean you know where does it stop everybody not just farmers everybody's at a breaking point with bills people are you know elderly people are choosing between paying a light bill, getting medicine, paying for the groceries. know it's it's everything and there's got to be you know, I mean I'm google, I meangy they're not, I know that it's an energy company and I know that they're treated different but they're not in the red. I am you know when does it become a point of somebody else taking the bill I understand well
▶ Play
I I appreciate you taking time to listen to me and if you have ideas know y'all stubs are hard
▶ Play
Speaker 388 2:53:02
and I wouldn't want it. we appreciate you being here
▶ Play
Speaker 380 2:53:06
thank you I would like to say like just to give an example because I feel like the common person doesn't really look at all this but say this is just one well of mine the energy charge was3,229 dollars74 cents by the time they get through with it from the formula rate plan to the tax adjustment to the generating Arkansas Jobs Act to the fuel andurchase power costs blah blah blah blah blah blah blah the total charges go all the way up to5500,5,564 dollars and then you add your taxes and then once it finally gets done it's6,000 dollars so it started at3200 by the time it was all over with it's6,000 dollars. I mean that's a lot that it's just getting very tiresome is all I can say it's like a death by 1000 pin pricks Sen Hill you're recognized
▶ Play
Chair Unverified 2:54:14
thank you Mr chairir. I appreciate each and every
▶ Play
one of you being here today so the these legislators can hear real life experiences what happens in the real world in y'all's world and so thank y'all for coming and sharing what you have. I want to make sure they also understand that y'all pay a demand rate y'all pay the highest rate available every month y'all understand that they pay the highest rate on the daily re available for the entire month. whereas what we're looking at in East Arkansas they're gonna pay a nondemand rate. so we're taking our largest industry in the state of Arkansas and sacrificing them for another one coming in I'm sorry I'm not a fairweed fan I'll stay with them throughout the whole deal. I'm proud of each and every one of you thank you for for farming because farming is just like America you gotta love them because without farming you don't have America I'm sorry thank you senator hickey you recognized thank you Mister chair.
▶ Play
I wasn't gonna comment again but due to
▶ Play
some other ones I am my I'm gonna ask a question of course to start this and I'm gonna have a comment so do any of you all feel like that this is going to help you in the future getting the getting these costs on your bills today because that's the that's what we're hearing
▶ Play
Speaker 388 2:55:41
about this see no. No. OK. well I
▶ Play
don't either and you know I'm gonna I'm gonna tell you all this. I voted no to begin with but then I did a 12 to fi5 ppage amendment I thought it was a horrible horrible bill whenever it first come out. and I'm gonna tell you after my amendment it's still a horrible bill and you know sometimes a man just has to say he made a mistake and whenever I sit down here and hear that you know that people and you're not the only one we're hearing from businesses too. I mean you know with hap what's happened to farmers that's close to our heart and we understand that but this is happening to other businesses across the state I've heard from some of them privately and their their bills are monstrous so you know nobody does anything down here by theirself but at least from my standpoint you know you know this lady at the end said, you know, you're not an average person but you said something along those lines but you know the thing is you expect people like me and others down here to look at this stuff and to make sure that things to this nature are written into the bill and they don't happen because what we missed is that these upfront payments that these people received we just missed the part that they might just put that in their pocket instead of putting that on the cost of construction so we've made some mistakes I made some mistakes and I'm gonna apologize to you all for it thank you Senator Cadwell you're
▶ Play
recognized thank you Mr chairir. I want to take a a point of personal privilege and and thank y'all for coming all four of you live in my district district 10 and I appreciate that. I think you've opened some eyes today when we take4 farmers from small community and multiply that times all farmers in eastern Arkansas that have irrigation wells in western Arkansas that have poultry houses. it's amazing how much bird has been put on the farmers and I just want to tell you how much I appreciate you all coming thank you thank you Mr chair. Senator Hill you're recognized. One question for
▶ Play
each one of you do any of y'all have any other electric companies that do not charge the generating Jobs Act I know I know one of you does you did you had so you have two companies or three possibly first electric first electric as well so basically what you're saying is the expenses you used just a while ago you could take those numbers and double them if they start something amm I saying that correctly so just stuck with energy so ok so you're you're you're stuck with that. So Mr. Kitler's case you'd take that and just basically double it so you're looking at $25,000 a month if it was the same I correct on that thank you sir seeing no further questions
▶ Play
thank you all for being here today we appreciate it thank you for having us Moving to item C5. electric cooperatives of Arkansas you can introduce yourself to the committee. Jenniferloydano, director of government affairs
▶ Play
Speaker 430 2:59:01
for Arkansas Electric cooperatives Inc. to your testimony
▶ Play
thank you u will try to be brief.
▶ Play
Speaker 430 2:59:08
I know it's late in the day. I want to just take a couple of minutes to briefly explain who who we are as the Electric cooperatives of Arkansas and then explain why we were asked here today and that's to explain to you what how the cooperatives are approaching data centers so the electric cooperatives of Arkansas are comprised of 17 local electric distribution cooperatives who are governed by a locally elected board who are also member owners of the cooperative. Those distribution cooperatives collectively own theation transmission cooperative Arkansas Electric Cooperative Corporation and a statewide services organization Arkansas Electric cooperatives Inc. underder our business model we operate at cost and plus our debt service obligations so that means our our rates cover enough to operate and maintain the business and have enough margin in place to cover our debt service obligations. if we collect rates and they exceed our expenses and those obligations then those that excess is returned to our members in the form of capital credits some of you might have received a check from the co op. I hope you have if you're in co op territory our decisions are guided by the interests of our members and we exist solely to serve our members and ensure reliable and affordable powers provided to them. Currently when it comes to data centers we do not have any within our service territories how we do see the opportunity for growth and have planned accordingly and that plan is guided by four fundamental principles that are laid out in the one pager that are provided in advance of this meeting but I'll I'll highlight them here quickly. so the one that everybody cares about the most who's paying for what in co op territory our member elected boards have decided to implement tariffs that have been approved by the Arkansas Public Service Commission and those tariffs cover require deposits contributions and aid of construction and surety bonds are irrevocable letters of credit to be in place so that the data center, if a data center sites within our territory that data center will be responsible for the all of those costs and our member s will be protected from any cost increases that could arise to if we were to have to build infrastructure to support the data center the second is in regards to reliability reliability is key to our mission and it is a non negotiable for us so we are carefully evaluating any project for a new large load or data center that might site within our territory to ensure that reliability and resource adequacy is not degraded for our existing members. Third is in relation to protections for our customers if a project does not come to fruition so I I think Representativeoldriooldridge asked this question earlier we are ensuring that there are financial assurances in place from the data center to uh, protect our existing members against any guess having to occur any cost should a data center project not materialize within our territory. Lastly is flexibility for the for cooperatives as I mentioned earlier there's 17 local distribution cooperatives y'all know better than I do that's the the each quadrant of the state is vastly different in terms of terrain and so each one of those electric cooperatives have different landscapes and very unique memberships it's important for cooperatives to have flexibility to implement policies and procedures that best serve and protect their members and so we appreciate this general assembly for continuing to allow co op s flexibility to best serve their members the last thing I want to talk about is something that's on everybody's mind today and that's the generating Arkansas Jobs Act writer we have elected not to use the writer and do not have plans to use the rider. our member elected boards have determined that they will pursue data centers or protect our customers against any cost increases associated with data centers via the tariffs that we have received approval from the Arkansas Public Service Commission. we appreciate each and every one of you and I'm I'm so proud to sit here today and be able to represent the electric cooperatives of Arkansas and and getting to serve our member owners who are also your constituents there's also one thing that I wanna mention and that's in regards to a question that was askedu about a deficit the electric cooperatives of Arkansas have planned accordingly and do not have a deficit the resource planning process that we adhere to at the publicervice commission has served us well and and we have planned accordingly to ensure that our members have the appropriate power when power plants go offline and for the for the future so thank you very much. I'm happy to answer any
▶ Play
Speaker 241 3:04:07
questions you have thank you Miss Loncao correct
▶ Play
me if I'm my memory is failing me when the the agreement was reached to close the the two power plants of which the co ops were partners some of the co ops were partners with entergy that they kind of divided them up and y'all got the plant the plant I still call white bluff not white bluff newark yes sir we replacing that with a a gas fired plant is my understanding is that correct sir that's correct and you're not using the sea whip to finance that at all sir but but you are constructing new generation sir I wanted to make sure we got that in the record OK thank you Senator Hill you're recognized thank you
▶ Play
for being here today appreciate your your comments that you had for us all you mentioned data centers probably 1012 times when you were speaking just then what are your plans on data centers I mean you mentioned them over and over so y'all must be discussing them quite a bit and as we discuss as you're talking about data centers also want to remind I'm a co op member how's that data center gonna be a member of a co ops are they gonna have one vote or is it going to be based off the dollar shares they have? How are y'all gonna tie their membership in to be the same as mine who's been a member of y'all since I was since I was born ir2 years ago. So from that point I just want to say you know for the long term what do what are y'all looking at and how are you going to incorporate that in there because I know you're allowed a certain percentage of sales outside of your membership and other cooperatives is that
▶ Play
Speaker 430 3:05:50
what you're looking at? so in in the co op world we say one member one vote so each member so a data center would have one vote same as any resident has one boat one household one vote and so that's that's the principle that's the principle we adhere to in the in the co op space we are doing everything we can to protect our membership from cost increases that may be associated with a large load or data center and we are doing that through PSc approved tariffs that are memberber elected board has implemented. iss your your electricity generation sufficient now
▶ Play
I know we are last year y'all were buying it from Texas. so we're talking about expanding and actually during my during the the coach spill last year they talked about a blackout in my area so are we are we sufficient on that yes sir at this time we have
▶ Play
Speaker 430 3:06:42
planned accordingly and we are we are our generation and transmission is sufficient and we so we are building a power plant in Naples, Texas to replace the one of the coal plants that are going offline our portion of the coal plant that's going offline and we're also building a power plant in Independence County next to the existingependence cot plant thank you thank you senator Senator Crowelle you're recognized
▶ Play
the last lady that testified she said she talked about the rates going up so much in her bills prior to the sea whip and there was a question asked well if we undo this and it goes up40%. you may not be able to answer us but it's a question I just it it made me think are the co ops going up rates is as quickly as the other companies have been going up in the last 10 years. I'm not sure if I can answer specifically to what what other
▶ Play
Speaker 430 3:07:45
companies have done in the last 10 years but I can't tell you that our memberber elected board determines when we increase rates and we work really hard to not increase rates. We only do it when we absolutely have to to cover our cost and maintain an appropriate margin to receive low interest rate financing. so I think it would be fair just
▶ Play
to say that the customer gets a fair price on their energy from you sir thank you Senator Simon you're recognized
▶ Play
thank you Mrir. The argument for the generating Jobs Act is that it saves the ratepayer in the long run so by the by the co ops choosing not to implement that do you believe in your opinion and I don't know if you can answer it or not in your opinion do you think you're actually going to be costing the ratepayers more in the long run or do you think they're actually getting a better benefit now our memberber elected board has
▶ Play
Speaker 430 3:08:48
decided to address large loads in data centers that might come with our cooperative territory and in a way that we think best serves our members. I can't say uh, whether doing it another way would be to the de doing it a different way would be to the detriment of our ratepayers what we try to do is evaluate all of our options and and serve our customers the best way we can.
▶ Play
thank you Thank you senator no further questions Mr O'Connell thank you for coming appreciate your testimony thank you very much and now we will hear from entergy Mr John bethel, director of public affairs and Mr David Palmer vice president of regulatory affairs and maybe we have someone different we all have
▶ Play
Speaker 390 3:09:40
and we have another witness Mr bethel I'll recognize you
▶ Play
first and let you recognize your your cohorts there
▶ Play
Chair Unverified 3:09:55
yes sir good afternoon mis chairman members of the committee, thank you for the opportunity to be here with me and I have David Palmer vice president of regulatory affairs andentrell Thompson vice president of customer service with InterG Arkansas and I'm John bethel, director of public affairs with InterG Arkansas you're recognized Mr. Beth thank you Mr Chairman. I just will will real briefly we provided a a presentation to the committee that shows that using the generating Arkansas Jobs Act the writer to recover financing costs during construction results in a lower long term cost for our customers it provides a gradual rate change over the construction period and it provides a lower cost over the life of the asset that ultimately will save customers money in the long run we recognize that rates are going up as we're building that happens and unfortunately that's part of of building the infrastructure necessary to serve our customers we're sensitive to our customers needs and we are taking steps in our current rape case application to put in some programs to help alleviate that for our customers and are looking at other opportunities and we have other programs and Mr.hompson can talk about those at length Additionally we also demonstrate in the presentation that the treatment of the prepayment by Google under the terms of their contract ver as versus treating it as a contribution in aid of construction actually provides benefits to customers that are greater than doing it the other way and the the reason why that is and the reason why our number is different than the public service commission's number is that the publicervice commission didn't reflect the the terms of the Google contract which requires them to pay for the full cost of the project whether it's the full cost of the project in total or whether it's the full cost of the project net of the contribution their their rate would go down if you treat the the contribution as a contribution in aid of construction versus the way it's treated under the contract under the contract all other customers will see that number amortized over the life of the contract and see the benefit if you treat it the other way Google sees the benefit and that's that's what the last page of that analysis shows and with that unless Mr palmer and Mr Thompson have more to say we're we're available to take questions from you thank you senator hickey you're recognized thank you sir Mr bethel, obviously you know how I
▶ Play
feel at this point and you know I have to say one thing I understand that you all have a requirement to your shareholders so I do I do understand that impetus however just sitting down there and listening to this testimony and again if we need to get 10re0 more of them we could because they've been calling me for whatever reason with these with these bills and with that one line item but you sit down there and you hear people in this case farmers whenever they start saying that they've got a wine item which is a generating jobs on their bill and if you analyze it or do the one out the one lady I believe it comes to $8,333 more per month I think the other lady was about5,000 and the other gentleman was 12,760 per month we can sit down here and say this stuff you know about well this is gonna be beneficial to our customers in the long term and this or that well it's not gonna be beneficial to these people that they can't afford these bills they're gonna go bankrupt and you know I think I think that you have to acknowledge that that that that we we just cannot allow this to happen we've got a flaw in the system we got a fall in the bill we got many flaws in the bill it's just and again there's other ones that have been calling me I had one the other day I think they're and they they didn't give me the right to tell who they were I think theirs was working out to 87,000 or something like that a year you know with their company so I mean these these things just can this this can't be allowed to happen and again do you recognize that if I can respond senator and yes we are very we're very
▶ Play
Chair Unverified 3:14:32
sensitive to the cost pressures that are on customers today I cannot disagree with that at all. I I do want to just walk through because I heard her testimony and there's been a lot of discussion or there was some discussion about even our formula rate plan what we've tried to do and you go back to the legislation in 2015 is provider is provide a stable predictable set of rates for our customers we're not filing a rape case every two years. we're not coming in with 20 and30% increases we have we've been able to manage through the formula rate mechanism some modest increases to base rates since 2015. the3,200 dollars that she quoted is what was put in rates 12 years ago in 2015 or 11 years ago the formula rate plan adjustment has recognized that costs have changed on us as well over the last 10 to11 years and so it's picking up those changes but it's doing it subject to a4% cap so it's an incremental to the extent it's necessary adjustment that's capped out but it allows us to address cost challenges on our side but also provide benefits we've been able to bring you know, new solar resources we've been able to invest in new technology on the distribution grid we've done a lot of good things with that that have also allowed us to lower other costs so your net increase today, your rates have gone up but they've gone up less than the rate of inflation so you're understanding that it's still an increase but you're buying more electricity for your dollar today than you were 10 years ago. What I see is the challenge what's in the generating Arkansas Jobs Actyder are real resources we provided plans to the commission for you know how we would respond to you know the retiring coal plants or projected load growth we've seen the steel industry boom we've seen other industry come to Arkansas based on all of the benefits the state provides we needed to build new generation and the commission has found that those resources are necessary and needed and yes that is additional cost pressure, but the Gaja roder is allowing us to bring that in on that same staggered trajectory so it's not all at once so there are there I heard the discussion around the policy of but costs are real hard to deal with today so that makes it hard but they're going to be really hard in five years if they jump up by that incremental 20% plus the cost of the full resource so there are some tradeoffs but that's how we're trying to manage it I
▶ Play
understand you have to defend it but you know that's why I went back and got clarification a lady on the end with their 8300 a month you know we're talking about the one line item and it's my understanding that was it5 dollars77 cents per 1000 right now with the next fiscal year you're going to add another4 or5 dollars it appears like is that correct? with what you have in the in
▶ Play
Chair Unverified 3:17:41
the pipeline for residential customers that's how we provide the rate comparison it's on a cents per kilowatt hour basis so just to so if I can put that in perspective for you so we're building two gas plants right now the Jefferson Poweration Miss Walder referenced and the irronwood power station next to the Lake Catherine plant. so yes we're collecting that5% increase today but we're spending we're not holding that money. Jeffersonower Station's gonna cost bill.5 dollars. Ironwood's gonna cost500 dollars dollars to700 billion dollars so next year and I don't have the numbers in front of me all of those contractors all those thousands of workers that are on site have to be paid for building those resources soaja is helping us fund what we have to pay to have those constructed. Oh I'm well aware of how it works now
▶ Play
I really understand it now but the maybe more so than I did back there. where we need some you know to limit some of this stuff for sure but let me just ask you this if we if we did nothing based upon what I think you all are reporting and I wish I'd have got it exact if we're at577 now and it's going to go up to close to $10 is that same person that has $12,000 a month on his irrigation wells and and I'm not saying that's 12 months on his because it is for irrigation wells and we think we understand that that's for the growing season is that if we did nothing this time next year it comes back in is his bill gonna be 24,000 for that month? thereabouts it'll be an increase. I don't know if it'll double. but
▶ Play
Chair Unverified 3:19:26
again you're smart man you can sit there and tell me
▶ Play
what it'll be based on on what you have out there now well I can tell you it'll
▶ Play
Chair Unverified 3:19:35
go up every year but it's going to go in when that when that resource or those resources are online that rate's going to be 20 to25% less than it would have been but you you still have to build a generation
▶ Play
and get it in the race. no more questions
▶ Play
Representativeaker you're recognized for question Thank you Mr Chair. thank you all for being here. I wanted to ask similarly to my question earlier to the PSC about the cyprus solar project my first question is what is the expected length of time before that's gonna go online or when will construction complete? we're expecting it to
▶ Play
Chair Unverified 3:20:18
be online at the end of 228. so that's roughly
▶ Play
2.5 years of construction time from when the rider was applied to the ratepayer to pay for their portion of that roughly yes OK so my question again with ratepayers having then put in around $1.1 billion over a 2.5 year period how long of cypress solar being online until those ratepayers receive a return of more than $1.1 billion. Well I want to
▶ Play
Chair Unverified 3:20:51
make a correction because we're not gonna to collect $1.1 billion from customers over the 2.5 years I I don't know that that when that discussion was happening I wasn't really following but we're not gonna to collect that much money we're we're collecting the seawELp or interest on seawE during that 2.5 year window. so it's a $1.6 billion asset. I think that's you know,200 million dollars ballpark. but if I guess
▶ Play
so the 1.1 million that is being paid for by the ratepayer over what time period will they have paid 1.1 billion of this 1.6. well the
▶ Play
Chair Unverified 3:21:32
the 1.6 will go into rates for all customers what's unique about cypress solar is Google comes online and their rates are set to more than cover 1.6 billion in cost so there's an offset that shows
▶ Play
up follow up I like that I like to add to that if I don't mind. first of all thank you for allowing us to be here today Ventral Thompson vice president of customer service and so like David said we are we're concerned about the impact of utility bills on customers but one of the things that I wanted to clear up is that what we heard earlier is that ratepayers are not paying the difference of cypress solar google is paying the cost of cyprus solar that that cost is built inside the rates that are going to be charged to google not to the ratepayers that's a that's a that's a starting point that I think it's it's clear that we we're clear that that's helpful and I I guess I
▶ Play
just want to ask what percentage of the writer that's on the line item called generating jobs Act ongy bills right now what percent is being sent to construct cypress solar.
▶ Play
Chair Unverified 3:22:52
right now the the577 it's about 1 dollar77s something like that something like that and
▶ Play
by the time yer solar is built and functioning and providing its benefit back to the entire grid how much money will have ratepayers have paid to have cyprus solar built. I'm only trying to remember the
▶ Play
Chair Unverified 3:23:16
exact math for you but we're collecting interest on seawep so it's not the $1.6 billion it's how much Capexxx do we have going out the door over the next 2.5 years prior to it coming online. So again I I believe if we go back and look at the projected rate for Gaza you see that it's in the ballpark of a couple $100 million not 1.6 billion or even 1.1 billion guess I'm just asking I'm a little
▶ Play
confused on how you came up with the dollar figure that people are paying today if we don't know what that's gonna look like in 2.5 years for the total amount paid for by ratepayers for cypher solar to exist. how much money will ratepayers have paid for cypher solar to go online.
▶ Play
Chair Unverified 3:24:02
OK during the construction period again and maybe we've got the math here oh that's for all that's for all resources though yeah about twenty0 maybe 20% of we'd have can we follow up with the math if I think I know your question but we can give you
▶ Play
that number that want to know how many years once cyer solar is on that ratepayers see a benefit that's in excess of
▶ Play
Chair Unverified 3:24:31
what they paid in right that's a good question so just as a reminder, Google will also be a customer at this point in time and Google's rates will more than offset the cost our modeling of the resource in the market we operate within myo is that the cost savings it generates someone mentioned that solar has you know no marginal fuel costs because as long as the sun's shining it's just producing so our estimate of the benefits of cyrus solar is the ballpark of $245 million on the low end for for the life of the resource correct so you see significant fuel cost savings that show up through your fuel rider, that other line item on the bill because of it and you're getting it basically covered by Google in terms of total cost and final
▶ Play
commentst. I think we we do understand and we appreciate the the negotiated work to have Goo o g le shoulder this once it goes into operation. My concern again is that ratepayers will have paid some unknown amount of money at this point for that to be built and I would like to be able to tell my constituents it took 2.5 years of $100 million and you will see $1001 by 20302028,2032 that seems to be not a difficult ask. No we can we can follow up and get you the precise math on what the
▶ Play
Chair Unverified 3:26:00
benefits are and the expected cost through the Gauza rudder. we can follow up with that
▶ Play
Senator Krowell you recognize yes, I got a couple of questions so you know you're talking about sensitivity to the ratepayer and as I see it we had the conversation came up earlier earlier and my understanding it correctly that energy is actually earning a higher rate of return under this gaza than they were before
▶ Play
Chair Unverified 3:26:34
no sir under the writer we recover the exact amount that would be booked as allowance for funds used during construction and carried forward and capitalized and recovered over the life of the resource that calculation is the same it's different than the calculation that's used for our base rates and the the return is different but it's exactly the same return calculation that would be used if you treated these dollars the historic way and accumulated the interest over the life of the construction and added it to the plant and then recovered it over the life of the asset that the calculation is exactly the same so no sir we're not getting a higher return on that we're getting the the calculation is exactly the same under the the rider under the generating Arkansas Jobs Act versus the traditional way of accumulating those funds and capitalizing them and recovering all over the life of the asset. so I I get what
▶ Play
Speaker 479 3:27:28
you're saying but and I understand that but in
▶ Play
actual dower dollars how much more are the customers paying because of this higher rate? because it is a
▶ Play
Chair Unverified 3:27:43
higher rate they're not paying more they're paying the cost of of financing and Mr palmer may be able to base the exact the calculation is exactly the same under the yr versus under the historic treat I think
▶ Play
one of the things that was mentioned earlier was that this is more about timing than it is anything else so customers are going to save over the long run but they're gonna pay the construction the financing costs associated with the construction on the front end that's going to lead to a longer term savings for customers that's a benefit to customers over the over the long term OK so and I want to follow up
▶ Play
with one other thing you said fuel costs. Google's gonna take more than pay for the fuel costs on that line item so I'm assuming that lying adam's gonna go down once this is operation for fuel cost. well just to be clear what I
▶ Play
Chair Unverified 3:28:40
said is Google's covering the cost of the resource we'll put the resource just like we do Arkansas nuclear One. it operates in the mysogy market Cyprus solar will also go into the energy market and every megawatt hour it produces we will get paid for its production because it's gonna go in basically at no cost so that energy will clear the market and reduce produce a payment back to EAL that'll offset all of our other fuel costs whatever they are. can't say that fuel costs are going to go down because gas prices could go up again but we will certainly have positive benefits from that resource because it's going to provide those energy savings in the market against whatever all
▶ Play
Speaker 484 3:29:25
of our other fuel costs are. and the last thing is
▶ Play
like senator soon to be Senator Akerss I really want this penciled out because there's for this law being written and you being instrumental in writing it, you really don't have a lot of questions a lot of answers for the numbers any any response well
▶ Play
Chair Unverified 3:29:55
I wouldu I would just ask I mean we're happy to pencil all of this out if we if there's a specific number we're looking for I I mean I think Mr. Bethel addressed the return issue but if it's still not adding up with what's going in the rotter we're happy to provide additional detail Senator Hill you're recognized for a question thank you over
▶ Play
here I would like to follow up on whats Senator Crowee said to send out there's no doubt in my mind y'all have done your due diligence you've got those numbers pretty readily available if not y'all didn't do your due diligence before this project all started and that's just a corporate world mentality there'm and I'm in the corporate world so I know you've done that going on to my question though skipping that they mentioned a pro formula plan a while ago the pro formula plan on your right on your rights you said they were capped at4%. Am I correct on that?
▶ Play
Chair Unverified 3:30:54
that's right the formula rate plan has a4% cap on the rate change and
▶ Play
so they went up4% last year or we can say this year it doesn't matter which one and now we've added5 morecent to them so those the people that sat right there where y'all were sitting right now have actually had a 9% almost 10% increase the formula rate
▶ Play
Chair Unverified 3:31:14
that went into effect in January of this year
▶ Play
was4%. that's right and so if they said if it's5% for them correct yes or no sounds about right yes ok now to your customer service man there I'd like to got a question for you would you tell me how you're going to tell those people goodbye when they
▶ Play
Speaker 489 3:31:37
go out of business. And you heard them say they were headed out underst
▶ Play
I understand that there are cost pressures that are on customers from all sides whether it's food whether it's medical, whether it's transportation their cost costs are increasing but for the same reason that other businesses costs are increasing industry's costs are increasing as well our job as a utility is to provide safe reliable and affordable power and we have to consider all customers and all issues and one of the things that when we presented the generating Arkansas Jobs Act it was another savings opportunity for customers when we're in a position where we're gonna be building out generation if you're in a position where you're gonna be building out generation and costs are increasing you want to make sure that you're finding all of the ways possible to save customers money. and if I were to and and you mentioned earlier the numbers we prepared the numbers in the in the preread material and if I could point your attention to one of those one of those pages that I forget which slide which slide it is maybe slide four that talks about the advantages of the gaza rider and the timing associated with how costs are going to be recovered over over the life of the asset and in this example you're talking about $2.2 billion of savings over the life of that unit and from the company's standpoint that is an opportunity to save customers money and we brought that before the general assembly and we brought it before the Arkansas Public Service Commission as an opportunity to help customers save money by paying a little bit of the financing costs on the front end but ultimately receiving a net benefit of a roughly 20% over an asset that we're probably gonna build anyway and so from our standpoint that is a prudent way of looking at making sure that we're providing safe reliable power for our customers not just today you still haven't answered my question how are you going
▶ Play
to tell those people goodbye because they don't they're not worried about 10 years from now they're there worried about five years from now they're worried about 2,3,4 years trying to get to the point yes sir I
▶ Play
Speaker 491 3:34:02
understand and and I will I will point you to the next page my
▶ Play
question sorry you could not answer it. thank
▶ Play
you very much senatorcaldwell you're recognized thank
▶ Play
you Mr Chairman. would y all agree that Act373 when Cwhip is in force that it allows you to raise your rate of return from6% to8%. no sir John you and I had that discussion56 months ago in Jonesboro and I followed up on that with the public service commission and they said that it does and just a few minutes ago I went out in the lobby with the Chairman Webb and and Danny Hofer and they said very specifically it allows you to raise your rate return from6% to8% that's a33% increase. so this we're not gonna to solve this here now because I believe them you know and there's something in in that bill that that makes them say that that you've said here and and deia but no you wait I I've forgot the chair I've got the microphone. and and and so you know we've we we've discovered this during the debate of the bill it was written in there and we ask and at the time they said yes and and just within the hour the public service commission says that y'all are are on on during sea whip on on your charges on part of it on your return that you go from6% to8% and and for those who can't do the math that's a33% increase I'll let you respond sir and the the rate is
▶ Play
Chair Unverified 3:35:48
different in the calculation of the the interest or the financing costs for interest during construction and it's the difference and it's it's the same treatment that's allowed under traditional rakema and the rate is higher because it doesn't include the the certain portions of the items that are included in the rate of return for ratemaking purposes overall it it is prescribed by the federal Energy regulatory Commission's calculation method that is prescribed by the Arkansas Public Service Commission and the way that's prescribed as you use the cost of debt and the cost of equity only in the calculation of that amount and that's what would be calculated and accrued and put into rates under the traditional method and then under the writer that's the amount that's calculated and accrued for the financing cost during construction. It is a higher rate but it's the exact same rate under method A and month B and so if I when I said no it does not cause our rate of return on our investments to go up it does have a higher rate of return for the purpose of the financing cost but it's the exact same number it's not higher than it would otherwise be if you're under the traditional method it's the same method and I apologize if I if I misspoke or or answered your question incorrect or we we miscommunicated but it's it is a different number for a different purpose well
▶ Play
in in the process of delivering safe and reliable electricity y'all have forgotten the affordability part of it when you have5 people sit down there and talk about their monthly bills going up between5,000 dollars and $12,000 a month you have lost sight of the local people of heres here here's what really bothers me we've got an industry the largest industry in Arkansas employs hundreds of thousands of people have probably one of your biggest suppliers of cash money every month in in farming in agriculture and and we're we're putting them on the chopping block for a business that you know you will not disclose how much they're paying and who will have a miniscule amount of employees for what we're doing and we're paying for thank you Mr chairir
▶ Play
Senator Penzo you're recognized thank you Mr chairir was I accurate in the600 megawatt with350 bar battery backup for the cypress solar plant that's right
▶ Play
Speaker 496 3:38:18
ok and do we know
▶ Play
what the at full capacity when the google data center's online, do we know what that expected the power demand is we know but the customer has not disclosed it well it's it's my understanding is gonna be starting at450 and up to600 megawatts there there's a term called average continuous power equivalent that you have to look at when you're looking at solar power facilities that's600 megawatt plant with you factor in the350 megawatt battery backup the location and that part of Arkansas you're looking at 100 to 113 megawatts of average continuous power equivalent so that's actually the generating actual generating capacity of that facility cause some days it's not producing some days it is so so if the data center's drawing600 megawatts and the average annual equivalent is around 100. that's a500 megawatt deficiency and somebody can correct me if they think my math's wrong but I think it's pretty accurate so that that leads me to the the question if google's paying the full cost and one of you said that it's it's built into the right are are you saying that google is going to be paying more a higher rate than the farmers that were sitting at that table is that what you're telling me because it's if it's baked into the rate you're stating that they're going to be paying more iss that accurate
▶ Play
Chair Unverified 3:40:04
Yes that's accurate we can you can I could point you to our testimony in the contract where we described how we developed the pricing for their contracts not the price itself but they're like all other customers you're contributing to existing embedded costs that's what our farmers are paying google's also paying the incremental cost of cyprus solar so there's no way that's less than what
▶ Play
farmers are paying so so then why are the ratepayers subsidizing the construction cost if if Google's rate is baked in why are we subsidizing as ratepayers a wirearkansans paying for the data center in the the the gotcha bill well again the we needed to begin the construction
▶ Play
Chair Unverified 3:40:47
before Google is here as a customer so there was a bit of a timing issue there but Google comes online next year and they start paying those rates so I don't disagree it's in rates today because we needed to meet the construction timeline to qualify for the tax credits all of that good stuff, get the capacity there but Google will be online and paying those rates next year and their rates are designed to more than cover the cost. OK so
▶ Play
so just just to clarify we've we've got a coal plant and a coal plant that we re replace them with a gas plant that are going to produce less we've got a data center coming in that's going to use500 more megawatts than the average equivalent and so that's a bigger deficiency than I realized when I first asked this question I had to do some quick math here and and y'all can tell me if I'm wrong about that average but I mean that might be top secret stuff you can't disclose as well but that's my understanding so so here we are putting this burden on the ratepayer and we're we're actually losing generation power by bringing in a data center and building a solar plant just for that data center. I mean unless they're only gonna operate when the sun's shining and you know, I mean is that the agreement y'all
▶ Play
Chair Unverified 3:42:11
have with them? no but I but I would point back to when we do our resource planning, yes we're trying to ensure we meet our load plus reserves we have to demonstrate resource adequacy to myso every year but one of the benefits of us joining myo in 2013 was that it's a market-based RTO so we can add load and we can add generation but you're relying on the entire bulk electric system so when we do our production cost modeling which is how we we do all of our resource planning and that's to say here's our cost for generation here's how much load we have this is standard industry practice these are the same models that myso uses to look at our resource adequacy to figure out what transmission expansion might be needed we see that we can add the google loadad with Cyrus solar and produce net cost reduction so yes I agree with you senator that the solar facility is not gonna to operate all the time and Google's load likely will operate way more often but when we do our production cost modeling to check and make sure we're not overbuilding generation we see that our system is fine with the addition of Google and the addition of Cyprus solar with the
▶ Play
batteries. will Google have to pay taxes on their rates like the farmers do I'm not aware of
▶ Play
Chair Unverified 3:43:33
any customer that avoids state and local sales taxes unless there's specific legislation for them I wouldn't know the answer to
▶ Play
that. OK. OK. What what rate above the average customer would you say they're paying can you tell me that? I can't tell you
▶ Play
Chair Unverified 3:43:49
Google's rate no, but I can tell you we started with our embedded rates and then we added incremental costs for cypress solar on top. and and again I know Miss Hofer walked through the math but that was the reason why we had to subject that contract to a ratepa ratepayer impact measure under their rules they looked at total cost to serve and total revenues and it's net beneficial they're paying more revenue towards cost than those costs are if that makes sense said that kind of weird yeah well I just
▶ Play
I I just I'll I'll leave it this Mr Chair, I I just want to state that we're bringing on a client that's going to be using way more capacity than than this solar facility is going to cover so we're going to be at a huge deficit due to the fact we brought them on as a customer and and I don't think that was a great decision as far as the ratepayers go. thank you thank you senator hickey you recognized thank you and I'll try to be quick on this one
▶ Play
Chair Unverified 3:44:59
but you know I just couldn't leave it alone.
▶ Play
We said that you know, I heard somebody sit down there and say we're doing this for the benefit of the customer and I know what you're gonna say well it's a cumulative total of the ones we have now and the ones coming on but let's just back up to the gentleman with his $12,760 a month bill on his irrigation wells and let's just say he runs those for three months comes to382's round up to 40 so he's gonna have an extra40,000 dollars. how do you all s go back to him and say this is a benefit for you because the way I'm sitting here looking at it I just looked it up if he wanted to take his40,000 dollars cash if he wasn't putting that on and go put it in a treasury you know he could get5.53 and if you want to go put it ingy stock he could get him a dividend yield today of 2.44 and I went and looked at the 20 year average return with reinvested dividends and that works out to 9.43%. so are you are you gonna be able to tell that gentleman that this is truly a benefit for him because I heard that's what that's what we said this is a benefit for our customers and he's your customer. senator don't I don't want to deny your math and your circumstances that you mentioned but one of the things that makes us confident that we are making the right decision for customers if you look at the slide ive on the document that we sent over on the pre preread material it it shows that from in year one ofaza the cost per 1000 kilowatt hours is it's574. in year one under the traditional method for the same resources that are being that are that are within theaza rider it would be $2525.13 per 1000 kilowatt hours. when you compare the574 to the2513 on year one we believe that that is absolute absolute benefit to customers because it provides a a gradual step in rate as opposed to a large increase all at once and that's the benefit that's part of the benefit of gradually increasing rates for customers as opposed to as opposed to it hitting them all at once her to go ahead and pull up the slide that you were referring
▶ Play
to. I know we have that but just so everybody can has the benefit of of being able to refer to that thank you so much
▶ Play
Speaker 504 3:47:50
and if I could just add we
▶ Play
Chair Unverified 3:47:55
would certainly have that conversationgain, very respectful to our farmers and the cost pressures they're under. but I think they also want us to keep the lights on and what's behind these charges are real generation projects that were determined to be needed through valid resource planning through presentations to the publicervice commission so we we need more power and and we need efficient power and we've proposed it but we still have to invest in generation to keep the lights on so it's necessarily a conversation about what's the best way to get there and to entrell's point, I think you know the gradualism approach has been has been beneficial in other areas it doesn't alleviate that there are significant cost pressures on farmers today we understand that so if this body was
▶ Play
to decide they just want to repeal this straight repeal what are you are you all going to continue with all these projects and go back to the old way I don't know that we have
▶ Play
Chair Unverified 3:48:57
the choice to stop the projects when there was some discussion earlier about the risk of abandonment if we have projects going into the gaza roder when when we present generation projects to the publicervice commission some of that oversight that I believe the gentleman from Oklahoma was describing is very well what's on the table the Jeffersonoweration just as a real example the commission deemed it to be required for public in the public interest pursuant to public necessity we have to build that to have adequate generation we don't have the choice to stop and did not provide it we've demonstrated to the commission that it's a good resource and we have a need for it so the risk of abandonment in this structure is just it's not an issue. Now relative to the financial consequences I think we'd have to evaluate what that means but again to Mr Thompson's point absent the auzer roder we construct Jeffersonower Station it's going to go into rates all at once in 25% higher than it is right now and that farmer in that year is going to be really
▶ Play
ticked off thank you Representativewooldridge you're recognized. Thank you Mr chairir and thank you for being here. So I have two questions one we talked about shortages earlier in the power supply so I know Miss Warop testified said that there were shortages based on your information you just said to Senator Hickey that you guys want to keep the lights on so I'm assuming you insinuated that you had to do this because you agree with her there are shortages in the future yeah I'm
▶ Play
Chair Unverified 3:50:40
not I don't know exactly what she was referring to in our resource plan we're looking near term but we're also looking long term. so we take a 20 year horizon. So if we're seeing that there's a deficit we're we are doing long term planning year to year that's some of the benefits again that that we received from joining myo because they do have a broad market so in any given year myso may accredit solar capacity at a very reduced number. they may reduce our accreditation even for some gas plants but they have a market mechanism in place to help ensure resource adequacy so we may year to year see that fluctuate. We always have but we have a long term planning margin that we try to maintain and and we're looking out 20 years to see. So I I can't speak to her math for the near term but over the long term I think we do see the need for additional generation but we're working through that process. what we've currently identified is based on prior
▶ Play
plans so is there a current shortage without having to purchase in additional power through that
▶ Play
Chair Unverified 3:51:45
our our day to day operations we're constantly buying and selling power so it's not a shortage per se it's some hours were long and some hours were short but that's again one of the benefits of being in a marketbased RTO secondcond question Mr.
▶ Play
Chair and my last one so part part of that is what you just talked about and part of it goes back to what Senator Caldwell had brought back and that to me is the affordability so with the average or median income in Arkansas of a family being around77,06500 a month roughly what is the ceiling on what's considered to be affordable electricity and where are we currently with that and what is the plan to continue to make that affordable because it does appear that that has been an afterthought
▶ Play
Chair Unverified 3:52:30
well it I was gonna say we actually have spent a lot of time on this very question because we look at affordability a lot more broad than just what is your rate and let me if I can put that in context you know our rates are below the national average. we're competitive. I can't attest to Mr.ri's testimony about Texas but we do have competitive rates but if you're a low income customer you're energy burden meaning your dollar that buys electricity doesn't go as far as it does for a middle income family. so you know we've proposed programs to help on the you know specifically in that conversation for low income or most vulnerable customers but we try to we try to look more holistic at it than just what is the rate because we also do have to balance keeping the lights on so I appreciate that but
▶ Play
you guys have spent I'm sure a lot of time thinking about that so thinking through knowing what the average income of a family is in Arkansas what is based on all of the projections and times that y'all have spent on this what would be an affordable rate iss it $1000 a month? Is it 800 a month iss it400
▶ Play
a month? Well because affordability impacts everyone differently. what's affordable for one customer may not be the same as affordability for another customer so our goal is to keep rates as low as possible. that's our overall goal and we're looking for opportunities to streamline our operations to save to save money we're looking for efficient efficient operations we're also looking for ways similar to policy changes that would allow savings for customers and so I can't offer a dollar amount because affordability is different for our customers but one of the things I can say is that we're interested in and focused on keeping rates as low as possible for all of our customers and and no
▶ Play
I appreciate that but I still think there's got to be some forethought into what that looks like because again we know what that average income is for an Arkansas family and I mean I guess I could go without eating and pay6,400 dollars a month for electric but that's not affordable, right? so what has been that thought process of what percentage of that income for an average family not talking about low income folks I recognize their assistance programs for those those folks to get help to pay utility bill but for the average Arkansan if affordability is at the forefront of your planning what is an affordable rate and I don't know that I have a
▶ Play
Chair Unverified 3:55:07
direct answer to the question you just asked but there have been some safeguards built into the legislation and the the writer the the public service commission can't approve a rider change that would make us have rates in Arkansas that were more than 10% below the national average we're currently about 22% below the national average I don't have that number to say that's what that that number is currently we can we can certainly look at what it is today and say what that what that number would look like but that's a it's a it's an annual it it moves each year as they calculate it but our rates are still nationally competitive in the and the law requires us to to remain nationally competitive. welld I definitely would appreciate that and
▶ Play
I guess I would say too I'm I'm not a member of this committee but if you could share that with the committee and the chair saw fit to send that to to those who are in attendance today. I do think that it's a warranted question I also would express somewhat a little bit of frustration that we've been here for four hours and those to me I would think if I were in the energy industry would be numbers that I would at least have a general understanding of or know offhand what a national raid is and what our percentage rate below is but if you can get that to us I would
▶ Play
appreciate it thank you Senator Krowlle you recognized thank you chairman this is going to be more of a statement. we've talked about the 8% to6% a couple of people have brought it up and I'm just going to make this statement you won't say higher rate. you will only say different that the rate's different and this is like I'm gonna quilt this to me my tax rate is 23% and we wrote a bill that my tax rate now is 16% because you can do the AdITs you can do the the deductions you can do stuff. so now your tax rate is 16%. that's what I'm most frustrated about is that ratepayers are getting nailed and you guys are going to make more money and that's not a question that's a statement Senator Mcee, you're recognized.
▶ Play
Chair Unverified 3:57:11
thank you Mr Chairman thank you guys for being here does
▶ Play
the public service commission approve every application that EAO files with the commission. no they do not. They review all
▶ Play
Chair Unverified 3:57:23
of them but they don't approve all of them don't they approve all of them sometimes they don't agree with what we're
▶ Play
asking for so that if they disagree they don't approve approve the application ok so y'all have talked about or it's been discussed a little bit about obviously the writer so how how long do you think the rider will be on the bills for cybersolar. do you have any kind of estimate there I know that I believe if I remember correctly y'all have the discretion at it at some point to take whatever you have not amortized yet and put that into ask for a general rape case and asked to put that in rates is that it accurate that's right we would whatever we're amortizing for
▶ Play
Chair Unverified 3:58:12
we'd put into rates through either the probably through the FRP where all of Google's other revenues would go and and y'all
▶ Play
have filed an application to do a general wr case we have OK and you've got the formula rate plan so I know that I'm I'm basically people don't want to see them go up anymore so can you talk a little bit about your expectations for the general rape case and what you've requested there and how that would in working with the formula rate plan what is that what does that look like a race is gonna continue to skyrocket
▶ Play
Chair Unverified 3:58:45
no and I wanna make sure I get your question right so you want to just a discussion of the general rape case that we have pending
▶ Play
right now yeah if you if you've got a general rate case what are what are you requesting there and in combination with the formula rate plan what what are those numbers look like as far as rates moving forward right so
▶ Play
Chair Unverified 3:59:03
so we were we're required to file this rape case at the conclusion of the first formula rate plan which ran for 10 years so we actually filed that application back in February or april I've forgotten now February so we're actually nearing completion of that process at the commission when we filed our application because we had because we had used the formula rate plan for the last 10 years to set rates. We didn't have the need for a large rate increase becau like you would normally see from a rape case so what we fied was the total revenue requirement was around44 million dollars so just to put that in perspective a4% rate change in the FRPs been around75 to80 million dollars. so about half and that's because you know we've got we had this overlapping period of time where you're setting your rates based off the same cost basis that you're formula rate plan is using. So really that increase was largely just to sync up timing differences between the two mechanisms but it was not a traditional rape case by any stretch does that answer your question? so do you
▶ Play
have an expectation of what pers what percentage increase have you requested I
▶ Play
Chair Unverified 4:00:22
believe it overall it was less than 2% and then for residential the initial filing was basically flat rates that was might have been a there is a small increase because of the low income tariff that we proposed the law requires if if we do that that the the cost stays within the residential class of some residential customers might see slightly less than a 1% increase in low income customers would see it you know pretty decent decrease in their customer charge but overall the rate request was I believe just under 2% in total. and I'd also like
▶ Play
to add that while this wasn't a traditional rape case where you're seeing larger increases we also took the opportunity to provide some other offerings for customers in this rape case because we haven't had a rape case in over 10 years we made it an opportunity to go through our rate schedule tariffs and determine based on customer feedback and and things that our customers have mentioned to us what things can we improve around our tariffs and offerings to help them either streamline their operations or save money on their on their on their bills and specifically for our residential customers we are proposing a time of use rate that will allow customers to shift when they use energy to save money we also have proposed a low income tariff that gives ourAIap eligible customers a discount on the customer charge of the bill and then for our farming community we've also proposed tariffs based on farmer feedback that would be more
▶ Play
beneficial for their operations is that with respect to the demand charge versus the energy charge or how how how are those
▶ Play
tariffs structured essentially essentially those tariffs are structured such that we are aligning the tariff and when farmers pay to align with their operations so instead of them having to also turn their wells on at the beginning of the season, turn their wells off at the beginning of the season which also is a operational it's an operational task for them each year to make sure that they're timing them on and timing them off at the same time or at the appropriate time and so
▶ Play
the tariff addresses that as well does that affect most farmers in the ss in the state or is it farmers of a certain size or it's all the customers that are on a particular rate right
▶ Play
now we have multiple rates we have an APpa rate and an APb rate and both of those rates are applicable to one is
▶ Play
Chair Unverified 4:03:01
seasonal and one is a clarify intro you're talking specifically about agri pumping so you may have grain bins and things on a different rate but arap pumping customers yes ok ok thank you. And I thought I heard senator you ask your first question was how long will cypress solar be in the gaza rider? thank you for reminding me while we've been sitting here, we actually just before we actually have filed an application with the commission with some amendments to our contract with Google in West Memphis and one of the proposals we're making is to remove it from the auza rider the year it goes into service and that
▶ Play
would be 2828. OK. so after that those costs would be amortized over the life of the asset and that's when google google will be online next year and so
▶ Play
Chair Unverified 4:03:53
we that's right so it would so we're asking that it move into rates like traditional no longer being the Gaja rider when it comes
▶ Play
online. thank you gentlemen Senator Johnson you're recognized thank you Mr Chairman gentlemen I used google Chrome AI to get an answer to a question arkansas exempts electricity from sales tax to large qualified data centers and I presume that Google would fit that criteria that was Act548 of2025 sponsored by Representative Pilkington and of course Senator Dismay I just want to get that on the record because it seemed unclear obviously they have to and I assume this goes through AEdC ordf andA to meet the qual ific ations but it's I think it's $2 billion in investment or something like that so so we are we're not only charging farmers they electricity tax on electricity but we're also they have a meter that's a demand meter and do I have that correct gentlemen my farmers have a demand meter like the ones that testified earlier right
▶ Play
Chair Unverified 4:05:12
most customers that are not just strictly residential how they demand meter and then of course
▶ Play
they pay sales tax on that which would include the6.5% state tax plus whatever applicable local tax would be there correct that's right ok all right thank you all thank you Mr chairman I have just
▶ Play
I have a couple couple questions and thank y'all for being here today and and I've heard we've heard from the from farmers today and and I've also heard from the oil producers in South Arkansas who's bills have increased as well and I'm looking at at the slides well first before I get to the slides as I understand it there are3 projects that are currently financed through through the rider is that correct that's correct are there are there plans for others to be added and if so what is the what would be the timeline on
▶ Play
Chair Unverified 4:06:15
that we have one application pending now before the commission and that is to convert the unit one at White Bluff coal plant to instead of burning coal to burn natural gas so it's a change in fuel source for the unit it's a bold water turbine right so it's are we heating up the water with burnt coal or with gas so we've proposed to convert it to natural gas and how does that expense
▶ Play
compare to these other three projects it's dramatically less expensive you're there
▶ Play
Chair Unverified 4:06:47
you're only dealing with some modifications to the boiler and then you know removing some of the coal equipment out of the way so it's it's nothing like these resources OK and then going back to the slides and and
▶ Play
I was looking at the graph that was just up there and I see that I guess it provides two different two different lines one is with the rider one is the I guess the traditional method and I see that that over time those both trend downward what goes into that downward trend is that just that you're not spending as much money or is it that some of those costs get moved over out of the rider into others or is there some other component that's at work here that that potentially reduces that it's just a
▶ Play
Chair Unverified 4:07:39
declining asset value so you depreciate it over time. so if you have a if you have a 30 year asset we would set a thirtyyear depreciation rate. your goal is to get you know when you're doing utility rate making you're you're striving to get that to zero over that same period so you're factoring in your dismantlement expectations and things like that but all of our rate base whether it's a generator or the transformer serving your house has some depreciation curve tied to it that reduces its ratebas value over time OK and
▶ Play
then if I look at this chart between 2026 and roughly 2031 that's where we see the increase and then it starts trending downward if you look to the next to the bar graph which was the next slide that relates to the actual cost and if if I'm reading this correctly this relates to the cost per kilo 1000 kilowatt hours that's actually billed to the customer is that is that
▶ Play
Chair Unverified 4:08:36
correct we're we're showing you the residential rate yes
▶ Play
kilowatt hour charge so it likewise increases similar to what we saw in the previous in the previous graph that describes what the overall cost is are we actually going to see a similar downward trend on this or is is that I mean I would assume that if there's a downward trend probably the other costs are going to eat up any downward trend but in terms of the rider itself and how it's itemized are we gonna likewise see a downward trend over the next 30 years
▶ Play
Chair Unverified 4:09:09
it's the same math so the bar charts if you look at the solid line on the previous slide you're seeing that number in 26 start to stair step up and then it gets to the total plant value right the solid line. these these bars are just showing you that step up the red bar at the end that Mister Thompson described year one we go to 2513 that's the dotted line you go from ze to 2513 in that example but you're also reflecting all of the financing costs that you didn't collect in the construction period in that total amount they still depreciate over time but over those 30 years you're going to pay significantly more through tradition through traditional the bar charts just showing you how it steps up with the assets that are in there today but is the like the 20 over the next
▶ Play
10 years is it going to be in excess of $20.10 per 1000 kilowatt hours or we'll will customers ever receive a reduction in the in the rider itself based on based on the
▶ Play
Chair Unverified 4:10:14
three resources in it now the $20 the $20 is the inservice number so it would depreciate from that point forward and there would be an actual reduction that's right that's all that equal those those assets start declining in value over time. thank you any other any other questions all
▶ Play
right ing un n thank you for being here today is there any other business coachchair I think our I think our next meeting is set for one o'clock on the 12th on November 1elfth we are adjourned
▶ Play

Agenda

A. Call to Order

2:08 - 3:14 3 segments 2 speakers

B. Consideration of a Motion to Approve the September 15, 2026, Meeting Minutes [Exhibit B]

3:14 - 3:56 1 segment 1 speaker 1 document

C. Discussion of the Effects of Act 373 of 2025 – Generating Arkansas Jobs Act

3:56 - 4:10:39 800 segments 56 speakers

The Public Service Commission staff, led by Danni Hoefer, opened with an overview that the PSC does not regulate data-center facilities, defined key rate-making terms (kayak, other-form-of-payment, special rate contract, RIM), presented an independent comparative model of the Cypress Solar project showing that treating Google’s $526 million contribution as a kayak rather than an other-form-of-payment would lower the revenue requirement and produce roughly a $300 million net-present-value reduction for ratepayers, and explained that solar projects can satisfy the RIM cost-shift test while providing reliability benefits through accelerated payments and minimum demand charges,,.

Legislators then questioned the $1.6 billion total project cost, the $526 million Google share, the 39 % residential allocation, and whether ratepayers would receive a dollar-for-dollar (or greater) return; PSC staff replied that the project replaces retiring generation, adds system-wide capacity, that all 14 RIM sensitivity analyses were positive, that cost prudence is verified through the docket process, independent monitors, and AG review, and lawmakers pressed further on the financial impact, noting that the selected contract option would impose roughly $300 million more in net-present-value costs on ratepayers to secure a higher return on equity,,,,.

Further discussion addressed oversight of cost overruns, protections if a project is abandoned, the differing rate-of-return treatment under CWIP versus traditional financing, and possible tools such as large-load tariffs to isolate costs for very large customers; the commission explained its judicial docket procedures, the role of the AG and general staff, noted an ongoing affordability docket, and did not commit to a specific $1 billion-plus return for ratepayers,,,.

Critics argued that the CWIP mechanism effectively turns ratepayers into lenders, creating perverse incentives and shifting financial risk to customers-as illustrated by equity-vs-debt analogies, warnings about borrowing costs versus credit-card rates, and concerns that interest is paid sooner-while testimony from the Arkansas Advanced Energy Association and Walmart highlighted the Generating Arkansas Jobs Act’s role in attracting investment but flagged insufficient customer protections, a higher utility return on CWIP projects (8.63 % versus traditional rates), and called for repeal or amendment of the CWIP provision,,,,.

Farmers and other rural stakeholders testified that the Act has dramatically increased their utility costs, electric cooperatives said they will not use the GAJA rider and will rely on PSC-approved tariffs, while Intergy argued the rider spreads construction financing and ultimately saves ratepayers; the chair facilitated the exchange with analogies, noted that no motions or votes were taken, and left the matter open for further legislative action,,,,,,,.

Additional inquiries from Representative Wooldridge and Senator McKee addressed affordability, projected rate increases and the pending general rate case; the chair noted that Arkansas rates are about 22 % below the national average, that the upcoming rate case seeks less than a 2 % overall increase (under 1 % residential), and that new tariffs such as time-of-use and low-income discounts are being proposed,,.

D. Other Business

4:10:39 - 4:10:51

E. Adjournment

4:10:51 - 4:20:51

Documents

TitleTypePagesSource
Agenda — ENERGY - JOINT, Oct 19, 2026 Agenda 1 Official source ↗
EXHIBIT B - Meeting Minutes 09-15-2026 Exhibit 1 Official source ↗
EXHIBIT C1 - APSC Slides Joint Entergy Oct 2026 Exhibit 21 Official source ↗
EXHIBIT C5 - Electric Cooperative Approach to Data Centers Exhibit 1 Official source ↗
EXHIBIT C5 - Entergy Letter to Chairs and Presentation Exhibit 8 needs OCR Archived copy · official source no longer available
EXHIBIT C6 - Entergy Letter to Chairs and Presentation Exhibit 8 needs OCR Archived copy · official source no longer available
EXHIBIT C6 - Entergy Presentation Exhibit 6 Official source ↗
HANDOUT - APSC Slides Joint Entergy Oct 2026 Exhibit 21 needs OCR Archived copy · official source no longer available

Speakers

Speaker 2
1 segment
Representative Matthew J. Shepherd Chair Unverified
36 segments
Senator Mark Johnson Chair Unverified
71 segments
Senator Ronald Caldwell Unverified
12 segments
Danni Hoefer Unverified
140 segments
Representative Sonia Eubanks Barker Unverified
20 segments
Speaker 51
1 segment
Representative Richard McGrew Unverified
1 segment
Senator Matt McKee Unverified
28 segments
Chair Unverified
122 segments
Senator Jimmy Hickey, Jr Unverified
63 segments
Representative Jeremy Wooldridge Unverified
27 segments
Senator Alan Clark Unverified
12 segments
Senator Clint Penzo Unverified
44 segments
Representative Rick Beck Unverified
16 segments
Speaker 184
1 segment
Representative Zack Gramlich Unverified
9 segments
Senator Ricky Hill Unverified
29 segments
Speaker 141
1 segment
Speaker 248
31 segments
Eric Olson Unverified
29 segments
Speaker 263
1 segment
Speaker 265
1 segment
Speaker 290
1 segment
Senator Joshua Bryant Unverified
3 segments
Speaker 302
1 segment
Lauren Waldrop Unverified
29 segments
Speaker 347
1 segment
Speaker 158
1 segment
Speaker 363
1 segment
Speaker 365
1 segment
Speaker 185
1 segment
Laurie Cavanis Unverified
1 segment
Speaker 379
1 segment
Speaker 380
8 segments
Speaker 383
1 segment
Speaker 388
14 segments
Speaker 390
2 segments
Speaker 391
4 segments
Speaker 395
5 segments
Speaker 430
16 segments
Speaker 241
1 segment
Senator Steve Crowell Unverified
9 segments
Senator Brad Simon Unverified
1 segment
Speaker 479
1 segment
Speaker 484
1 segment
Speaker 489
1 segment
Speaker 491
1 segment
Speaker 496
1 segment
Speaker 504
1 segment