The Joint Committee on Advanced Communications and Technology opened its session with an informational briefing on broadband development, adopted the September 14 2020 minutes, and approved a motion on special expenses for the committee. [5:13] [5:43]

Secretary of Commerce Mike Preston detailed Arkansas’s broadband funding, noting an initial $4 million seed, $118 million from the CARES Act, $157 million from ARPA rounds 2A-2B, and a pending $125 million of “shovel-ready” projects that could bring total state-level awards near $400 million. [7:52] [8:27] [9:02] [9:35] [10:08] [13:28] [14:02] [14:35] [15:06]

He also explained that the federal broadband definition has moved from 25/3 Mbps to 100/100 Mbps and that current ARPA funds are limited to fiber deployments, raising project costs but positioning the state for future bandwidth needs. [11:48] [12:20] [13:28] [14:02]

The approval workflow requires a joint application from an ISP, a mayor or county judge, and the applicant; Commerce reviews alignment with federal guidance, forwards it to UAMS for technical feasibility, and then funding is authorized. [17:23] [17:58] [18:31] [19:14] [19:49] [20:22] [20:54]

UAMS tracks grant spending through a monday.com portal, recovers unspent balances, and has already returned over $4 million from completed CARES projects. [20:54] [21:30] [22:05] [32:26] [32:41]

Committee members raised affordability concerns about the mandatory 100/100 Mbps tier, with staff noting that lower-speed packages may be offered but the top tier must remain available. [29:32] [29:49]

Legislators were updated that 64 of 76 CARES projects are finished pending UAMS field verification and that the committee is strengthening front-end funding controls to better steward state money. [26:19] [26:33] [27:00] [27:05] [36:19] [36:42] [37:14] [37:23] [37:48]

Representatives highlighted consumer-adoption initiatives such as the Emergency Broadband Benefit and proposed TANF-linked assistance to reduce monthly costs for low-income households. [40:01] [40:33] [41:08] [41:15] [41:40] [41:44] [42:15]

Dr. Joseph Sanford described UAMS’s Rural ID program, which provides technical feasibility reviews, grant administration, and ongoing monitoring for broadband projects, and presented FCC map data showing only 6.76 % of Arkansans had three or more providers for speeds ≥110 Mbps, with 20.6 % lacking such providers. [49:56] [50:26] [50:58] [51:33] [52:05] [52:38] [53:08] [53:40] [54:12] [54:44] [55:52] [56:25] [56:59] [57:32]

Additional data from the NTIA, Microsoft speed-test measurements and 4G-coverage maps indicated roughly 75 % of devices receiving Microsoft updates experienced speeds below 25 Mbps and that mobile coverage varied among major carriers. [58:03] [58:34] [59:06] [59:41] [1:00:11]

Senator Hammer asked whether the $124 million shovel-ready projects undergo technical readiness reviews and if past vendor performance influences recommendations; Sanford replied the review is purely technical and past performance is left to Commerce. [1:00:54] [1:00:59] [1:01:21] [1:01:44] [1:07:36] [1:08:05] [1:08:10] [1:08:13] [1:08:20] [1:08:25]

Representative Jack Ladyman learned that IDHI grants are awarded mainly to cities and counties in underserved areas to quantify needs for future federal applications, without a required health-care component. [1:02:08] [1:02:28] [1:02:34] [1:02:43] [1:02:48] [1:03:00] [1:08:41] [1:09:12]

Representative Frances Cavenaugh inquired about audit timing; Sanford explained that invoice audits occur continuously with a final site visit at project completion to verify installation and performance. [1:03:24] [1:03:40] [1:03:46] [1:04:05] [1:04:15] [1:04:21] [1:04:52]

Representative Stephen Meeks sought information on leveraged federal funds; Sanford indicated no independent federal funds have been identified beyond pass-through CARES Act monies. [1:05:10] [1:05:24] [1:05:38] [1:05:45]

Senator Jane English recalled a prior $2 million rural ID program that built capacity for communities to apply for USDA and Commerce grants before COVID-19 funding arrived. [1:05:56] [1:06:29] [1:07:00]

Lou McAllister, CEO of the Broadband Development Group, reported that state broadband funding has grown from $4 million to about $800 million, that the group’s “AR Broadband Now” outreach has visited 19 counties, conducted over 600 interviews, and identified gaps in access, affordability, and desire for service, including a case where a resident’s bill rose from $30 to over $1,100. [1:09:48] [1:10:21] [1:10:58] [1:11:33] [1:12:06] [1:12:41] [1:13:13] [1:13:50] [1:14:20] [1:14:54] [1:15:29] [1:16:04] [1:16:36] [1:17:07] [1:17:40] [1:18:12] [1:18:44]

An affordability analysis showed that in a census block with a $23,000 median income, typical broadband costs of $100 per month far exceed the state’s estimated affordable range of $20 per month (1-1.5 % of income). [1:19:15] [1:19:50]

To achieve address-level accuracy, McAllister engaged consulting firm Altman Salon to map service availability and pricing for every address, noting instances where a street is listed as served but individual homes are not. [1:20:28] [1:20:59] [1:21:35] [1:22:05] [1:22:37]

The project remains on schedule with a master plan expected by early April; McAllister pledged to incorporate survey feedback from about 400 respondents and to share customer-satisfaction data with Judge Porch. [1:22:37] [1:23:12] [1:23:23] [1:23:29] [1:23:34] [1:23:47] [1:24:05] [1:24:17] [1:24:48] [1:25:01] [1:25:06] [1:25:28] [1:26:01] [1:26:22]

Committee members expressed concerns about competition and quality control; McAllister acknowledged that current grant practices can create monopolies and suggested policy revisions, while Representative Ennett asked about equitable service, prompting a commitment to develop mechanisms for tracking speed, price, and reliability. [1:26:32] [1:26:38] [1:27:07] [1:27:31] [1:27:38] [1:28:13] [1:28:44] [1:29:00] [1:29:15] [1:29:29] [1:29:46] [1:30:17] [1:30:51]

Philip Powell of the Arkansas Farm Bureau described the September Connectivity Summit, which gathered over 250 stakeholders, and affirmed the bureau’s support for the state’s master-plan effort and its ongoing county-level engagement to assist the Broadband Development Group. [1:31:09] [1:31:32] [1:31:38] [1:31:40] [1:32:08] [1:32:44] [1:33:16] [1:33:48] [1:34:21] [1:34:54] [1:35:25] [1:35:55]

The committee agreed to consider a joint post-holiday provider visit to align on feedback and the master plan before adjourning. [1:36:20] [1:36:31] [1:37:02] [1:37:33]

Official video page ↗

Transcript

Transcript available Whisper ✓ SliQ live captions ✓ Download .txt
Machine transcript

May contain errors. Verify important quotations against the official video.

About transcript accuracy
Source
Whisper
Model
ggml-large-v3-turbo.bin
Processing date
October 25, 2026
Unknown speaker 0:00
Thank you. Thank you. Thank you. Thank you. Thank you. Thank you.
▶ Play
Speaker 3 3:00
The Joint Committee on Advanced Communications and Technology will come to order. Welcome everyone here. This is an informational meeting, which the legislature hadn't participated in, but pretty much the funding parts, and I'm sure there's plenty of questions, and my co-chair, Stephen Meeks, if you will, have any comments? Okay. Senator English has kind of done a lot of work on broadband and securities, and I would like to give her just a second. Thank
▶ Play
you very much, Chairman. I'm so glad to see everybody here today, and as the Chairman said, this is really an informational meeting, but I think we have talked about broadband for a good while, and in a short period of time we have had available to us including about 125 million that we hope to approve this Friday about 400 million dollars for broadband broadband is important to every single solitary community here in the state of Arkansas and we as legislators have to be a lot smarter about what's going on and there's so much going on and there's so much money out there and so many programs that we need to be really smart to make sure that we make the best use of all the resources that we have out there and that our communities are well served. So today, this is going to be kind of an informational thing, starting where we started with a little bit more and where we're finishing and with our master plan that we hope to have accomplished here in the spring. Thank you.
▶ Play
Speaker 3 5:13
Thank you, Senator English. I would accept a motion to adopt the September 14th, 2020 meeting minutes. Motion. Second. All in favor, say aye. Aye. All opposed, like sign. Thank you, members. Consideration for a motion to adopt the chairs to approve special expenses incurred by the committee. Motion and second. All in favor say aye. Aye. All opposed, like sign. Thank you, members. We will begin with a presentation on the broadband development and accessibility by Secretary Mike Preston. If you will, just, whenever you get seated, introduce yourself and your position.
▶ Play
Speaker 23 6:25
Thank you, Mr. Chairman. Mike Preston, Secretary of Commerce and AEDC Executive Director. Stephen
▶ Play
Speaker 19 6:30
Porch, Chief Legal Counsel for the Department of Commerce as well as the Director for the Arkansas Rural
▶ Play
Speaker 23 6:38
Connect Program. All right. Well, thank you, Mr. Chairman and Representative Meeks and Senator English for pulling this together. And forgive me on the front end, I am losing my voice. I don't have much left, so I'm going to try and be as brief as I can and give as much background. And I've got Judge Porch here to fill in the blanks, but happy to answer any questions. And I know I'll be back on Friday to talk even more, so I'll have to save some breath or what voice I have left. Senator English, I think you did a good job of talking about that this is a good opportunity for us all to come together and talk about broadband and where we've been and where we currently stand and where we hope to go in the state. Because I do think it's significant, the progress that we've made as a state. I know for many years it was a hot topic and one that people worked on with seemingly little progress for many years. And I'd say the one thing out of the pandemic, if you can point to a positive coming out of it, is the fact that the emphasis on broadband just grew exponentially that much quicker. And we were able to put things in motion. And as Senator English made reference to, with the pending approval of another $125 million on Friday from ALC, we'll be up to $400 million in awards in broadband. Two and a half years ago, that was an unheard of figure that we would have never really envisioned being able to get to. But let me back up to 2019 when the governor first announced the broadband office in conjunction with the Department of Commerce and his plan for rural broadband development in the state. At that time, his goal was to have broadband deployed to every community in Arkansas, 500 citizens or greater by 2023. It was a very ambitious plan, but one that we were working with the legislature and trying to figure out how we would be able to get there. We started out with a small sum of $4 million. Seems pretty small compared to the now almost $400 million that we're at today. So we had the framework set up in place, which was very fortuitous given what was about to happen to our country and to our world with COVID. So we had the framework set up. We were working on rules and trying to get everything in place so that we could have a process by which to do this. Well, obviously when COVID hit, the game completely changed for for everybody in many different ways, including broadband. We now saw that, you know, not only was it a, you know, a need that people had, it was, you know, a life or death situation for people as we needed it for telemedicine. People needed to be able to work. People needed it for, you know, for school and education purposes, you know, let alone the gaming and streaming of Netflix that people had to do as they quarantined for a long period of time. So we saw just how important that was and thank goodness we had that structure set up in place instead of the rural connect I guess we've never really changed the name to reflect where we are but it's really just Arkansas connect because we kind of took the rule out of it and we knew that there's underserved areas in the entire state rural or not but a lot of this has been focused on more rural areas as it was set up for us to get some funding out so very proud of the work that's been done it has been a collaborative effort there are a lot of moving pieces so I think you'll hear a lot of that today hopefully this will give everyone a broader context of what all is going on in broadband, what all is going into it, and how hopefully we ultimately want to marry all this up together. And you'll hear from Mr. McAllister and his broadband development group who's doing the bigger strategic plan for the state and how we all make this work together and moving forward coming out of it because while we spent or will have spent close to four hundred million dollars by the end of the year, we know that we still have work to do and there's still more broadband to be deployed. We still have, you know, another $400 million in requests sitting in our office to be funded to get broadband out. That's going to help move the needle some. The infrastructure bill that was just passed will be another mechanism by which we can draw down additional funds. So all these pieces working together, we're going to get there. I'm confident in that. In terms of how I look at it as an economic developer, you know, this is, you know, akin to the electrification of the state many years ago or what railroads brought to many communities in Arkansas at the turn of the last century and how that helped. This day and age, if you don't have broadband, you're not going to be able to be competitive as a community, whether it be for business or for people. So it's paramount that we have this in place and what we're able to do. I will take you through, and you have this in front of you, so try not to read just too much into the slides, but I mentioned we had $4 million that we started with, and we were working to get those funds deployed to get broadband to those communities, 500 or more to make sure everyone was served. When COVID hit and we were awarded the CARES funds, we knew we had an opportunity to deploy some of the broadband money, some of that money to broadband. So a couple with the state funds we had is actually 4.5 million. Then we had 113.5 million in CARES funds for a total of 118 million. That represented 72, excuse me, 76 total projects. A number of households of 55,000 that were not served previously now included 130,000 Arkansans who had access to it. Now the definition is something I want everyone to pay attention to and you'll see it referred to as broadband. What is the definition of broadband? And it changes over time. When we started this, it was 25-3, you know, upload, download. With the new CARES Act, it's now 100-100. So that changes. On round one of CARES, it was all across the board of what could be deployed. It could be fiber. It could be fixed wireless satellite. You know, it was by all means. Now with the CARES funds, or excuse me, the CARES with the ARPA funds, it is only fiber. So that continues to change. So again, a lot of moving parts to pay attention to as we're dealing with a lot of federal money and a lot of constraints that come with that. So That's something that we pay very close attention to, and I know the other folks who are planning to present will also speak to that. And again, this is a partnership. We contract with UAMS, who I know you'll hear from shortly, who administers the Rural ID program for the legislature, which is an important component of this as we move forward. But they do all of our technical reviews, our auditing on the program and projects as well. So they're a key component for us. So as we got the CARES Act funds awarded and out the door, as everyone is aware that this was, you know, these funds were very time-limited. So we're moving extremely quickly to get these funds out the door in the ground in the broadband service to those 130,000 Arkansans. Next slide you'll come to is the American Rescue Plan of the ARPA funds. This represents round 2A and 2B of funding through that. That's a total of 56 awards for $157 million, represents 35,000 households and approximately 87,179 Arkansans. You'll notice that it got a little bit more expensive in this round, and that's because all this to be deployed was fiber, which does cost a little bit more, and it must be a minimum of speeds of 100-100. So while it does get more expensive, it allows us to better set the stage for the future as broadband continues to evolve and get faster and needs to withstand more bandwidth coming in. So that takes us to round 2A and 2B of the American Rescue Plan funding. So total projects awarded to date, 132 projects, a total of $275 million of state and federal funds. Now, the bulk of that is obviously federal funds with about four and a half coming with what we started with there in the very beginning, 89,000 plus households and over 213,000 Arkansans with access now to broadband that did not have it before. We have pending in front of the legislature that was presented to peer yesterday an additional list of 32 projects that are shovel ready. That means that they have passed our review and been sent on to UAMS and approved for the technical review. This represents an additional approximately 125 million dollars in projects and I've got two slides here I think that cover all of those projects in total which will take me to the last slide here that is the ARC broadband coverage if you map it all together around one through CARES and then 2A, B, and C as we're calling them through ARPA and again that last one is pending legislative approval on Friday but that's what the map looks like in terms of our projects of where we're going. With that, let me pause and try to catch my breath and what little voice I have left and let Stephen chime in here. Stephen is, I just want to say publicly, I appreciate his efforts. He came to the Department of Commerce as their general counsel and still wears that hat, but when we were setting up the broadband office and COVID hit, we needed some very smart people to come in and help write the rules and administer the program. And Stephen was right there to volunteer to help out and take over and has taken on the leadership role in the broadband office and has done it really relatively with a small staff at times fluctuating between two and three people to support them. We now have some administrative support coming in through our CTEC Hagerty contract that was part of the offer funds. And we look forward to working with the broadband development group as they're processing and building the statewide strategic plan for broadband. But really appreciative to Judge Stephen Porch and all of his efforts, not only to be our chief legal counsel, but to lead our broadband office and work with so many internet service providers and mayors and county judges. And I'll turn it over to Stephen to talk a little about the process of how we approve and we look at these projects and the reach out that we do and the partnership that we have with the internet service providers, as well as the county judges and all the mayors across the state who play a vital role in this. So, Stephen, let me
▶ Play
Speaker 19 16:47
kick it over to you. Thank you, Secretary. One of the things that we do is we try our best with the limited amount of staff that we have to try to reach out to everyone. I honestly believe that to get broadband out into the entire state of Arkansas, you need two things. You need communication and you need cooperation. If you're missing either one of those, then it will not work. You need cooperation, not only from the ISPs, but with the mayors and the county judges as well. We make it a point that when we get these applications in, we try our best to review them from the standpoint of what will be best for Arkansas, what will benefit Arkansas the most. We look at how much population that they will cover. We look at which areas are really the ones in need because we know that FCC data is skewed on that. So it makes it really a test to try to dig deep to find out exactly what those areas of need are. I can submit maybe two or three maps to you, and then somebody will be able to pick out that, well, I know this area here is not served, so what do we do about that? Well, we have BDG that's going to help us with that, and I'm not going to comment too much because he has his own statements to make, but one of the things that we want in having this holistic approach is that we want to be able to have some KMZs that is commensurate with what his findings are around the state. He's looking at every state, I mean every area, and if we get those KMZs, we'll then know on a broader scale opposed to how we do it now just by application by application of who really is the areas and the Arkansans that have these needs. Now, with that, our process is simple. They can go ahead and they must partner with an ISP, must partner with a mayor or a county judge, and they submit a joint application. We take that application. The first thing we do is review it, see what kind of technology you're looking for, making sure that there's not any conflicts within it, particularly as it pertains to the federal guidance, which the pot of money that we're coming from. Once we look and find that there's no issues with that, we then forward that information over to UAMS, the IDHI department. We send it there so they can do a technical review of that area and see whether or not their application is feasible. Once they do that, if there's some issues with it, we don't automatically kick your application out. We let the applicant know that these are the issues that we're having with it and that these are the things that need to be corrected before we can go forward. So we're very proactive in trying to work with people and trying to get them to understand what we're looking for in Arkansas. And so if UAMS approves the program, then we, of course, will then approve for funding. But let me back up just one step. one of the things we do is we look at their KMZs as well. Their KMZs is their project footprint. How many people are you going to serve in that project footprint? And sometimes we may get other competing projects, and we look at all of those to make a determination of which project would be best for Arkansas, which ones would give us the most bang for the buck. Once we have established that, then, of course, running it through UAMS, we'll go ahead and we'll do funding at that point. Now, with the funding, we have UAMS. They're the ones, which they explain, that they are the monitors of it. They've instituted a portal called monday.com. All their receipts go in through that portal. And it's understood by our grant agreement as well with these ISPs that at the end of that project, if they have not expended all the funds that they were allotted, then they give those funds back. We saw what happened with the CARES Act. We did that same process. We got money back from different ISPs, which we reallocated as another grant for another community in need. That's our way of trying to be good stewards of the money that we have so that it's just not going to waste. And it's the same way with these ARPA funds also, that any money that they use for their project that goes unexpended, they're to return to us. And if we can do another project for an area of need, then that's what we're going to do. We rely heavily as sort of a boots on the ground as far as them doing exactly what they stated in their application with UAMS. UAMS is our boots on the ground to make sure that the equipment that they applied for is being used and the area that they said it's going to be used in and for the amount that it's going to be used for. So we try to make sure that everything runs accordingly and so far it has worked. So now, I'm going to jump a little bit ahead of Lou, just a little bit, of BDG. Once we get that plan, that holistic plan, the thought is that we're going to be aggressive in carrying that out. We know that ARPA funds has a time limited on it, as Secretary Preston has talked about. So we don't have much time to sit back and not execute that plan. Once the plan is done, I plan on sitting with Lou and sitting with key people to work on an implementation plan that is aggressive in doing so. I do, with the added of CTEC to help with the administrative part of the Rural Connect grant that's going to help me free myself up to be able to do more and more outreach with different agencies and communities, something that has been lacking, something that I've heard from you all and that I respectfully acknowledge. So we're all learning in this process as we go along. Arkansas has made great leaps and bounds in where we were to where we are right now. We need to continue the forward momentum. We have things in place to really make Arkansas shine above other areas, more so to draw businesses to us as well. We're going to work hard, and with your support, it will be successful. And that's what I have, Mr. Secretary. Thank you, Stephen. And
▶ Play
Speaker 23 23:56
we'll just wrap there. I know there's a lot of other presenters behind us, and we don't want to monopolize the time, but I just want to acknowledge the partnership with the legislature on this. And I think meetings like this are extremely helpful. So, you know, I think it's good for us to periodically come together to give updates of where we are and where we currently stand. But, you know, I think we're lockstep on this as the legislature has worked on this as we develop the rules and then the subsequent emergency rules that had to reflect the CARES and then the ARPA funds. Obviously, the governor's leadership on this and thinking about broadband prior to the pandemic and getting this set up. so we had a structure in place has been important. UAMS and what they do for us. I know Farm Bureau has been a very active participant. The electric co-ops and then happy to bring in broadband development group as a consultant is going to help tie us all together to make sure we're moving in the right direction. And again, I appreciate the time and the opportunity to speak here today and happy to answer questions. I don't know the flow if you want the rest of the presenters to go or If we've got
▶ Play
Speaker 3 25:05
questions for us, Mr. Chairman, I'll defer back to you on that. We have some in the queue. I would ask what level of completion, like the CARES, I know the funding has been allocated, but is those round one, round two, 2B, those things, what level of completion are these projects?
▶ Play
Speaker 23 25:24
I'll let Stephen speak specifically to that, but it made me think of another good point. Now that so much of the ARPA funds are flowing and we have the infrastructure package that's out there, what we're seeing is other states starting to emulate what Arkansas has done and set up programs like this. So, you know, not only are we kind of in the shortage of supplies right now, everyone knows the supply chain issues that we're running into, but pretty soon it's going to be even shorter supply on labor who's able to do these type of projects. So for us, you know, we've leaned forward because we want to get as many of these under contract as we can rather than, you know, have to get to the back of the line and the end of the queue for other states as they're starting to sign these contracts and do similar works in their states. So that supply chain pinch and the labor pinch is going to be felt on these projects as well. But Stephen can speak to a little
▶ Play
Speaker 37 26:16
bit more about where we stand with some of
▶ Play
Speaker 19 26:19
those CARES projects and ARPA ones. On the CARES project, as I recall, we issued out 76 of them, 64 of them are officially completed. I've gotten calls saying that they're ready for UAMS to go out there and do the evaluation. No project is completed until UAMS get their engineers out there to see if Arkansas citizens are getting what they're saying they're getting from their application. So that's a little bit of a slower process because they've got to drive through the state to get that. But I think from what I'm hearing, we'll be on task to get those remaining ones of the 76 done, but 64 is the number that we have done. Is that
▶ Play
Speaker 3 27:00
CARES funding, is that in December, or when is it in December?
▶ Play
Speaker 23 27:05
It's committed by December and then expended by the end of March. Right. All right. representative love thank
▶ Play
Speaker 3 27:14
you mr chair and um first of
▶ Play
Speaker 45 27:21
all um thank you all for the work that
▶ Play
you're doing because this is something that is vitally needed um i have my i have my own story and i live here in little rock but i want to go back to um secretary press and something that she said in defining broadband and we're using the 100 100 100 up 100 down at this time well I have some questions in regards to that because I'm reviewing some proposals right now to to submit an application on behalf of Pulaski County and not to get into any specific details of those proposals. However, when we start, when we begin to talk about the affordability price point and the 100 up, 100 down, in reviewing the applications, you know, I would say this just in my own thoughts. You know, when you begin to talk about 60, 70, 80, 90 bucks for the average Arkansan, that's not going to be what I would consider affordable internet service and so I guess number one I'm looking for a little guidance on what you all are considering the affordable price point and I know that you know county judges and mayors are supposed to be negotiating that with the provider but number one what are you all looking that on average is an affordable price point for internet service connections. And then is the minimum proposal that they can provide or the minimum package that they can provide as far as internet service in these proposals, should that minimum, should that floor be 100-100? Or can they provide other packages within, say it's 25-3 or 55 or whatever? Or is it just, you know, with this grant, is it just 100-100 is the basic, the minimum package? No, you
▶ Play
Speaker 19 29:32
can have various packages on it. The way that we read the rule is that you have to offer it to the people. You can have packages lower or higher, but you're going to have to offer the 100 by 100 to the people.
▶ Play
Okay, that's what I was thinking about because I was like 100, 100. And I'm looking at it as like, is this affordable to the average of 10s? And nine times out of 10, it's what I would consider not going to be affordable. So, okay. All right, thank you all.
▶ Play
Speaker 3 30:09
Next is Senator Hammer, and I think he wants to recognize a group that is here with us.
▶ Play
Thank you, Mr. Chair. Point of personal privilege, please. Yes. thank you was out in the hall a while ago and some of y'all had received emails regarding doing interviews i'd like to ask if you would uh chris scatton who is the uh instructor at lakeside high school for the broadcasting class chris if you would stand please and you have students back there with you if you would have them stand as well they are actually competing for a c-span documentary competition, and you saw their cameras set up out there, they need some more interviews in order to help complete their quota. So any members that have ever wanted to be interviewed by a friendly media outlet, here's your chance right here, okay? So if you would, please give them a little time after this committee meeting so they can have the complete interviews that they need to get. And thank you all for being here today. can I ask a couple questions? Absolutely. Thank you. Thank you, Mr. Chair. Thank you. You've got the number of households listed on your document. Do y'all separate out the number of businesses? Because I know some areas can't get businesses in, such as maybe a local store to put in because they don't have access to the internet to be able to upload, you know, their inventory and all that. So do you break out the number of businesses that you've provided services to?
▶ Play
Speaker 19 31:50
We don't break it out, but, of course, the businesses, there are businesses in many of the footprints that we have. They will also get service in there. But we've been going strictly by households because the census information we use in making those calculations
▶ Play
Speaker 62 32:07
is easier for us to figure out. Okay, and then how many completed projects did
▶ Play
you reference a while ago or projects that have been completed? Sixty-four. Have any of those returned money? Yes.
▶ Play
Speaker 19 32:26
I don't recall which ones, but I think we had a total of over $4 million from the cares that was returned to us, and we issued another grant. That's okay. If you wouldn't mind, I'd like to get
▶ Play
that. Maybe the chair would want that sent out to the committee members, but I'd like to know the amount of money that's been returned from the completed projects, please. Yes, sir. And then in a previous meeting, I'd voiced concern. I noticed that in the shovel-ready projects, there's a provider, and I'll talk to you offline about it. They don't have a real good reputation where they're providing service now when it comes to considering the awards of providers that are going to get more money, how much do you weigh in to the decision to award based on input that you've gotten from where they're already providing services and whether or not they're doing a good job to the customer base they
▶ Play
Speaker 19 33:26
have? A lot, because when we start issuing these awards, I think they understand it's not a good business practice to not deliver or not accomplish what they're trying to do. Now, of course, there's other issues that may be the cause of it, but a feasibility study is what's required of them if they're going to submit a project to us. We're expecting you've exercised your due diligence on it. And if you haven't, and we learned through this process that there's been a problem, depending on the problem, because we look at it on a case-by-case basis, because everything's different, then that may go into some
▶ Play
of our factoring. Okay, and the last question is, you were very critical publicly about the award that we gave to Lou's group to be able to do this job. What's your experience been so far that you've been working with Lou's organization now, having been as critical as you were publicly
▶ Play
Speaker 19 34:29
before? Me and BDG, we sat down, we spoke. I'm in full support of BDG. We're going to work together. We're going to get as much done as possible to serve the citizens of Arkansas, and that is my main focus right now in doing that. We speak regularly. He'll let me know what's going on, and we bounce information off of each other on what is the best way to do things. So at this point, he is our consultant, and I back him up, and I'm going to do whatever I can to make sure this is a success.
▶ Play
Speaker 3 35:08
Thank you. Thank you, Mr. Chair. Thank you, Senator. From here out, as a respect for the presenters and trying to get through this, I'm going to allow one question and a follow-up, and you can get back in the queue if you have further. Right now is Senator Hill. Thank you,
▶ Play
sir. Now, that goes into effect after me, right? No. Secretary Preston, I'm going to ask you this question. You may defer it to UAMS, I'm not sure, but I'm asking you because at the last ALC meeting you told me you were the point man. So I'm going to start with you. How are we doing the funding for these construction projects? Is it a fund X amount after so much is completed? Are we funding it up front at the end? What is our, I'm going to say, construction draw phase? What phases do we have where we're funding? We're not just throwing money out, because I know there's a lot of people getting into this business that do not have any money to operate and go with, and we don't need those people doing the jobs, because I'm trying to see
▶ Play
Speaker 23 36:19
where we're going to be good stewards of the state's money. And we discussed this at length yesterday in PEER. we are awarding funds on the front end, and then UAMS does come in, and as Stephen alluded to earlier, they have to submit their receipts and documentation. UAMS audits that and pushes forward if there's any issues or concerns. We're working on a proposal now to maybe change that process up a little bit to put it more on a schedule as opposed to the upfront. As I mentioned, when we started this, it was move as fast as we can to get the money out because of the cares had to be deployed in the ground, and we wanted to have that done, and we wanted broadband access immediately. So a lot of the smaller companies, it would have been an issue for them to not be able to have that mechanism. But as we look at this process going forward, we're always looking for ways to improve it, and we've taken those comments from the Senate yesterday and looking at ways to improve that and hope have something back to the legislature by Friday's ALC. Okay, I would like to work with you on that because I do work at
▶ Play
a bank and we don't give you the money up front, okay? You go to get any construction job, when the work is complete, that's when you get the money. If you're doing a farm improvement, when you do the work, then you get the money. If we're going to be good stewards of the state's money, we need to make sure we take care of it and right now with what, I'll make sure I heard you, we're funding up front? We are, yes sir. We're not being good stewards of the state's money. I'm sorry. There's no other way to put that. Thank
▶ Play
Speaker 3 37:52
you, Senator Hill. Next, we will go to Representative Kavanaugh. Thank you,
▶ Play
Mr. Chair. I'm over here. My question just really kind of goes to, we talk about. Sorry, push that again. Okay, sorry. Turn me off. So when we talk about these shovel-ready projects, and we're going to serve so many Arkansans. Can you get us a number of how many of these Arkansans have had signed up for this broadband once it's been made available to them? I'm kind of piggybacking off of what Representative Love was talking about, was the cost ability for the people to be able to afford it. So we can spend all this money and get it out there. I'm curious how many are actually signing
▶ Play
Speaker 19 38:41
up for it. I can issue out a letter to our awardees and ask them to submit me their numbers for the various areas, and once we get those things, I can make sure that I share that with you and
▶ Play
Speaker 3 39:00
the rest of the committee members. Thank you so much. Thank you, Representative Kavanaugh.
▶ Play
Next is Representative Rye. Thank you, Mr. Chair. Really, it's a two-fold question, fellas. You know, you mentioned, Mike, that it was $275 million up to this point that we had spent. Now, what I would kind of like to know is the money that we are actually going into this with, is this for our infrastructure? And once we get past that, it's going to be left upon the people that actually want the internet, broadband. Is that right? That's correct. And let Stephen chime
▶ Play
Speaker 23 39:42
in a little bit about the EVB program. The adoption rate is something that we want to pay attention to, to Representative Kavanaugh's question, to make sure that people are applying because we're getting the infrastructure out there. We've got to give them the access. So now what is the adoption rate? But there are some programs out there to assist with that.
▶ Play
Speaker 19 40:01
There are programs with it, of course, we know the issues is affordability, education, those are the top two issues with people taking up broadband. The EBB program is one that's really good. They're offering $50 a month to those that qualify, those with low income housing. That's a good process because it also allows up to $100 for things such as a laptop, tablet, or a desktop. We're also having discussions with TANF about a potential program that may come forth that will be in addition to what the EBB has, but that is still in the talk phase of it, And we're hoping by maybe next month or something, it may be something that we can bring forward. But we're looking for those ways to really make broadband financially easy for those who really need it, who may be having some financial challenges. For
▶ Play
the folks that can't, or maybe think that they can't afford this, but would like to do this, and it actually is a part of what they're putting in for each household. How will that be paid if the person cannot afford it? In other words, you know, if it costs $60 a month and you got a low income, how will that be paid, sir? Where will that money come from to
▶ Play
Speaker 19 41:44
pay that bill? For them to have free internet service? Well, what we're doing, and I'm trying not to get ahead of what I've had discussions about with TANF, but if everything works accordingly, like it should, then people will at least be able to get possibly up to four months. But, of course, with broadband, to take care of it, it's got to be affordable, but I don't see how we can have an absolute zero cost in perpetuity. If we can get that program going, and if the committees can bless that once we work out the details of it, then that would be something that's going to be real beneficial for Arkansas. And they can use that program with the EBB program as well. So that's going to be an added benefit of an additional $50 a month plus what they're getting from that program once we work out the kinks and get it set up. So, there's going to be a cost to broadband on it. We're trying to make it easy on them as much
▶ Play
Speaker 3 43:01
as possible. Thank you, Representative Ryan. Next is Representative
▶ Play
Speaker 89 43:12
Ryan. Thank you, Mr. Chair over here. Just a quick question kind of following along with Representative Kavanaugh's and just the idea of funding. Recently I built a property and this property is in the fortunate area where it's kind of on a boundary of an underserved area and a served area and the internet service providers happened to run fiber right down the street and i called and and since i've got two competing companies one with fiber one with regular coax now it's you know it's me debating on which which monthly bill do i want to pay don't pay for fiber pay for coax and when i when i called to ask for service they said your driveway sits 1720 feet off that line will need a cost share to get that service to your house. I said, okay, let me know how much that costs and I'll factor that in. The bill that was going to come to me had I called for a $54 a month service was $26,000 to get that service to my property. So when I did the math, Starlink is $100 a month and that's 21 years of service I get with Starlink for that cost. So I guess my question would be is of the money that's being provided for all these expansions of services is where does that file final mile stop and if that is the case as far as the owner the property owner would be responsible for that distance is there a cutoff point to where we have to go ahead and get that that line to the directors of their house because if we're talking to rural properties i mean this house sits on three acres so you build on the back side of your properties you have a 1720 foot driveway so any any
▶ Play
Speaker 19 44:58
comment on that it it takes anywhere from about fifty to seventy five thousand dollars to bore a mile of fiber and if you have stone that's in there it can go high as a over two hundred thousand dollars just to bore it out there. So, that didn't surprise me that they would charge you that amount of money just to get you a line in there. The best thing to do in that situation is, if you're in an area that's a community that's already unserved, is to basically apply for a grant that will cover that area which you're in and those other underserved areas and allow us to evaluate that. That's a large cost for any one person to do it. We're not rich. We're servants on there. And so while we have resources available, I think the best thing to do is if we could possibly coordinate with one another and we can or maybe let BDG know exactly what your issue is on that, and maybe there's a plan that could be instituted that will cover your needs so people won't have to pay that ridiculous amount of money, which I understand why it is, but for just a simple consumer, for a 50-plus dollar package, that's a lot. Correct. Follow-up, Mr. Chair, just
▶ Play
Speaker 89 46:31
to finite that question, if you have a, you know, in my area is terrain challenge and I can see why providers don't want to go into a challenging terrain but if we're talking about these open areas in south Arkansas or the rice areas of Arkansas and you have 10 you know 100 acres and there's 10 homes on it and there's a single shot right down the middle of it that's an easy run to knock that out and to run fiber straight down that road but if each of these homes are sitting a mile off that road is that individual going to be responsible for those runs down their driveway, or is that part of the improvement of this grant money?
▶ Play
Speaker 19 47:13
Well, when we issue a grant and it has a footprint in it, we're expecting those houses within that footprint to have fiber. So all they have to do is be able to come out and connect up to it. Because if you're within that footprint and your driveway is extended far from the street itself, Well, we're expecting you to connect those people, not say, well, we didn't know it was that long. That's your obligation. If it's within the footprint, you need to be served. Thank
▶ Play
Speaker 3 47:52
you, Representative Bryant. Next, Representative Hawks. Thank you,
▶ Play
Mr. Chair. I appreciate being close to the end because we've alluded to a lot of these. But do you guys foresee any other rules changing for the grant process or any changes coming that you guys see that haven't been mentioned or alluded to already?
▶ Play
Speaker 23 48:14
Any rule changes to the? Yes, to the grants. I mean, I'm sure as we get the guidance from the U.S. Department of Commerce on the infrastructure bill and what guidelines that has, we'll probably have to update our rules. So I think, I mean, this is an ever-changing and evolving process that rules will be updated. And just to what Senator Hill spoke about, we want to, you know, add in some protections on the front end as well. So there's going to be continued to be changes as we look to improve the program. Nothing specific at this time other than what we're working on with the
▶ Play
Speaker 3 48:53
Senate in terms of those upfront costs. Thank you, gentlemen. We're going to move on to Rural ID program with Dr. Joseph Stanford. Just go ahead and introduce yourself, and you're welcome to proceed. Yes, sir. Thank you
▶ Play
very much. My name is Joseph Sanford. I'm the director of the Institute for Digital Health and Innovation at UAMS. I may want to
▶ Play
Speaker 3 49:53
pull that thing up a little bit closer to you.
▶ Play
Yes, sir. Is that better? Yes. Thank you very much. My name is Joseph Sanford. I'm the director for the Institute for Digital Health and Innovation at UAMS. I also serve as the chief clinical informatics officer for UAMS. So I was asked here today to speak to you all about UAMS and the Institute's role in broadband in recent history, particularly including the Rural ID program. I was also asked if I could speak on some slides that I showed at the connectivity summit relating to national broadband maps. For those that are not familiar, Digital Health and the Digital Health Institute encompasses the integration of any digital tool, computers, mobile phones, internet access, wearable devices such as your iWatch or smart blood pressure monitoring tool, weight, blood pressure, glucose control, things like that. And we look to integrate all of that into the most effective clinical care that we can. At the Institute, we do this through real-time interactive video patient consultations and educational and research curriculum. Overall, our goal here is to optimize all of the software devices and human interactions that we can to improve health and wellness. So what does that have to do with broadband? The broadband backbone is how we deliver these services, and so we became interested as an organization in that, starting back in 2003, but became particularly interested in 2010 when we were awarded a $102 million BTOP grant to expand out telecommunications opportunities. That took the form of the UAMS e-Link program, a map of which you can see on your screen, and it really serves as the core team by which we began developing technical expertise for broadband deployment, particularly as it relates to health care. In particular, as it relates to the Arkansas Rural Connect and Rural Broadband ID programs is our team of technical reviewers that we can deploy to projects as needed. This brings me to the Rural Broadband ID Expenses Trust Fund grant. This was approved in April of 2020 to help cities, incorporated towns, counties, and unincorporated communities conduct broadband due diligence business studies. These studies are required for future grant and loan applications. It covers a number of eligible costs, including full feasibility determinations, including economic business plans, 20-year financial break-even analyses, competitive broadband analyses, demographic work with comparison to other projects across the state, construction plans to maximize return, and analysis of federal funding opportunities using consultative services as well as legal counsel. For those interested in learning more detail, our NOFO is on our website at idhi.uams.edu. This is administered through the state of Arkansas and managed by the Institute. It had a $2 million award budget with, in law, a maximum number of 30 grants with a maximum amount per award of $75,000. To date, we have awarded 20 grants. There are none in the hopper. We have awarded $1.3 million and there is a little over $726,000 available to spend. Two points that were mentioned earlier. What happens if funds are remaining in the process? We review that to the same degree in terms of invoicing and expenses on a line-item basis, and we have had funds referred back to us to be eligible for other broadband grants. Our role is briefly summarized here on the flow diagram. Once we get the NOFO similar to the ARC program as was discussed by our colleagues at Commerce, work with them iteratively in order to make sure that they have a all of their questions answered and the best application that they can have before final feasibility is determined so that has a resultant resubmission process and then once it meets for potential approval we draft a legislative recommendation to y'all for award recommendation once or if approval is obtained then we work with them in an iterative process to issue the PO to the awardee this follows our UAMS procurement practices and then do the final study review and intermittent monitoring of spending at four and six months and that process involves getting invoices back comparing against the submitted budget validating those invoices for legitimacy and if we have any questions working with the grantee to identify and resolve and reconcile those, and then as I said, if there's any remainder, requesting those funds back. For the Arkansas Rural Connect program, which I won't spend much time on this slide because our colleagues in commerce covered this very much in detail, we provide two roles. We are in a review role for technical feasibility and in a monitoring role. I'll call out one discrepancy: you may notice that my numbers on the budget are different than Secretary Preston's. That's because they have the most recent information I was working off of files I had available to me at the time, and this is a very active project. So I would defer to them for accuracy in that regard. Our review role is largely as described: once Commerce sends us the packet, we do a technical feasibility review. This involves, as Judge Porch mentioned, several iterations potentially on question and answers to make sure that we understand and agree of the equipment they're proposing to deploy, where they're proposing to deploy it, and that will meet all the necessary objectives of the program. And then after that is complete, we send it back to the Department of Commerce for award. On monitoring, this is the more involved process. So once the award has been issued, we get them set up for the next step in the process of the monitoring. That involves creating, as Judge Porch mentioned, a Monday.com account to be able to send us files for review, among other things. We review the project updates, invoices, comparing it to the application, other information we gather during the initial meeting and then meet with the awardees on a monthly or quarterly basis to do invoice review. So I'll speak a little bit more on the fiscal monitoring in detail. What happens is the receipts and invoices are submitted by the awardees to our file system. It usually comes with a spreadsheet of expenses with notes to let us know if there's a substitution of equipment that occurred. This happens occasionally due to supply chain issues where switches, routers, things like that may not be available. We validate each of those substitutions for appropriateness to make sure that it's going to meet the needs of the project. Then once we have all of that in order and compare it to the original budget list, any further discrepancies beyond that that doesn't seem to make sense to a dollar amount, say they got a cheaper price on something than they budgeted for, we make sure that that's all squared up with all of the receipts. And then after everything is reconciled and the project is ready to be flagged as complete, we'll send all that to Judge Porch at the Department of Commerce so that if there is any funding remaining, the ARC program can request that back. In terms of the site visit that they mentioned, that is something that occurs currently at the end of the project. That is an in-person visit to the site to verify the equipment is installed, is performing appropriately and has speed tests that validate that they are achieving the targeted speeds they set out to build. Lastly, just to go through the FCC and other data on what the federal government sees us as having for broadband deployment, this is the broadband map at broadbandmap.fcc.gov. I pulled up a specific filter on it since the new definition of broadband is 100-100. The only filter they had that was similar was 110. It's kind of a difficult map to read, but the take-home point is that as of their data for all modalities -- this is cable, fiber, fixed wireless, satellite, and other -- achieving speeds greater than or equal to 110 as of December 2020, only 20.6 percent of the Arkansas population covered had no providers offering this speed. 42.49 percent had only one provider, 30.15 percent had two, and only 6.76 percent had three or more providers competing in this space. For the National Telecommunications and Information Administration, this is data that I presented at the Connectivity Summit. Broadband services in Arkansas on fixed broadband. On the left, we have the FCC Form 477, which is no provider reporting 25-3, which is, again, significantly slower than the current 100-100 standard. That's at the census block level. Red is bad in this circumstance. That is areas without coverage. That data is from early 2020. In the middle is an Okla median speed test below 25/3. That data is also from early 2020 at the census tract level. For those that are wondering what Okla is, if you've ever run speedtest.net, that is the speed test service that many people use to test their own internet connection. Particularly interesting to me, this is November 2019 data from Microsoft, was they push out software updates to Microsoft Operating System, which is the most common operating system used in probably the world, but certainly America. They monitor on their own servers what kind of speeds they're sending out to all of these locations. And to them, this is where 75% of the devices that connect to Microsoft updates are getting speeds below 25 megabit per second. So that is a very interesting real-world test of experienced internet speed. Lastly, because mobile is a growing part the conversation include some screenshots of this same FCC data set showing 4G coverage as of May 15th of this year for AT&T, T-Mobile, and Verizon in their respective company colors. With that, I'm happy to answer any questions, and thank you very much for your
▶ Play
Speaker 3 1:00:54
time. Thank you, sir. We have three in the queue. Senator Hammer. Thank
▶ Play
you, Mr. Chair. When you, all these projects like this $124 million we're being asked to approve, those all come by you for review for readiness? Is that correct? Yes, sir. Those would all have technical review by my team. And for those that are repeat vendors wanting more money, you heard the testimony a while ago by Judge Porch that there's consideration that if they are providing service somewhere else that is not satisfactory to those that are getting it. Do you review that or how does that weigh into your recommendation to them that they're shovel ready based on past performance or present performance in areas where they're providing service? Given that our review
▶ Play
is one of an extremely technical nature for feasibility within the project, I don't believe that we wait past performance in our recommendation. We look to Commerce to make that decision.
▶ Play
Speaker 3 1:01:55
All right, thank you. Thank you, Mr. Chair. Thanks, Senator
▶ Play
Hammer. Next is Representative Leiteman. Thank you, Mr. Chair, over here. I had a question about the IDHI grant you talked about on your first few slides there and you say you've awarded 20 grants, 30 are available and there's three-quarters of a million dollars still remaining. What entities received those grants? I mean, were those hospitals, were those providers, who would apply for those grants? Yes, sir. Thank
▶ Play
you for the question. Those grants are going to mostly cities and counties across the state of Arkansas. Okay.
▶ Play
So do they have to establish a need, I mean, what's the
▶ Play
primary purpose of that grant? The primary purpose of the grant is for these underserved communities, they don't have to be incorporated communities, but underserved groups of people to apply for future funding down the line for federal grants so that they can define exactly how underserved they are and quantify that so they can take that data and shoehorn it into an existing grant application to facilitate those. Mr. Chairman, could I have
▶ Play
Speaker 3 1:03:17
one more quick follow-up? You can get back in the queue. All right, thank you. We'll go
▶ Play
on to Representative Kavanaugh. Thank you, Mr. Chair. My question is, during the audit that you're doing on these projects, how many are not finishing the project as presented that we're giving the money for?
▶ Play
Speaker 121 1:03:40
I'm not aware of any that have completely not finished, but I don't have that information
▶ Play
immediately available so I would have to get with my team to make sure we have many in the final review stage so I can't say that there's not any at risk but I'm not aware of any at this time that have failed. Can you please get us that information? Yes ma'am.
▶ Play
And my real quick follow-up is how come we're only doing the audit at the time that the project is finished? Why don't we do it during the build out, so that if there is an issue, we catch it before it becomes a
▶ Play
real problem. So when you say audit, in this circumstance, are you speaking of specifically the site visit or the invoice auditing process? Both. So we do the invoice auditing process throughout. It's a monthly or quarterly process as they submit invoices to make sure they're on track in that regard. It varies a little bit because some invoices are net 30 and net 60, so they're not always turned in on a monthly basis. The site visit process is an expense, and in terms of keeping expenses down in the interest of the overall program budget, a final site visit to verify everything is in good working order was deemed to be appropriate at the time. Thank you. Yes, ma'am. Representative Meeks. Thank
▶ Play
you, Mr. Chair. Just a real quick question. The purpose of the ID program primarily is to help these entities draw down federal funds. Do you have any idea how much federal funds we've been able to leverage so far as part of this program?
▶ Play
It's a good question. I'm not aware of any independent federal funds, and I say independent deliberately because depending on how you treat CARES Act and other pass-through funds to the state, you could incorporate those yes, no, maybe.
▶ Play
Barring those, I'm talking like RDOF and USDA and all those, any ideas? Barring those, none have been disclosed to us
▶ Play
and they would have incentive to do so because there's a potential follow-on funding for organizations or groups that achieve federal funding. All right, thank you.
▶ Play
Senator English? Yes, thank you. So just to kind of follow up on Representative Meeks, I think a lot of people don't really, didn't remember that we did the rural ID with about two million dollars in it with the um and that was basically before all this federal money came up after covid started this was right before covid started so we had two million dollars which would help communities um have the expertise that they don't usually have to be able to do the engineering studies and all the things that are required when you're going to apply for a usda grant or a Department of Commerce grant or whatever but once that was established and we got those those funds and some of those projects started or those applications started then all of this other federal money came and I'm not sure that too many communities have applied have used those that that information to apply for other federal grants because this other state money was there so but I think that's that's something we've kind of all sort of forgotten in the in the rush of all this other federal money is that before all that money came along we did we had put together that program which would allow communities to be able to get their act together and and have the expertise to be able to apply for a federal grant so once this money is gone all this federal money maybe that but that money is still out there so communities could still do that. Use those resources. Thanks Senator
▶ Play
Speaker 3 1:07:32
English. Senator Hammer. Thank you. I think
▶ Play
this was Representative Cavanaugh that hit on this a minute ago. Of the $124 million that you've determined are shovel ready and the provider groups that are listed on there, have any of them or are any of them currently in a position that they have not completed their previous work satisfactory to what What was the contract terms going into that work they have now? So
▶ Play
that I'm understanding your question correctly, sir, are you asking is anyone applying for more money with a pending project not yet completed?
▶ Play
That is not satisfactory based on your final investigation or your final whatever. I'm not aware of that, but I can definitely
▶ Play
get back to you with specific information. Okay. I'd like to know that because I think that
▶ Play
would have some bearing as to whether or not me personally would want to vote to give them any more money if they're not in good satisfactory standing with you now for the work that they're doing and it's, you know, been completed, not completed as was originally agreed to.
▶ Play
Understood, sir. All right. Thank you. Representative Leiteman. Thank you, Mr. Chair. I had a follow-up question on my question earlier, the IDHI grants. It does have health, you know, it's digital health. So does there have to be a health connection to that, or is that just a general title? No, sir, that's a general title. So it doesn't have to be connected to a hospital, or it can just be a local county or city?
▶ Play
Speaker 3 1:09:12
Yes, sir, that's correct. All right, thank you. Thank you, sir. I see no more in the queue, and we need to, for time purposes, we need to move on. Thank you for your presentation. Next is the state broadband plan, Lou McAllister. If you would, whenever you get up there, Mr. McAllister, just introduce yourself and tell everybody who you're with.
▶ Play
Speaker 139 1:09:48
Thank you. Thank you. I'm Lou McAllister, CEO of Broadband Development Group and I appreciate the invitation to be here today. Looking forward to visiting with you about what we're doing. You're welcome to proceed. First of all, I'd like to thank many of the members here for their help in getting the project started off and I could go through several names and what they've done to help launch the project and help us get to the point where we are today. In particular, Senator Pitch has helped us in Sebastian County get a meeting scheduled. Senator English has been very active in attending meetings and working with us and sending us complaints from folks in her district who are needing help and looking for some assistance. Mr. Hammer has been very helpful in Saline County getting meetings scheduled and getting us in front of a lot of the folks down there and offering advice. We had the pleasure of being with Representative Meeks in Jonesboro at an economic development conference where we shared a panel. Representative Love in his capacity in Pulaski County was very helpful on some grant work that we did in studying some of the census tracts in Pulaski County, Representative Hodges and I have been speaking about going to northeast Arkansas into Blyville, Representative Ryan and I are scheduling some stuff in his area, Representative and I are talking about three census tracts in her area that we have studied and how to get service in there. Irvin has been particularly helpful in Stone County in her area in getting us introduced to folks. So we're very grateful for the help that we've had out of members of this body to get us introduced, to get the word out, and get us going out there. I was listening to Secretary Preston, and he talked about starting off with $4 million and how we're now at about $400 million with another $400 million in the pipeline. So I'm doing that math really quick and y'all can bear with me if I don't get the math exactly right. But that sounds like a 200 fold increase from 4 million to 800 million sounds like 200 times more. And it sounds like a lot of money and it is a lot of money. But I was thinking about what good internet access seemed like it was in 20 years ago, in 2000, 2001, when good internet access was a 56 kilobit per second dial-up modem and we thought that was pretty fast stuff. Today the minimum is absolute minimum, 25 megabits, that's a 400-fold increase and if we go to 100 by 100, which is what we're really talking about, that's a 2,000-fold increase. And we have folks all over the place that want and get gigabit per second internet service. That's a 20,000-time increase in 20 years. If we're thinking about the next 20 years, where are we going to be? What's it going to be like? That's what we're working on. That's what our plan is about, and that's why we are are working on this stuff. So we have done several things so far. We had to get ramped up in our first month so we have engaged with several statewide organizations including chambers, the State Library, the Associated Counties, the Municipal League, the AAEA, the Sheriff's Association, Forward Arkansas, Heartland Board. We're talking to the Black Mayors Association. We're trying to get the word out. Part of this has to do with identifying. Judge Porch was talking about communication and collaboration and cooperation. So we gave this a name. We've called this AR Broadband Now. This gives everybody a chance to identify with the program and with what we're trying to accomplish. It gives us all a common language to talk on. And that's where we've started with this. We have completed the staffing. We had to hire a few folks to help us out with some of the tasks. We have our logo designed. We have created social media awareness and presence with Facebook and Twitter and LinkedIn. And we have created the engineering timeline the engineering processes has begun and we've developed the outline for the master plan for what the the the final document will look like and and how that will go forward. I'd like to to talk about that a little bit more in that these are just ramp up organizing activities these are done these are behind us and we'll we'll move forward from this. So far, we have visited 19 counties. We've interviewed over 600 folks individually, and we have some amazing stories about what people have, what their experience is like, and some of the stories are pretty grim, frankly. If somebody has great Internet service at an affordable price from a provider that they love, there's no news there. That's easy data to find, and there's no news there. The hard data to find are the data where the stories are negative. What I think of as negative data. They don't have access. They don't have affordability. They don't have desire, frankly, in some cases, to even use the Internet. So that's what those interviews are about. Farm Bureau has been a great partner in this so far. We've had, this says 10, but there's hardly a day that goes by that we don't have a Farm Bureau meeting in some county, and they've been terrific partners in letting us be invited into their counties and speak to their members. We've reached out to probably now every representative and senator in the state asking for help in your districts, and we appreciate that. We are talking to county judges and to mayors. We're with the state library group. We've been interviewing businesses, educators, and again, it's to get stories. We were in a library in Dardanelle. Excuse me, it's hard for me to talk about this one exactly. We were in a library in Dardanelle, and a lady was in there on the internet searching for a job. She had lost her job. She has stage four cancer that she can't get treated and she was in the library on the internet because she had lost her internet service at home. She had signed up with a provider on a budget plan that she could afford, a $30 a month plan and about three months into having service, she got a bill for over $700 and she called to get a payment plan worked out and get some help, and by the time she got that done, the bill had grown to over $1,100. There's something about that that strikes me as not being quite right. There's a fairness issue and an equity issue there that seems to me to be way out of whack. What we're trying to do with our study what what I think we all have the opportunity in this room to do is create Accessibility for everybody adoptability and affordability and those those are the kind of the three the three keys for us The the analysis is very data Intensive it's gap analysis. We're looking for holes. We're looking for underserved Not served, but we're looking for gaps in affordability as well We studied one census tract where there seems to be a lot of accessibility, a lot of service. It seems to be a lot of speed. There seems to be maybe even competition. But one of the census blocks in that census tract had a median income of $23,000 and change, and the average price for good internet in that census tract was about $100 a month. I would suggest to you that that's not affordable. uh judge porch was talking about affordability a little while ago and um on a national basis affordability is generally pegged at between two and three percent of gross income in arkansas as we've been interviewing folks and asking about affordability it seems that for our state affordability is probably somewhere between one and one and one and a half percent a median income. Now, maybe, I don't know why that is exactly, but that would suggest in that one census block, that $23,000 a year median income, that affordability is in the $20 a month range, not the $100 a month range. The technical activities that we're involved in, we did engage a subcontractor called Altman Salon. They are a Boston-based global telecommunications consulting firm. I think the premier telecommunications consulting firm in the world. They give us the ability to scale quickly, and we wanted to do this study in six months to every single address in the state, and we needed more horsepower to do that. They have that horsepower. They are a great engineering firm and technical firm and data analysis firm, and that's who we're using. As we've gone around the state, we've interviewed 12 providers so far. I intend to interview all the providers, and so far we've gotten 12 of them. As soon as we walk in the room and start talking about what we're doing and why we're doing it they start pulling out their maps and rolling them out and showing us where they're doing work where they've asked for grants where they've been awarded what holes are left what needs are still left in their opinions and I think we're getting great support and great cooperation out of the provider companies we've created some databases for the engineering input and we've started an address-by-address statewide research plan so that we know that when somebody says, when a provider says an area is served, that's fine except that that doesn't tell you if a specific address in that area is served. And I'll give you an example. My mother lives in Hot Springs. If you look in her neighborhood, her neighborhood is served. But if you look at her address, it's not served her street is not served and it's a it's a nice neighborhood but it's not served so we're going address by address finding out what providers actually provide at an address and what they actually charge for it this is very labor-intensive and difficult process but we're that's what we're doing and we We have developed our high-level design timeline. So very quickly I will say that our project is on track. We've ramped up in our first month. We've gotten great input from a lot of folks and it's really from you all helping us out to providers helping us out to non-governmental organizations to people in the communities. It takes a lot of folks to do this and it's going really well in my opinion and I think we're going to be… we're on target to deliver the master plan, the strategy by early April as we've been asked to do. With that, I will stop
▶ Play
Speaker 145 1:23:23
talking and we can talk about questions. Thank you, sir. Senator
▶ Play
Speaker 110 1:23:29
Hammer. Thank you. A quick question and maybe
▶ Play
a little long one. How many surveys have you received back so far? Because that was, you know, part of the initial discussion on the boots on the ground was about getting surveys back.
▶ Play
Speaker 139 1:23:47
Yeah, we have a little over 400 in hand right now. We've sent out a few thousand and we have about 400 in hand and we get more every day. Okay. Follow-up, Mr. Chair, you want
▶ Play
me to go with the queue? Go ahead. So the feedback that you're getting, just like the example that you just shared and the cost that went up, and I'm thinking we're sitting here about to award $124 million is what we're being asked, and Mr. Porch around the corner there, are you communicating the results of your feedback to either UAMS or to Mr. Porch so as it might have a weighted factor in whether or not we're going to give more money to providers that currently are not satisfying their customer base as it is. And I realize the importance of getting all this stuff out there, but at the same time, if we get it all out there and then either people can't afford it or the service is not what it's supposed to be and we've helped enhance that poor service, that's what I want to know is where do we have a stopgap in there between awarding more money based on what you're collecting in your data
▶ Play
Speaker 146 1:25:01
and how is that being shared out? So, as Judge Porch said,
▶ Play
Speaker 139 1:25:06
he and I are in regular communication. I cannot say that, yes, I've done that exact thing the way you've described it, Senator Hammer, in your question. I think that, given your question, that's something we ought to do, and I will take that on to do that, report that to Judge Porch in real time. What we have found out is, so far, as we've talked to providers, every provider we talk to, from their perspective, is doing a great job. And, of course, right? But when we're in communities talking to their subscribers, to their customers, there might be a pretty big gap between what the provider thinks they're doing and what their customers think they're doing. So I think that we need to be very mindful of customer satisfaction reports or net promoter kinds of scores. And I think that's something we've got to make sure we're factoring in on awards. And I will take that on to report that to Judge Porch specifically. That'd be great because I want the money
▶ Play
to go to the providers that are taking care of the people where they ought to and not just anybody else that's just grabbing the money and running. Absolutely. I agree.
▶ Play
Speaker 3 1:26:32
Thank you. Thank you, Senator. Representative Innett.
▶ Play
Yes. Thank you, Mr. Chair. I have a question that might piggyback on what Senator just asked. Say, for instance, I have adequate broadband at my residence, but maybe two or three streets down or maybe another neighborhood that's in close proximity to me might receive it, not receive it is might not have a great broadband connection connection what are your um what do you plan on doing like quality control like making sure everybody has an equal or equality meaning has has a good broadband experience if i have a good one but my neighbor is not so so what are y'all going to do to make sure that it's is even all across the board One
▶ Play
Speaker 139 1:27:31
of the things that we're doing with the study is looking at all the various technologies that are available and what is it going to take to be quality service? What does that mean, right, in terms of speed and price and that sort of thing? But at the end of the day, we're not going to be the provider of that service. We're going to be the provider of a report. And I think this is a conversation that we've had informally with, you know, amongst people, amongst like Senator English and myself or Senator Hammer and myself or Secretary Walter and Secretary Hurst, where when we put grant money out there and we give it to a provider and services created, we need then to have a mechanism in place to track that quality, track that customer satisfaction, make sure that the delivery is there, and I think that was addressed by Secretary Preston and Judge Porch, and I think we've got to make sure that we double up our efforts on that to make sure that people really are getting what we said they're going to get, and if that's speed, if that's price, if that's quality, if that's responsiveness, reliability, all those things go into that, and I think we've got to make sure we have those mechanisms in place. Representative Hawks.
▶ Play
Thank you, Mr. Chair. Mr. McAllister, first of all, I want to say thank you for your testimony today. And you've truly shown that you love people through your testimony. And I want to say I appreciate that and your hard work that you're doing. And the question is, is how can we ensure competition, you know, for lower prices? How can we see that happen? That's a really interesting question, and
▶ Play
Speaker 139 1:29:29
I think it can be a tricky question as well. Right now, our policy is that we give one grant in one place to get one thing done. We don't want to duplicate spending. We don't want to be wasteful, right? We want to be good stewards and spend wisely and well, and everybody agrees with that. the the sort of necessary end result of spending one time is often that we've created a monopoly there so we don't so by definition we don't have competition there may be a mechanism uh where we can revisit that policy or revisit that idea about how we make grants and how we look forward to an area where we can perhaps create competition because we we need to do sort of in my opinion we need we and i say we because it's it's all of us but ultimately it comes down to decision makers and policy policymakers really are we going to create monopolies and then try to come up with some sort of oversight scheme that manages that sort of stuff so that we get the right quality at the right price, or are we going to foster a competitive landscape where then they become sort of self-regulating through competition, right? And I don't have an exact answer to that today, but I do think that there's a path for it, but I
▶ Play
Speaker 3 1:31:09
don't have the answer today. Thank you, sir. We have no one else in the queue, and we have one more presenter, and that is Philip Powell with the Farm Bureau Connectivity Summit and Direction. Just introduce yourself. I don't think you have a PowerPoint or anything. You're just going
▶ Play
Speaker 156 1:31:38
to... Okay. You're welcome. I'll try to
▶ Play
Speaker 157 1:31:40
keep this short and it's lunchtime. I'm Philip Powell with Arkansas Farm Bureau. I'm the Assistant Director for Local Affairs and Rural Development with our Public Affairs and Government Relations team. First off, chairs and committee, thank you for having me here today to talk about this. I will in the Public Affairs and Government Relations Department is to advocate on behalf of the 190,000 members we have in Arkansas Farm Bureau. And we advocate for them on the issues they say are important to them in broadband. It's one of those issues. This is a copy of our policy handbook that we work off of. And when it comes to broadband, our members say they want affordable and reliable high-speed internet access throughout the state. So with the support of our members, the state legislature and government, Arkansas Farm Bureau organized and hosted the Arkansas Connectivity Summit that was held in High Springs on September 8th. And many of you attended that. And the goal of the summit was to bring together stakeholders in the public and private sector to address the lack of connectivity in Arkansas and how to help the state address this issue. Over 250 people attended this, and we had over 30 vendors and sponsors that supported this event. We invited many officials, such as Federal Communications Commission. Commissioner Brendan Carr came down from D.C. Governor Asa Hutchinson spoke. Representative Congressman Frenchill also came and spoke at this. Commissioner Carr spoke of the challenges with broadband deployment on the national level. He especially spoke of workforce and supply chain issues. And I know that Senator English and Hammer have been working on workforce development with that. We also had Dr. Joseph Sanford, who spoke earlier, talk about the impact of broadband on health care. We had Amber Gregory from the state libraries talk about how it didn't pass the libraries. And so this was just a way for us to showcase or highlight the gaps and how it affects everyone in Arkansas. And we also had the, we invited the Senate and House Committees on Agriculture and Education to hold a joint meeting in which Judge Porch gave an update on the broadband office. Commissioner Brandon Presley from the Mississippi Public Service Commission in Missouri State Representative Lewis Riggs Also gave insight on how their states have addressed this issue respectively We believe the summit was successful in bringing together these groups who are now working together to better broadband access in this state The future direction of Arkansas Farm Bureau in broadband is to be supportive of the state's plan to hire a consultant to create a master plan to outline how the state can best address this issue. The need of a master plan is necessary in outlining the gaps in broadband coverage as it relates to mapping and service provided. The boost on the ground approach that the broadband development group has taken will allow for more accurate feedback. When I've talked to other state farm bureaus about this, such as in Missouri and Iowa they have taken a similar approach and said that the county level engagement was the best way to Approach the broadband issue And in the timing of this plan cannot be better with the passage of the infrastructure bill and will put Arkansas in a better position As it relates to federal funding opportunities Farm Bureau has offered us help in organizing meetings on the county level and as of today Our offices and members have hosted the Barban Development Group in 15 separate county meetings. Our members have appreciated having their voices heard by the group and are very supportive of these meetings, especially in the rural parts of the state. We will continue to offer our assistance and resources to the Barban Development Group in their Barban Development Group in their booths-on-the-ground approach. We will also continue to help in any way we can to support the state legislature, Department of Commerce, and the governor in connecting every Arkansan to high-speed, reliable, affordable internet. And that's all I have. I'm happy to take any questions you
▶ Play
Speaker 3 1:36:20
might have. Thank you. I appreciate your efforts. I see no one in the queue. Really, Representative Meeks and I have talked about this together and the possibility of having providers and going around the state with this committee and getting our committee to ask questions of providers and get updates. I think if there's no opposition to that with a joint committee, we may proceed with that after the holidays and try to get feedback, you know, from those providers in the communities that think they're really doing a good job. And we'll compare that to what we come up with our master plan and see what he has, you know, and see how those coincide. So I appreciate the Farm Bureau's efforts in this, and I appreciate all the members. I think everybody wants to get to lunch, So don't forget, there's some young folks out there. I know there's some folks in here that like to be in front of the camera a lot more than I do. They would appreciate our support in that. Thank you, sir, and thank you, members, and we are adjourned. Yeah. Thank you.
▶ Play
Unknown speaker 1:38:24
Thank you. Thank you. Thank you. Thank you. Thank you.
▶ Play

Agenda

A. Call to Order

B. Comments by Chairs

C. Consideration to Adopt September 14, 2020, Meeting Minutes [EXHIBIT C]

D. Consideration to Adopt Motion Authorizing Chairs to Approve Special Expenses Incurred by the Committee

E. Presentation on Broadband Development and Accessibility [EXHIBITS E-E1] – Mike Preston, Secretary of Commerce

F. Presentation on Arkansas Rural ID Program [EXHIBIT F] – Dr. Joseph Stanford, Director of Institute for Digital Health and Innovation, University of Arkansas for Medical Sciences

G. Presentation on State Broadband Plan [EXHIBIT G] – Lou McAlister, CEO, Broadband Development Group, LLC

H. Presentation on Farm Bureau Connectivity Summit and Company Direction – Phillip Powell, Assistant Director of Public Affairs, Arkansas Farm Bureau

I. Other Business

J. Adjournment

Speakers

Speaker 3
29 segments
Senator Jane English Unverified
6 segments
Speaker 23
32 segments
Speaker 19
40 segments
Speaker 37
1 segment
Speaker 45
1 segment
Frederick Love Unverified
6 segments
Senator Kim Hammer Unverified
18 segments
Speaker 62
1 segment
Senator Ricky Hill Unverified
5 segments
Representative Frances Cavenaugh Unverified
5 segments
Representative Johnny Rye Unverified
4 segments
Speaker 89
6 segments
Representative Spencer Hawks Unverified
3 segments
Joseph Sanford Unverified
34 segments
Representative Jack Ladyman Unverified
4 segments
Speaker 121
1 segment
Representative Stephen Meeks Unverified
2 segments
Speaker 139
37 segments
Speaker 145
1 segment
Speaker 110
1 segment
Speaker 146
1 segment
Representative Denise Jones Ennett Unverified
2 segments
Speaker 156
1 segment
Speaker 157
9 segments