ALC-Highway Commission Review and Advisory Subcommittee

September 16, 2020 ·1:30 PM ·Room A, MAC ·2:42:21
Video Transcript 8 documents

Summary

Machine transcript

May contain errors. Verify important quotations against the official video.

About transcript accuracy
Source
Whisper
Model
ggml-large-v3-turbo.bin RTX5060
Processing date
October 18, 2026

D. Procurement Recommendation No. 6: Implement construction contractor performance measurement (Recommendations Report, pp. 31-33) 42:17

The department’s Director (Speaker 11) presented Recommendation 6, explaining that the current pre-qualification and bonding processes do not reliably screen for construction quality, citing FHWA and NCHRP studies, and outlined a four-step, phased roadmap for a contractor-performance measurement program. [42:24] [42:59] [43:34] [44:10] [44:46] [45:20] [45:50] [46:23] [46:59] [47:29] [48:01] [48:33] [49:04] [49:37] [50:10] [50:47] [51:17] [51:51] [52:27]

Committee members, led by Senator Dismang, sought clarification on the underlying data-questioning how many DOTs were surveyed, which states had adopted similar practices, and whether a performance-based pre-qualification guarantees higher quality-and were told the studies covered 52 DOTs, identified six states (FL, MI, OK, UT, VA, WA), and that no explicit quality guarantee exists. [52:56] [53:00] [53:32] [53:52] [54:06] [54:16] [54:18] [54:24] [54:40] [55:05] [55:15] [55:53] [56:08] [56:12] [56:25] [56:59] [57:05] [57:21] [57:34] [57:40] [57:59] [58:12] [58:36] [58:45] [59:01] [59:17]

The Director explained that RDOT already uses an administrative pre-qualification system with liquidated-damages restrictions and argued that adding a performance-based rating would require substantial new staffing, risk subjectivity, and entail significant implementation costs; Senators expressed mixed views, with Dismang favoring a non-punitive informational grading system and others (e.g., Senator Hendren) seeing accountability benefits, prompting the Director to propose limited stakeholder consultations and caution against using any rating to limit bidding eligibility. [1:03:42] [1:04:14] [1:04:46] [1:05:17] [1:05:51] [1:06:25] [1:06:55] [1:07:28] [1:07:59] [1:08:31] [1:09:02] [1:09:34] [1:10:07] [1:10:43] [1:11:14] [1:11:48] [1:12:18] [1:12:54] [1:13:29] [1:19:43] [1:20:03] [1:20:34] [1:21:05] [1:21:36] [1:22:08] [1:22:39] [1:23:12] [1:23:35] [1:23:49] [1:24:13] [1:24:21] [1:24:54] [1:25:09] [1:25:19] [1:25:27] [1:25:56] [1:25:59] [1:26:30] [1:27:05] [1:27:42] [1:27:49] [1:28:07] [1:28:16] [1:28:25] [1:28:51] [1:29:21] [1:29:53] [1:30:25] [1:30:31] [1:30:54] [1:30:57] [1:31:12] [1:31:30] [1:31:36] [1:32:02] [1:32:07] [1:32:17] [1:32:27] [1:32:36] [1:33:06] [1:33:18]

After testimony from DOT representatives describing current low-bid limits and potential performance criteria (on-time, on-budget, safety, managerial ability) and public commenters questioning feasibility, subjectivity, and competitive impact, the chair concluded that the committee will adopt a limited grading approach by proceeding with the first three roadmap items, deferring broader implementation and moving to the next recommendation. [1:33:42] [1:34:13] [1:34:46] [1:34:58] [1:35:19] [1:35:52] [1:36:12] [1:36:29] [1:36:38] [1:36:46] [1:36:51] [1:36:58] [1:37:04] [1:37:12] [1:37:31] [1:37:36] [1:37:55] [1:38:01] [1:38:09] [1:38:32] [1:38:39] [1:42:29] [1:42:43] [1:48:07] [1:48:39] [1:49:13] [1:49:48] [1:50:19] [1:50:53] [1:51:24] [1:51:54] [1:52:00] [1:52:25] [1:52:39] [1:52:55] [1:53:26] [1:53:57] [1:54:29] [1:55:05] [1:55:39] [1:57:18] [1:57:51] [1:58:24] [1:58:57] [1:59:15] [1:59:36] [1:59:47] [2:00:07] [2:00:40] [2:01:11] [2:01:45] [2:02:15] [2:02:49]

E. Information Technology Recommendation No. 9: Build an IT Governance Structure to guide ArDOT's IT Investments (Recommendations Report, pp. 46-48) 2:03:07

The chair asked whether the committee should review each recommendation individually or discuss all three together and the members agreed to cover all three before taking questions. [2:03:19] [2:03:23] [2:03:31] [2:03:37] [2:03:40] [2:03:45]

Speaker 11 presented the findings for Recommendation 9, noting that RDOT lacked an IT-governance structure and enterprise-architecture blueprint despite a 155 % increase in IT spending and that responsibility for IT platforms was siloed across divisions. [2:03:56] [2:04:34] [2:05:09] [2:05:41]

Speaker 7 then explained why establishing an IT-governance structure is critical, describing expected benefits such as improved capacity and risk management, citing common frameworks (COBIT, ITIL) and outlining a three-phase roadmap of groundwork, governance establishment, and roadmap execution. [2:10:04] [2:10:39] [2:11:10] [2:11:44] [2:12:16] [2:12:47] [2:13:23] [2:13:55] [2:14:30]

F. Information Technology Recommendations No. 10: Implement mid-term IT initiatives that can optimize business operations (Recommendations Report, pp. 49-52) 2:17:22

Speaker 7 introduced Recommendation 10, arguing that a mid-term IT rationalization effort could generate roughly 20 % annual cost savings-about $1 million on the 2019 $5.3 million IT spend-by inventorying and consolidating applications and databases. [2:17:49] [2:18:21] [2:18:53]

He detailed the anticipated risk reductions, including lower licensing exposure and improved security, and emphasized the need for an upfront tool to support the inventory and classification process. [2:19:26] [2:20:01] [2:20:32] [2:21:03] [2:21:39]

The proposed implementation roadmap was broken into three steps: building a comprehensive inventory, assessing each asset against risk, cost and redundancy criteria, and developing a target state with decisions to retain, re-engineer, migrate or retire each item. [2:22:50] [2:23:23] [2:23:58] [2:24:33] [2:25:04] [2:25:36]

No formal vote was taken, but the presenter noted that RDOT has already engaged a consultant to begin the inventory and classification work. [2:21:03] [2:21:39] [2:22:13]

G. Information Technology Recommendation No. 11: Develop necessary pillars to establish IT as an effective business partner (Recommendations Report, pp. 53-55) 2:26:55

The committee did not vote on the recommendation but the director later affirmed that the agency will continue work on Recommendations 9, 10 and 11 as outlined in the discussion. [2:36:01] [2:36:10] [2:36:43]

Speaker 7 outlined Recommendation 11, focusing on establishing formal IT project-management and service-management frameworks (e.g., ITIL) to improve incident response, disaster recovery, and overall customer satisfaction, citing potential cost-savings of up to 42 % for the agency. [2:27:19] [2:27:51] [2:28:27] [2:28:58] [2:29:36]

He described three implementation pillars: defining baseline standards and policies, selecting appropriate tools, and creating a long-term ITSM roadmap that includes a service catalog, request-tracking, and training for staff and stakeholders. [2:31:15] [2:31:46] [2:32:19] [2:32:50] [2:33:20] [2:33:55] [2:34:30]

The discussion highlighted the need for a service catalog with clear turnaround times and performance metrics, and suggested leveraging existing public-sector resources such as Texas DIR’s PM Lite and ITIL guidance. [2:35:06] [2:35:36] [2:35:56]

The chair thanked the presenters and the director confirmed that the agency will continue efforts to implement the governance structure, inventory applications, and the new IT service-management system as part of Recommendations 9-11. [2:36:01] [2:36:10] [2:36:43]

H. Other Business 2:37:39

Chair Senator Dismang opened a discussion on the need for a formal public-comment process and a broader forum to gather input from municipalities, county judges, contractors and other stakeholders on how the recommendations should be implemented. [2:37:48] [2:38:21] [2:38:53] [2:39:23] [2:39:56]

He noted that the committee lacks a quorum to take formal action on the recommendations at this time, but emphasized that establishing inclusive procedures for public involvement is a priority before moving forward. [2:40:20] [2:40:26] [2:40:59] [2:41:31]

Committee members agreed to continue the conversation in future meetings and to coordinate with the department and commissioners to develop a mechanism for public feedback on dashboards, call-center designs and other deliverables. [2:41:35] [2:41:38]

Official video page ↗

Transcript

Transcript available Whisper ✓ SliQ live captions ✓ Download .txt
Machine transcript

May contain errors. Verify important quotations against the official video.

About transcript accuracy
Source
Whisper
Model
ggml-large-v3-turbo.bin RTX5060
Processing date
October 18, 2026
Unknown speaker 0:00
. Thank you. . . Thank you. . Thank you. Thank you. . Thank you.
▶ Play
Hey, members, I know we had a meeting that went long a little bit ago, so we may be waiting on some folks to be able to make it in today, but we do have some folks that are waiting to get started outside this room, and so what I'd like to do is we will move over, Chair sees a quorum, but we will pass over any of the items that require action, and we'll just get into the presentation portion of today and then again as a time kind of rolls along we will have some more members be present. So with that I'm going to go ahead and move to item C on the agenda and we'll start things off with procurement recommendation number five. Can you all hear us on the
▶ Play
Speaker 7 5:51
zoom call? and thank you hi members chairs this is aaron hutchins i am a director with state local government with side house uh thanks again for having us with you this afternoon virtually today uh to review the recommendations report with respect to procurement and i.t Hi, I'm Sagar Gokhale. Good afternoon,
▶ Play
Speaker 11 6:18
everybody. Thanks again for having us virtually. I'm a manager of state and local practice at GuideHouse. We
▶ Play
Speaker 7 6:32
won't belabor the agenda too long as no, we've prepared a series of recommendations related to procurement and IT. We'll cover the procurement recommendations, and I believe we'll use the same process we have previously. For a director or tutor, we'll respond to those, and then we'll review the IT recommendations and have an opportunity for that response as well as any questions. We did provide the appendix for you, just again for some additional background related to impact, et cetera, for your reference.
▶ Play
Speaker 11 7:08
All right. With that, I can get started. As Aaron mentioned, I'm going to talk through the procurement recommendations. And as we've done in our previous meetings, we'll talk about each one separately and turn it over. And then as we get into IT, I will turn it over to Aaron to discuss those specific recommendations. And in procurement, we have two recommendations, five and recommendation six we can start with recommendation five which is around implementing specific efficiencies as it relates to procurement and purchasing we wanted to ground ourselves first in some of the key findings and supporting evidence before we discuss the recommendation so there were five key findings here pr 1.2 which was that low bid procurement is viewed by staff as a cultural and financial necessity pr 4.1 which is that rdot does take advantage of legislation that allows consideration of qualifications in some forms of procurement. And PR 4.2, which is that, you know, alternative contracting methods, specifically as it relates to construction, have allowed RDOT to influence contractor behavior. PR 5.1, which is that RDOT is not using data to understand procurement trends and identify efficient practices. And that's not to say that they aren't monitoring and tracking that data, not using that in the data in this specific way. and then PR 5.2 which is the equipment and procurement division has minimal authority to facilitate the implementation of any efficient procurement practices that are surfaced through an identification of some you know potential efficiencies when taking a look at some of this purchasing trend analysis so in terms of the supporting evidence you know we know and at least We noticed that RDOT between 2014 and 2019 has levied about $20 million in disincentives and item deductions as it relates to construction projects, but also has awarded $44 million in incentives. That being said, the department doesn't necessarily have formal protocols to standardize decision making process around the use of these specific strategies as it relates to incentives, disincentives, as it relates to a a plus c bidding as it relates to lane rentals so on and so forth and and then third um as it relates to uh procurement uh the department spends on average about 24.4 million dollars um on small order purchases and then about 12.7 million dollars on competitive bid purchases uh small order purchases being uh under 20 000 and competitive bid purchases being between 20 000 and 75 000 and they spend that that average amount per year that being said as i mentioned uh before in terms of those key findings the department unfortunately doesn't have any formalized policy to identify some purchasing trends um and establish uh some you know specific efficiencies like terms supply contracts to maybe yield savings across the entire uh entire department and again it's not that they're not monitoring and tracking that information it's just that at least at the time of our review we're not looking at that data to identify some procurement efficiencies talk about the findings for recommendation six when we get there but moving on to the actual recommendation itself and this recommendation is related to implementing you know specific efficiencies as it relates to certain procurement uh and purchasing um processes so the department itself you know prioritizes uh cost savings um but it does lack the data to demonstrate what works and when and so if they take a look at you know potentially optimizing and standardizing some of the procurement and purchasing procedures that they already have in place uh they may be able to more effectively use some of the resources and maximize some cost savings and that includes within you know construction but also outside of of that in terms of some anticipated impacts by implementing some of these uh these recommendations uh that we're identifying here uh there's a couple directional um you know essential cost savings from an anticipated impact standpoint so uh from a construction standpoint uh if the department uh you know has a more formal process to understand and take a look at some of their uh change order policies and the impacts of some of those change order policies they potentially could save some money so as an example uh tech stop changed its change order policy where they publicly communicated um that they were going to budget less money uh to fund change orders and as a result of that they saw um some savings between four and five percent from before they implemented that policy to after uh implementing that policy and when and so you know kind of splitting the difference a little bit again because of directional savings um if r dot was was to implement a similar type of process uh you know process and and the same sort of conditions applied and they say about three and a half percent knowing that r dot spends on average about uh 40 million dollars on change orders applying that three and a half percent there could potentially save them 1.4 million dollars and that's an example of using some of the change order data along with some of their change order policies and some of their strategies around you know different procurement and contracting methods could potentially save them some money by harnessing the data that they already have also as it takes as it relates to some of their procurement and purchasing policies if again they were to take a look at their their small order purchases for example their competitive bid purchases and try to conduct a spend analysis and identify some potential trends and areas for savings across the entire department they potentially could save you know again according to some industry research somewhere between five and twenty percent by conducting that spend analysis and that five to twenty percent when applied to the 24.4 million annual average in small order purchases and 12.7 million in competitive bid purchases can yield somewhere between 1.8 to 7.1 million dollars i think the implementation of that new oracle platform that we've talked about i think a fair amount up until this point will help facilitate that and that's actually one of the considerations that i wanted to talk about in terms of using that that new oracle platform to help facilitate not only the collection but then the utilization of that data to identify some specific efficiencies as it relates to purchasing and procurement that being said another consideration is that staff capacity and expertise may need to be developed you know you can have the platform you can have the data but you know the folks on staff also need the the capacity and expertise to actually conduct that analysis and that being said even if they are able to identify some of those efficiencies and trends there may need to be some realignment and responsibility between the district offices and also the division to help shift some of the culture around purchasing to deliver you know the best value and sort of the and implement some of the more efficient practices to yield cost savings across the entire department we'll talk about the implementation summary in a little bit more detail but just one in in the next slide but one other call out a couple leading practices one you know down at the bottom the transportation construction management working group um you know has provided some guidance in the form of this guidebook around frameworks to select you know optimal methods for um for different uh you know contracting uh strategies as it relates to construction projects to ensure that you know if you're using things like lane rentals incentives disincentives uh a plus c bidding uh liquidated damages you know things of that nature uh when you're looking to um you know let um your construction projects and ultimately award that project to a contractor to be able to then you know strategically approach that collect the necessary data and then evaluate which methods yield sort of the best um the best value for the department and and so the you know that that guidance does exist and then again as i refer to this in the anticipated impact there is some existing research about you know potential cost savings uh that might occur um by taking uh sort of a spend analysis approach to procurements and purchases across the entire department in terms of the roadmap there's there's four uh major steps here the first one is creating the data set so it's really first when you before you even start to create the data sets it's really trying to understand okay what are you what are you trying to focus on as it relates to you know this particular recommendation and implementing some efficiencies so some potential focus areas here are taking a look at their procurement spend taking a look at the equipment ownership cost the life cycle cost looking at change orders as a result of construction projects or in relation to the construction projects to find some ways to optimize you know that process and that spend and then also taking a look at some of the alternative procurement and purchasing strategies as it relates to those construction projects and then identify the data that you actually want to to collect so what's the spend look like by district category season taking a look at the total amount and that's related to you know those those smaller purchases and and competitive bid purchases from an equipment standpoint looking at the lifetime cost of the purchase when you consider repair from a change order perspective it could be taking a look at you know the specific project the vendor the type of project so on and so forth and then in terms of alternative procurement and purchase strategies you know identifying each of the the specific strategies you know very explicitly uh identifying the cost any return on investment uh impacts the schedule impacts the safety so on and so forth and then you know really making sure that there you have the right people in place with the right roles to collect that data on a frequency that makes sense and once you have that information then you can start to assess some of the trends and there's a number here so you know supply trends demand trends the extent that you're using term contracts or collectively bargained agreements changes in commodity prices uh cost estimates in comparison to bids you know project delivery method effectiveness so on and so forth and then you're trying to understand you know what are the conditions in which you know these practices are really going to yield results when you do that then you can start to actually formalize that and develop policies and procedures that you can implement across the department where it makes sense so creating that decision matrix for when certain you know alternative procurement and purchasing strategies are used and then also ensuring that you have the right roles and authority across the divisions uh to ensure that you know even when you identify those efficiencies uh that you have the organizational structure to to execute on them and and then from that standpoint it it really you know bleeds into some change management activities and implementation activities to actually roll out um these new policies and procedures and then in that last step as it relates to monitoring and re-evaluating uh you know it's you know the this type of recommendation is is one that that sort of lends itself to this continuous improvement uh sort of approach so you want to continue to use this data that you're collecting to evaluate your policies and procedures as as you move forward determine if there's any revisions and then you know actually consider whether you want to use some of this data to be included in a broader uh key performance indicator uh monitoring and evaluation um uh dashboard uh if you will so an example of that is maybe potentially taking a look at change order volume from a broader department-wide set of kpis and we talked about those performance indicators i think in a in a previous meeting so with that i'm going to pause and turn it over
▶ Play
Speaker 1 19:28
Thank you. So at this point I think we're ready for Director
▶ Play
Tudor. If you could just go ahead and recognize yourself for the committee and you're recognized to respond to the recommendations.
▶ Play
Speaker 47 19:59
Okay, thank you. I'm Lori Tudor, the director of the Arkansas Department of Transportation. And my response today, of course, you've got that in front of you, I suppose, and I'm not going to read through that. But I am going to focus a little bit on the, what we've been working on is our Oracle Fusion procurement cloud service application and this is going to we're very excited about this new application this is a I think it's a five-year rollout in the first phase or it's a five-phase rollout I'm sorry and the first phase of it is due this fall sometime and it's going to help with all these things that Guide House recognized is needing some improvement at the department as far as procurement of products and services it will modernize our data collection it will allow us to do date you know right now we do have all the data but it's on the mainframe it's hard to mine it's hard to use for trend analysis and those types of things to set policies and see how to exactly use our debt you know how to how to craft some different policies to take better I don't I don't know the word I'm trying to think of but just to try to do better at evaluating our data and setting policies so that we can save money with our procurement practices we will be able to evaluate bidding trends how to improve we'll be able to implement data-driven approaches like spend analysis and life cycle costing to inform procurement and purchasing decisions and we will be better able to create policies and procedures at the district level that are consistent across the state the first phase of this application is actually scheduled to be implemented this this next month so we agree with their with guide houses recommendation on this one will continue the efforts that we're already in the middle of will continue progress we may need to get when it comes when we finally get this up and running and we get some data to start using we may need to hire additional personnel and possibly the services of a consultant to set up these trend analysis and things like that to help our staff to learn how to do this better. And of course, as always, the plan is contingent upon funding and the positions that the legislature allows us to have in the appropriations process. Do you, is anyone have, I'll just stop right there because that's the meat of what I have, but if you have anything else you'd like to say or ask me questions, I can, I can address that. Thank you, Director. One question
▶ Play
I had was on the, So, I mean, I think it's great that the software is coming online. You mentioned funding from the legislature, but that's already taken care of. You guys have already set aside what you need for the Oracle software, which is going to be utilized to create this trend analysis and the spend analysis and that sort of
▶ Play
Speaker 47 23:14
thing, right? Yes, sir. We have already, the commission has already approved by minute order the cost, and it's in our budget to pay for
▶ Play
this Oracle. All right, very good. And then so my question was on the, so the 20,000, the non-construction bids that are less than 20,000 small of the small orders. Is that going to then flow through this same system to be able to be recognized, looked at, and understand what may be the purchasing differences between the different districts for products, that sort of thing? or how do you envision that working with the $20,000, the small purchase orders?
▶ Play
Speaker 47 23:54
It will all go into this new system, and the data will be mined, and it will be used to look at exactly what you're talking about to see if there's discrepancies, if there's ways to save money, if there's policies we need to put in place to stretch our dollars. It will do all that for us. And
▶ Play
so will that allow for bulk purchasing? That way you could then take whatever the material is, the product is, disseminated amongst the districts so if everybody's buying gravel for instance and everybody's buying whatever i mean you know the the value of your dollar may be more buying in bulk and then disseminate will that allow that to occur
▶ Play
Speaker 47 24:33
well it will allow it but we're already doing that we already do that we buy on a supply contract that can be used for you know all year long by different districts usually it's regional you know in specific you know where it's regionally conducive to use it but yeah we've we already do that somewhat but this will help us do it even
▶ Play
more and that's part of the 20 they do that with so some of those purchases of 20 000 are for products that have already had a contract kind of or an agreed to amount then is what you're saying yes and so each one of the districts are they may be spending under the 20 000 and be part of this number but it's they're buying from a larger
▶ Play
Speaker 47 25:17
agreement that was achieved by the department yes a lot of times we have a supply contract and they buy from that i hope i'm answering your question correctly i do have our equipment and procurement officer here today if if um
▶ Play
let me ask you if i'm saying the head nod's great i don't know who i'm looking for is that essentially what happens on the yeah okay all right thank you all right and the head nod for that was a yes and then the alternative alternative delivery office said it
▶ Play
Speaker 47 25:48
was new is that all what what does that consist of oh okay i'm pretty proud of our new alternative delivery office you know we've been given the authority through legislation to do design build and construction manager general contractor work and that's that's different a different way of um of getting a project, a delivery method, other than design, bid, build. And so we set up an office because it's so much different than design, bid, build. And it requires so much more, you know, the contract that you write, the specifications you write, the way you procure that delivery method, it's all different. So we needed people that were able to be experts in those new delivery methods. we've sent them you know to other states that are already using these methods to be trained and we've brought in consultants and we've done that and we're in our infancy we've got I think right now we have four people in the office and we we plan to add more as we do more and more projects but that way we know it's just it's really hard to get your feet to get off the ground with something like this but we're well on our way we've got two projects already under contract so yeah we're doing good all
▶ Play
right thank you C 88 I'm not sure who that is yet Senator Stubblefield you recognize thank you mr. chairman I have
▶ Play
just a few questions thank you for being here Secretary Tudor thank you could you could you give me just a brief definition or explain the construction management
▶ Play
Speaker 47 27:27
general contractor method of procurement sure you go out for letters of interest, and then requests for qualifications, and you look, you know, you figure out what the project is, and then you get a contractor on board based on their prior experience and all of the things that go into pre-qualification as far as qualification-based, okay? And so you get the contractor on board, and then you get a, what you call an independent cost estimator who comes on board they're also they're a consultant and then you get with this with the contractor that you get under contract and you sit at the table together and it's usually at the beginning of a design of the design and you work through the design with the contractor and it's really a collaborative process because what happens is our designers are designing this project and the one we did is on highway 10 is this
▶ Play
Speaker 81 28:23
is this after you've already chosen the contractor
▶ Play
Speaker 47 28:30
we choose them to go based on their presentation that they present yes they're well their their documentation that they present all of the everything that they give us and then they come in
▶ Play
and they give a verbal presentation as well would this would this process not be advantageous for a company like Kiewit who has a lot of money to put on a very elaborate presentation which eliminates which is an out of state company and it eliminates any local Arkansas companies from even being in the game
▶ Play
Speaker 47 29:01
you're exactly right and I had this question asked me the other day and I said well you're right Kiewit did have an advantage this time because they've done this multiple times and they know the process we have never done it and if we had used an arkansas contractor and we didn't know how to do it and they didn't know how to do it that wouldn't be a good combination so yes kiewit kiewit did have an you know an advantage because they had experience but we've already talked to the agc and our contractors our local arkansas contractors And our next projects are going to be smaller, and we're going to try to bring them into and learn how to do this. But we had to learn on our own first before we could bring in a contractor that had never done it before. So a company
▶ Play
like McGeorge doesn't have the expertise to do some of these without you bringing them in and educating them?
▶ Play
Speaker 47 29:58
My understanding, and I've got, I'll ask Joey Deans here from Arkansas General Contractors today. but no sir there was no Arkansas contractors that had experience in general manager general contract construction manager general contractor method of bidding who has the contract on Cantrell Road do you know is that project on time yes sir it just got
▶ Play
started is it not over budget not yet I have one more question Mr. Chairman Does RDOT not have the capability of doing the jobs that we hire Garver to do with all of RDOT's engineers and all their expertise? Why do we pay a company like Garver to do these things that RDOT should have the capability of doing? Are
▶ Play
Speaker 47 30:58
you referring to the Connecting Arkansas program? Yes. Okay. That's an easy answer. When the half-cent sales tax passed in 2012, it was a temporary tax. And we knew we didn't have the staffing levels to implement that program. And if we had two options, we could hire more people or we could get this done by consultants. We made the promise early on that this money would go back into the economy. And there was no reason for us to grow state government, hire extra people so we could deliver this program when it was temporary. And it has been an excellent decision because we haven't hired additional people. And Garver has done a good job. We have three projects left. I'm not saying they haven't done a good job. Well, do you understand what I'm saying? that it would have not been a good use of taxpayer money if we'd have gone out and hired additional folks so that we could have, we had all the work we needed or all the work we could do based on our current funding levels. With the half-cent sales tax, we hired Garver so that we could deliver that program and not hire additional folks.
▶ Play
If the half-cent sales tax fails in november how will that affect the i-30 crossing and the i-40 and i-30 north interchange that they
▶ Play
won't get done okay that's all i have
▶ Play
mr chairman thank you uh senator rice you're recognized something that since the last meeting when i got a education or it finally just registered on the figures uh if you can refresh me that guide house gave was texas a six billion dollar program i think
▶ Play
Speaker 47 32:50
california is six and texas is 5.5 okay
▶ Play
i remember there was two and arkansas is what we're
▶ Play
Speaker 47 32:59
right now our federal and state construction program is 440 million dollars a year that's not counting the connecting arkansas program
▶ Play
okay and in the presentations we've had which give a lot of information and realize that as in today's where it says applying policy similar to texas transportation department that change order policy you know could save this much or whatever and i've just been wondering in my mind with that much discrepancy of a size program you've got one one big model here and you've got a smaller model here and and i think it was mentioned last time there's no reason we can't all strive for excellence that's what we're wanting more efficiency excellence you know but can and and this uh guide house is welcome to answer this uh later too do you feel director are these percentages realistic when you're talking about two programs because i just know when you've got a uh multi-billion dollar program versus what we have there there are the dynamics just change and sometimes we we can look at numbers and you make numbers do what you want them to do and you've got to do something to look at i realize that but right is that something that that y'all see
▶ Play
Speaker 47 34:34
a concern with trying to be accurate well my question is okay so when i read this what texas did was they said we have we're limiting the amount of change orders out in the field so what did that mean we'd have to look at what that exactly means i don't know what that means what what was it before they started limiting it i mean i don't know how to apply this without really without calling texas seeing what they did because you have no idea what limiting the amount of change orders mean and i don't see and the way we do change orders once you let a contract well i mean i'm sitting here thinking but once you leave once you let a contract you're not you're going to build that project if there's if there's problems with the plans you have to do some change orders we've got to do that we're under construction we're going to finish that project there there's unforeseen field conditions i don't know how they did
▶ Play
Speaker 107 35:38
that and you've kind of substantiated my my concerns again they
▶ Play
have to do the best they can do realize but but there you mentioned context there is a lot of context to be put in this and i just want the committee keep that in in mind there's so many variables here and and when you're comparing different models and all you just can't go with the same percentages i don't think it's the same deals Right. Thank
▶ Play
you. All right. Thank you. Thank you. Do we have any other questions? I've got one, and it's really kind of on a comment. I mean, one thing I would say is that Texas, some of the bigger states that have larger programs, if they've run a course and found a way to save money, there's a model to be followed. We do it all the time in state legislature, state government. you know we see where other states have things working they're the ones that put in the initial dollars to to really data mine find that information create the program and we're piggybacking at a fraction of the cost typically on those types of value-led programs and so that's if we can and I think this is what guide house is staying I don't want to speak for them but we should reach out to Texas and see if there's some things that could be applicable you know for what they do there again that they've put the resources behind to figure out the the savings from that we could implement here and see. One thing I wanted to say is on the like where we talk about devising a plan for instance on and it touches a little bit I think on what Senator Stubblefield was getting at for the change orders and trends and insights and that sort of thing when When you all do that, when you plan on doing that, what do you think public comment will look like for that? I mean, because I believe contractors will want to have some type of public comment. I think mayors, county judges, folks that are, you know, participating in the public would want to have public comment on how those things are implemented. What does your process look like for that? Implement, what,
▶ Play
Speaker 47 37:46
change order policy? Well, it says we will
▶ Play
begin to devise a plan to implement a formal framework for practical design value engineering and for the evaluation of change orders for cost savings trends and insights okay I'm with you so as we're going through these you know there's a lot of things that you that I mean I think it's great they're already started we're kicking them off but there's a lot of things that that haven't started at this point and even those that have began where does the public input come so that we make sure we're all on the same page and that it's something that will work for our you know
▶ Play
Speaker 47 38:23
the the contractors and other people in the state well I guess it can begin at the it should begin at the beginning of the process if public input is desired and we and you bring a good point you know that would be a good thing to bring them to the table and talk to them about what we're planning on doing if it's going to change the way we do business I think that's an excellent point and we'll we'll follow that I've already had talks with as a new director of course the AGC and folks have reached out to me and they're they're very much interested in a collaborative relationship and and I see a great benefit in that and I plan to pursue it so I'm glad you mentioned that because I think that's an excellent idea and it's an excellent way to foster that collaboration with the industry and with others, county judges, people, other people that are interested in the roads. Can I make one comment, though? Yes, ma'am. I feel like possibly my statement about Texas and California was misinterpreted. I don't think that, I think they have great, they probably have some great policies in place and things we can learn from. What I was trying to say is there's an economy of scale with a smaller program. You know, we're a centrally administered program. Everything we do is in Little Rock, and then the districts take care of the construction. So when it comes to project management, the guy that's doing the planning is sitting right next door to the guy that's doing the design, that's over-designed. And so there's a lot of collaboration that we, you know, that's what I meant, that we, you know, Texas and California, they're huge, and they're not central. They have many departments all over the state, all over their states. And so they have to have a more formal project management office to make sure they spend all the money and they coordinate all these different offices. We're just not like that. We're different. And that's why all of these recommendations have to be taken in the spirit of who we are as RDOT and what works best for us and not just, you know, if Texas does it, it may be a great thing, but it may not be a fit for us. I'm not saying we shouldn't strive for excellence in any way, form, or fashion. I'm just saying we have to make common sense decisions on how we implement some of these things.
▶ Play
Yeah, and I think to the points about formalization, that's so that, yes, two people may sit next to each other in their office and two people may be friends and one door down they may not you know we don't hang out with that guy or we don't have a good relationship and it's not formalized all those parties can't learn from each other you know what I mean if the communication is informal then it only benefits those that are involved in discussion and formalization allows the public to see what's happening as far as those conversations it I mean that that's what I think we're saying on formalization or at least that's the
▶ Play
Speaker 47 41:29
way that taken well once again I'm not saying we shouldn't formalize I'm saying we should I'm just saying that looking at what Texas and California does as far as I was talking about program management or project management but we do need to formalize I'm not I'm not saying we're not we're not and we we can learn from other states that's for
▶ Play
sure all right great thank you all right I think we have any other questions, any other comments on recommendation number five? All right. Seeing none, we do not have any public comments submitted, so we'll move on to recommendation number six, and you all are recognized.
▶ Play
Speaker 11 42:12
Thank you, Senator. So, again, starting off with the key findings as it relates to recommendation six, which is related to, you implementing a construction contractor performance measurement program some of the key findings related to this recommendation are PR 2.1 which is that you know the department does have a pre-qualification and bonding process however that approximates the likelihood of project completion and doesn't necessarily screen for quality again the department also has standard specifications for construction projects and you know that the last update was as of 2014 there are some amendments obviously but as of 2014 and they mandate certain performance criteria but again they don't necessarily screen for quality because they come into play after in many respects after the project has been led to the contractor and then the third finding here is that there are some you know specific opportunities that exist to improve some existing quality issues and so in terms of the supporting evidence you know taking a look at one of the federal highway administration uh reports that we had cited uh they'd identified that the performance bonds that dots typically use don't provide any guarantee against a contractor's marginal quality of work so long as that contractor's failures are not large enough to trigger some sort of default so that they're really there to protect against default but don't necessarily guarantee um uh you know quality of work and and right now that the current policies don't necessarily limit the ability of poor quality contractors um to compete for bids uh but that being said uh you know the the department in its in its 2019 transportation asset management plan you know identify that poor quality construction is actually a very high impact risk as it relates to its long-term asset management and at the same time the the department does not again at the time of our review does not or did not formally monitor contractor quality and so uh you know as it relates to our our recommendation around implementing um you know some program of construction contractor performance measurement um we believe that um the department and i just need to move my window here um may improve project delivery uh incentivize and reward high performing contractors and encourage low performers uh to improve and in terms of the anticipated impact you know we source this from a couple studies one is the the federal highway administration study that I talked about earlier, but also a national cooperative highway research program study as well that also led to some findings when they surveyed a number of DOTs. I think they talked to 52 DOTs across the United States and also in Canada, and they looked at about 43 usdots you know perform contractor performance um programs and and based on those those two studies um you know the the dots reported that there were improvements um or believed that there were improvements in safety timely work completion and contractor cooperation by implementing a performance based um a contractor performance based system now there are definitely some considerations uh here uh you know it the a performance-based system may have differing impacts on contractors of various sizes um and uh you know there there is a perception around um you know uh dot's ability to be able to implement um uh you know sort of a fair and equitable uh approach to contractor performance measurement and and both of those studies speak to it especially the national cooperative highway research uh program where you know the respondents you know indicated uh at least the dots and even the contractors that indicated um that dots would be able to to design and implement a fair and equitable uh approach but that being said you know that perception exists and emphasizing more of a quantitative approach could minimize any appearance of subjectivity in scoring um and also to help you know mitigate uh some of those perceptions or negative perceptions of such a program you know contractors should have a clear path to raise or appeal their scores um you know to the extent that the department moves in this in this direction um and there are already um some practices in place uh at rdot that prevent contractors uh from bidding on projects so you know contractors who are in liquidated damages currently are prevented at least our understanding are prevented from bidding on new projects but we'll talk about the implementation summary uh in a little bit uh more detail but again just wanted to highlight um a few things from that federal highway administration study and the national national cooperative hybrid research program study and both provide a framework uh for you know quantitative performance based pre-qualification system uh and obviously outreach to some of these dot's that are implementing uh you know similar systems can yield you know additional detail uh and insight as it relates to designing such a program um and uh you know the and i mentioned this before but you know uh part of of of you know a key finding here as it relates to you know leading practices was that um you know the study found that that um just having a performance-based system did not provide any guarantee of a contractor's marginal quality work and in fact it cited that um you know basically a a contractor that is able to meet the requirements of a performance bond a low quality contractor that's able to meet the qualifications of uh of a performance bond has essentially uh the same opportunity uh in competing for a construction contract contract as a contractor with exceptional quality that's also able to meet that um meet that performance bond bar so in terms of the the roadmap itself um you know there is a phased approach has four steps um and the first one is really trying to understand if you know you're moving towards a system of of measuring you know contractor performance quality is really to understand you know what are some indicators that that might suggest um or might indicate um you know or differentiate between a you know poor performing contractor versus a mid-level versus an exceptional contractor so some of those might be past performance such as quality of workmanship uh their managerial ability safety record their technical capability their ability to manage traffic uh and um you know the public uh cooperation with uh not only the department uh but also other you know uh stakeholders such as utility companies uh as well as you know potentially their quality assurance program and so you know once you've kind of identified those those indicators it's really identifying the folks uh within the department that could conduct those performance evaluations um and and how that work product will be audited and to what extent that will already be part of um for example the resident engineers or their staffs um you know day-to-day week-to-week month-to-month processes and how it could potentially be embedded in that and then determining the frequency of that that evaluation and once you kind of identify the indicators and how the data is going to be collected um it's really developing a scoring system at the same time and so again it's taking a look at some of these studies it's also taking a look and reaching out to some other DOTs that are implementing a performance-based system to understand how they're doing that and potentially designing at least you know an initial or prototype methodology for scoring and then potentially discussing the to the extent that you know department wants to move in in that direction how you know your bid capacity score so your ability to bid on a project might be impacted by such a performance evaluation to the extent that it is you know publicizing that process um and and really engaging uh you know numerous stakeholders in that process to collect that feedback uh and then you know putting together um at least again a prototype scoring system which then leads into the you know the third step here uh which is then starting to collect that performance data um you know during the construction project but also uh at the close out of that particular project uh and and you know building that full data set and that that might take time right this is at first you know uh sort of blush uh a data collection effort and then once you've you've kind of taken a you know look at the data bump that up against the actual you know the prototype performance management or performance measurement uh policy uh you know understand you know sort of evaluating that and understanding to what extent it is actually you know achieving the you know intended objectives and then continuing to iterate on that scoring system while you continue to um you know build that data set and then from there uh it's about integrating that within you know the pre-qualification system so determining you know at what threshold will a pre-qualification uh system apply so which projects will it apply to um you know you have to also determine you know a policy for contractors that are new to working with the department because you know not every contractor will have had past experience um starting to implement uh this policy and then again evaluating on a regular basis regular cadence uh to continue to refine that process um so that not only is it you know safe um and sorry not safe but fair and equitable but also you know achieve the intended outcomes which is around incentivizing, you know, quality construction and then potentially at the same time also yielding cost savings, you know, not only for the department but for, you know, the state as well. And with that, I'll turn it over.
▶ Play
All right. Thank you. Director, you're recognized. Okay. Thank
▶ Play
Speaker 47 52:56
you. May I ask Scott House a few questions for clarification? yes ma'am okay um sauger can you hear me yeah hey i can a long time i haven't talked to you in a while it has been a long time oh okay um on on page seven um i think it's the prior slide the slide before the implement yeah i got confused you said there was 43 participants in the survey that came up with the safety, timely work completion, and contractor cooperation. But then right above those little charts, it says six reporting VOTs. So that threw me off a little, because I was looking at that in the report. Can you explain that? So as it relates to
▶ Play
Speaker 11 53:52
the NC HRP study to inform, you know, the broader analysis and findings of that particular study, and that was in 2009, and the Federal Highway Administration study, in many respects, built on that, and that was from 2014. They, as part of that broader analysis, surveyed, I believe, 52 DOTs across the United States and Canada. The NCHRP study? The
▶ Play
Speaker 47 54:16
NCHRP study was 52 survey
▶ Play
Speaker 134 54:18
results? Okay. and and so as it relates to identifying
▶ Play
Speaker 11 54:24
some anticipated impacts as we were taking a look at the data to understand what an anticipated impact could look like based on the experience of those DOTs for which they'd asked some very specific and targeted questions across those two studies kind of narrowed that down to six and so this was based on their perception of the impact of implementing their performance-based vendor or contractor performance program and those states are florida michigan oklahoma utah virginia and washington okay all right thank you does that answer your question director tutor
▶ Play
Speaker 47 55:05
well sort of that's okay i'm i'm i guess i understand but i don't even have the same states written down so that's all right i'll i'll review the study again but i'll be fine i just have a few more um now when we're talking about the fhwa study and that's mentioned under the leading practices and i know that study is built off the nchrp they use that a lot in that fhwa study but are we talking about um 14-034 performance-based contractor pre-qualification as an alternative to performance bonds is that the study we're talking about as a leading practice this study can you see it uh sagar are you
▶ Play
Speaker 11 56:08
there oh sorry i was on mute i said give me just one
▶ Play
Speaker 7 56:12
second to confirm that all right dr tudor this is aaron you said performance-based contractor pre-qualification as an alternative to performance bonds dated august 2014 yes correct that's correct yes same
▶ Play
Speaker 47 56:25
study yeah okay that's the study that's thank you that you're referring to as a leading practice okay all right this study defines three turn tiers of pre-qualification administrative performance-based and project specific we're talking about performance based for this recommendation correct tier two that is correct okay good all right there are three models for each one of these tiers and according to the study these models are a combination of processes concepts and terminology used by florida ohio and ontario is that correct yeah in
▶ Play
Speaker 11 57:05
terms of the specific model that they they had cited and recommended, or as it relates to the model that they have described in that particular report, yes, it's based on those three DOTs. From what we understand in reading the
▶ Play
Speaker 47 57:21
report. Okay, good. And then the tier two, which is the one we're to use for a leading practice, is primarily the performance modifier is based on Ontario's Ministry of Transportation. Is that
▶ Play
Speaker 11 57:34
correct? I'm sorry, Director Tutor, I
▶ Play
Speaker 47 57:40
kind of lost that. Okay, tier two model, which is what we're looking at for RDOT to implement, is modeled after the performance modification factor is modeled after the Ontario Ministry of Transportation, that formula. Yeah,
▶ Play
Speaker 11 57:59
and that is one example, And that is an example and a particular approach that, again, you know, thinking about, you know, sort of this phased approach around contractor performance measurement. There's a piece around actually measuring the performance and then potentially, again, as part of this implementation, where it makes sense to do so using that type of measurement to potentially modify a bid. But, you know, as we kind of discussed in our implementation roadmap, there's a number of steps before you get to that
▶ Play
Speaker 47 58:36
point. Correct. If it's appropriate. Okay. So for this recommendation, you used that FHW study as a leading practice. What other states have implemented this study and used it to form, you know, to form their performance-based prequalification? What other states are using this as a leading practice? Well, given
▶ Play
Speaker 11 59:01
the fact that the National Cooperative Highway Research Program study, that NCHRP study, was so expansive, and then the Federal Highway Administration built on top of that, we were using the findings and learnings, And they were fairly comprehensive studies to inform, you know, this particular or to help inform this particular recommendation. But the
▶ Play
Speaker 47 59:26
procedures that are lined out in here as leading practices, have they been adopted by any state, any state DOT? have have the specific recommendations
▶ Play
Speaker 11 59:38
that those that are cited in the FHWA report been and I just want to make sure I understand the correct question correctly have they been adopted
▶ Play
Speaker 47 59:49
by any state DOTs correct as a leading if this is a leading practice
▶ Play
Speaker 11 59:58
what states have implemented it yeah I don't
▶ Play
Speaker 47 1:00:01
know that we can necessarily say either way on that you can't okay Finally, the study report revealed that performance bonds provide no guarantee against a contractor's marginal quality of work. Is there anywhere in the study, I couldn't find it, that guarantees that a performance based prequalification would guarantee against marginal work? Is there a guarantee for that? kind of quantitative measurement anything to hang our hat on that if we implemented something like this we would be guaranteed to
▶ Play
Speaker 11 1:00:44
get quality work there was not um an explicit and and they were fairly clear in this report there wasn't necessarily an explicit um quantitative measurement of um of you know sort of guarantee or protection against marginal quality work however when and especially in the nchrp report when they uh pulled the dots and i would say frankly the contractors the vast majority of them believe that implementing such a system would have um a positive effect on a number of measures or indicators uh of quality you know including um uh you know safety record in term and including timely work completion cooperation with the department as well as other stakeholders um uh and so on and so forth and so uh from from that aspect when you know when they have had a chance to survey uh you know that many states and also you know significant number of contractors how many contractors on their perception can i interrupt and
▶ Play
ask you how many contractors director tutor i mean i understand but we we ask you to provide a response in that response i mean you gave us one it would have been very helpful i think for today if you had listed your questions with your response so that we they would have had time to do their research know what to answer instead you're asking them to go back and tell you the number of contractors in a study they can do that i can do it it's 10. okay then just say it i think that would be more beneficial to everyone here because i'm not sure what what we're going towards but i think it would be more beneficial for us to get into the response if you've got a couple more questions you want to wrap up but if you know the answer then i would recommend maybe not asking
▶ Play
Speaker 47 1:02:43
the question but go ahead and give us the answer well when he said and numerous contractors I just wondered where that was coming from because I didn't see that in the study that's why I wasn't going to ask that question but I'm through with my questions and I needed that clarification because in this particular recommendation the Arkansas Highway Commission and RDOT has determined that this would not increase efficiency or enhance quality in construction and if implemented is our opinion that the result would be the unintended consequence of a substantial decrease in efficiency therefore we respectfully decline to implement this recommendation and feels like Christmas before I get into the reasons I just I just want to explain to you what we do at the department I think there's a misconception of what we do no one you need to understand how we operate our business for design bid build and that's what we do the majority of our contracts are design bid build method of delivery. So prospective bidders for highway construction are required to be pre-qualified by RDOT and these pre-qualifications require satisfactory evidence that they have been regularly engaged in the kind of work that they want to bid upon and that they are fully prepared with the necessary capital, material, machinery, and expert workers to carry out the contract. This is what's called administrative qualification, pre-qualification. A financial statement and experience record must be furnished on the questionnaire form and must be certified by a CPA. The pre-qualification is valid for one year. From that information, the department's fiscal services division establishes a rating. Contractors are rated for a maximum amount of work they are allowed to bid on and actually get an amount of work that they can work on for any period of time. The maximum amount of work considered will include all unfinished value of contracts underway. In that FHWA study that's a leading practice, Tier 1 is administrative pre-qualification. Most states do this. This recommendation is asking us to develop a completely different rating system based on past performance and on other factors out in the field that have to do with the contractor, and they would be rated on every project that they have. okay it's going to be a big data set and we're going to rate these contractors and based on that rating and based on what we decide to rate them on we will apply that to that pre-qualification amount and we will either reduce the amount they can bid on or increase it so that's what this is about it's about giving them a amount that they can bid on amount of contract work they can actually be awarded and adjusting that based on some type of rating out in the field be it man how they manage the project how many change orders they have how many delays they've had all there's all these different ways of rating them okay so after a contract is contractor is pre-qualified and they're added to our bidders list they can bid on projects within the amount allowed that they're allowed if they furnish a bid bond and that guarantees their bid if they decide they do not want to honor that bid they forfeit their bid bond that helps the integrity of the bid process that you can't just put a bid out there for something and yank it back because you see that maybe you left some money on the table or whatever whatever the circumstances may be but there's another very important thing that we do and this was a brilliant this was done back in 1996 and whoever thought of it was brilliant because what it does is this is it effectively does what all of this others all of this other writing would do but it's a lot simpler and it's objective it's we do not allow contractors that are in liquidated damages which only means that they have gone over the amount of the contract time and there's two reasons you might being liquidated damages you're either too slow you're not putting enough resources on the project or you're not doing a good job and you keep having to go back and redo so that puts you into liquidated damages and you can't bid on additional work well that keeps those contractors that gives them incentive to do quality work not to have to go back and redo and it gives them incentive to put enough resources on the job not to go over the time allowed and it's subjective you're either I mean I'm sorry it's objective you're either in LDs or you're not there's no how well did the contractor did in this regard or this regard or that regard and you bring in human subjectivity it's it's just what it is you either are you're not and so this to us is is huge it's a huge step to make sure and it's helped get our projects where they're done on time it's done a lot of things to encourage good performance out in the field if a contractor is allowed to build their bid and they're not in LDs they're the low bidder then they have to obtain a contractor's license and a performance and payment bond they go through a whole nother set of qualifications they have to show the bonding company and the contractor license board. If they're not able to get their bonds, if they're not able to get a license, then they don't get the bid, and that goes to the second low bidder, and this is all only if it's within the engineer's estimate. Once the contract is awarded and construction begins in the field, we have construction standards and each one of these construction standards. This is our spec book and you can see it's very, very detailed and this is the go by. This makes sure we subjectively look at all the work, the contractors know what's expected of them and they have to follow this spec book. This ensures quality out in the field. There's also special specifications and special provisions that are unique to each job and they have to follow those as well. We have disascentive pay, we have incentive pay, we reward high performing contractors and we encourage low performers, but we don't do it when it comes to when they can and cannot bid on a project unless they're in LDs because the subjectivity that would be inherent to a rating system is just, it's just there and in that study it mentions that several times that there's worry about subjectivity and there needs to be every effort not to have it but when you have people involved rating other people out in the field and in the situations that are happening it's just almost impossible to figure out how to do that in an unbiased way. At least it would take a long, long time and a lot of iterations to get there. mentioned this study as a leading practice in its performance and payment bonds it's replacing the requirement for performance and payment bonds or at least limiting the amount that you have to get a performance and payment bond on with a performance based pre-qualification system that's what this study is about because there's cost savings if you don't have to be bonded And when you're bonded, that cost comes down to us, of course. You know, when a contractor bids on a project, they have to get a bond. That's incorporated in their bid cost. So this, in effect, if we really did what this study is talking about, the ultimate goal is to reduce the amount of requirements for bonding, that would make RDOT the surety company for the taxpayer. taxpayer. I mean, we would be protecting the taxpayer's investment. And since RDOT is wholly funded by tax dollars, taxpayers would be taking the risk of possible default. Now, I know default is low, but to me, being low in default means that our bonding companies are doing a good job of screening these contractors before they are allowed to get a bond to do a job. If the goal is to keep the requirement for performance performance payment bonds and add another layer of complexity by adding a performance-based prequalification system, this just seems redundant, a lot of extra work and a lot of cost for not a lot of return on the dollar. The cost to implement this, if we did it right, would be significant. We are already at capacity level out in the field. We would have to hire additional folks in the field to do these evaluations, to get them into the system. We would need to hire additional folks to validate these evaluations, these ratings. We would have to do all kinds of things to set this system up. It would take a lot to get this system set up. And the study states that the major cost associated with implementing performance-based prequalification is the cost of state transportation department staff to administer the program. And so there's just, I just want you to realize that this is not a small recommendation. This is a big, this would mean a big change and a lot of cost to implement it. There are so many variables out in the field. No project is the same. No contractor is the same. No RDOT inspector is the same. There are many challenges associated with trying to rate contractors out in the field. There may be personality conflicts between the contractor's superintendents and RDOT's inspectors, unforeseen site conditions, plan errors to be remediated, construction mistakes that will need to be corrected, subcontractor problems, material supply problems, the list goes on and on. And to be able to quantify performance in a meaningful way, given these variables, would be very difficult to standardize and implement in a fair and unbiased manner. It is very, it's impossible for me to imagine an objective process that keeps the playing field level and the treatment and rating of contractors the same across the state. It's just when you have people involved in this type of thing, it really gets to be difficult. Competition. We need as many bidders out there that can bid as possible. Obviously the mega-contractors, the key wits of the world, are always going to get rated higher. I mean, they've got more resources, they're going to do a better job, but that's not what we want in Arkansas. We want competition. We want our Arkansas contractors to be able to get work as well as the big contractors. We want an even playing field. We want everyone to be out there working and bidding on these projects in a low bid environment. So each state Department of Transportation is unique. Each has a different organizational structure and processes, different contracting communities, different surety companies, different laws different regulations, everything's different. Every DOT across the state has a different set of parameters that they're working under. And in Arkansas, the culture is we want to maintain the integrity of the bid process. We want it to be completely objective. We feel like that's the best place to be, both legally and morally for the taxpayer. It needs to be objective. RDOT has relied on performance and payment bond requirements from the beginning for as long as I can remember. That is what we, if they can get a performance and payment bond, we feel assured that they can perform that work, and if they can't, they will have, the bonding company will have to step in and take care of that. They'll have, will default the contractor that our dot in the Commission feel that we have created a system that work it's the best of both worlds but we've can we've been able to keep it objective and so we have this objective bid process we had the liquidated damages specification that that we we abide by and we have safeguards in place to ensure bidders are qualified we just feel like where we're at today works it works well and we don't see how this is going to make us any better our contracting community is confident right now I've talked to them they think that we administer our bidding process fairly and they have reached out to me and voiced their concerns and I don't blame them for being concerned I was concerned as well when I read this recommendation how can we do this and not be subjective and remove all subjectivity I I think what we already have in place works and it's objective and it doesn't it maybe it needs a tweak here and there but overall it has been we it has been a process it has grown year after year we've implemented new and better ways every year and it's a good system finally it needs to be said we cannot do what we do at our dot without our contractors we can't deliver projects that's not what we do we we just make sure we get them designed to the best of our ability and we inspect construction but we can't construct these projects we need a good contracting a good solid contracting community and I just want to say that it's it's just very important that we that they feel like that we are a great state to bid on to bid for projects in and that we get bids on these projects and we don't limit competition and you know this on the surface this recommendation seems wow that's a good idea right but if you really think about what it would take to implement it I mean really really think about all the moving parts I just hope that each one of you will see how it is not a good a a good fit for arkansas it's not a good fit it won't increase efficiency and uh i say that with with the utmost respect i understand that god house they did their best they did a good job looking through all this but this study just this anyway i'll just leave it there um i've I've talked to Matt Cashin. I've got him, and he represents Cashin Company, which is a bonding company, Park Estes of the Arkansas Asphalt Paving Association, and Joey Dean of the Arkansas General Contractors, because I think it's important. This is so important. You don't need to just hear from me. You need to hear from the other side of the table, the contracting industry, and you need to hear what bonds really are all about, because they do a lot that we don't even know they're doing. They're taking care of a lot of things that are behind the scenes we don't know because that's why our default rate's so low. So at that, I'll stop. I don't know if you want to ask me questions now or later. I'll just have just one
▶ Play
question for Guide House because it seems a lot of this is going to be centered around the bonding. Was that part of your recommendation or was it just part of the report? I didn't see it pulled out in the implementation roadmap as doing away with the surety bonds. Is that something that y'all were driving towards or making the recommendation of? No,
▶ Play
Speaker 149 1:19:37
Senator, that was not something that we were recommending to
▶ Play
remove the performance fund. Okay. All right. Thank you. So I agree. I think objectivity would be what would be critical if you're going to have this type of program in place. I agree 100%. And then I think that's where your pitfall is. I mean, I would say I would have thought that a lot of this information is being gathered as the project is continuing on by, you know, whoever, you know, RDOT has overseeing the project, right? I mean, I don't know much about what happens, but let's just take the bridge project that had the fault and the, you know, the poor and all this other stuff. There was someone that was measuring as everything went along, and they found this coal joint, right? So there was, you know the measurements i think are taking place so i'm not sure that i understand the manpower need when it's already happening maybe it's how they report it you know like so my father-in-law is a doctor and he complains all the time about how much you have to input as you're seeing a patient now as opposed to when he practiced 30 years ago i i get that there's some additional time restraints i guess for me my takeaway from this recommendation would be because what i would like to see i mean i i'll just say i've talked to commissioners that have disparaged contractors that we have on jobs when I've called out questions about particular jobs. But there is, to your point, no grading system. So there, I mean, it's all subjective at that point in regards to the feeling or what's happening with the contractors. For me, I mean, the cheapest person for me to go work on, you know, my house is me, but I am not the highest quality and I am not the fastest and I am not many, many things. And maybe it shouldn't be part of the, I guess what I'd like you to consider or look at, maybe it shouldn't be part of the actual bid process, but just in the qualifications process of, I think these folks should be graded to some degree. I think we should know who is a good, high-performing contractor. Now, I would argue that there's a lot of benefit, in my opinion, to a smaller contractor in this situation. They're more nimble. You know, if I, I'll just give an example. If I'm going to use electrician i'm going to call the one-man show i'm not going to call the biggest you know electric company in the in the in my district and so for them to be able to have measured and seen performance would be valuable to a small contractor because where they might not be able to make up for the bells and whistles and presentation they can buy their history and their performance and what they've been able to do and so again i get the objectivity being a big concern But I do think there would be some value in looking at doing some type of grading system so we can see what performance is in my perspective because it benefits the small companies more so than large because they're able to do things more efficiently than some of the larger organizations that are out there. At least that's my perspective just on my history and I get there's apples and oranges from contractors for road work and contractors for that are electricians but i do think there are some similarities or at least that's what my small contractors tell me but what do you do you have any thoughts on maybe allowing or looking at you know some way that these folks can be degraded on their job so that they know at least and i'll just say we've tried to do that ourselves if you look at this report we asked from y'all you know we don't know what we were asking for and it needs to be tweaked needs to be changed but we know we ask is it over budget what is the time when's it supposed to start when's it supposed to stop so we can try to measure a particular project applying that to a contractor I think is also also valuable could really
▶ Play
Speaker 47 1:23:35
highlight some of those that are you know achieving well for the state I'm not a hundred percent okay so on my on my studies on performance based you know there's there's several different variables that you look at not just one right so they might make a mistake out in the field that would that obviously would be one but there's so many others that you look at you know they're according to this if you put in a robust performance based pre pre-qualification system that's where you would need additional people because it's not well let's just let's just scrap the
▶ Play
idea of pre-qualification okay but but I mean I would like to know how our contractors perform and I think from some of the conversations I've had they would like to know how they're perceived to perform too and so you're saying though okay that no one's graded at the end of the job you know what I mean in that grade if there is a grade it washes and disappears so long as they're not in liquidated damages they bid on to the next job forward and forward and forward so you could have a contractor that's habitually late they over schedule they move but they never went into liquidated damages but you know again I've had some talks with commissioners that have explained to me these contractors exist and there's no way to stop them under what we have right now from continuing on dragging out projects getting over budget so long as they don't
▶ Play
Speaker 47 1:25:09
go into liquidate you know liquidated damages okay so are you are you suggesting we rate contractors but just rate them not use that rating to limit bidding I think
▶ Play
in the beginning that's where you start the process yes is a rating system you know keep your liquidated damage and again your liquidated damages approach in place but as you gather the information and fine tune it then i think it's very very useful at some point in the future for rdot again i i mean i just i'm going if i'm going to hire a contractor i'm going to base it on reviews just like all of us right now will go on amazon and if we're looking between three project or you know products we're going to buy the highest rated one right if they're within a few dollars of each other we're going for the highest rated one
▶ Play
Speaker 47 1:25:56
but we can't do that in a low bid world
▶ Play
And I'm saying in the beginning, I don't think it should be punitive to the process, but to gather the information, what is the downside to gathering and grading and at least retaining that information so it's public information, everybody can see it, we understand when someone's behind, when someone's on schedule, when someone's habitually behind, when someone's habitually over budget, but right now we can't see any of that because there is no grading. There is no public evaluation of how that project went.
▶ Play
Speaker 47 1:26:30
Okay, I see what you're saying, and let me offer this. Why don't we have some discussions with AGC, talk to the contractors, see if that's something they would like to see us implement, and it not be a formal, not a real formal. I mean, we'd have to be careful. We'd still have to be very careful. Yeah, I wouldn't want anything like that to be subjective, but we're taking measurements. I will just say that let us talk to the contracting community, see how they feel about that, and then let us look to see if we did do something like that. It wasn't used to influence whether we gave a contractor a bid or not. I want to make that clear that we would not do that. But just to have that information and, I guess, a feather in the cap of that contractor if they get a good rating, I don't know what it would be used for except for just for knowledge. But, you know, we could look at that and see if the contracting community can give us some insight into that and to see if that wouldn't put a huge burden on our field personnel.
▶ Play
We can look at that for sure. Thank you. Senator Hendren
▶ Play
you're recognized for question I think thank you mr. chairman and excuse my ignorance on this but if you have a project that is a bridge or whatever are you required by law to always take the lowest bid or can you because of other criteria not
▶ Play
Speaker 47 1:28:07
take the lowest bid well of course are you familiar with a plus C of it I won't get into that normally okay design bid build the lowest responsive bidder which means they they mark off all that we have to take the low bidder okay that's
▶ Play
what I thought and I understand the challenge at that because then basically you're either qualified or you're not to participate in the process and there's not any recognition because I know in the school world you have the ability to say this bid is lower but we're more comfortable with his contractor for various objection objective reasons and not take the low bid and speaking of schools and grading and evaluating one of the more controversial bills that I passed several years ago was grading schools ABCDF and I know some of our folks here still are upset about that but the fact is when we had testimony last week from superintendents about the success of the PLC's the professional learning communities without fail everyone used as an example they went from a D school to a B school or a C school to an A school and that was a way that they could demonstrate to the community that they had improved and I will tell you the biggest objection to that criteria was it they're so different you got large schools big schools small schools rural schools city schools minority population schools there's no way a grading system can be fair and some would argue that it's there's still some downsides and maybe some unfairness but for the most part they took all those things into effect they came up with a process that makes the taxpayers more aware of what's going on in their community and I guess I don't understand why first off we would ask the contractors if they're okay we're the ones paying the bills to the contractors about these projects as opposed to establishing the criteria something as simple as safety record I mean if a contractor over the last 10 projects has had four people killed that's something that might ought to be documented somewhere or on time completion rate or under budget completion rate I don't understand why we can't establish some basic criteria to and then at some point use it as a tool in your evaluation process when you start having the close calls on on projects I mean is that just outside of our ability well it
▶ Play
Speaker 47 1:30:31
all hinges on the pre-qualification amount and so they get pre-qualified based on those objective measurements I told you and then they can bid within that amount other than that you know if they can get bonded if they can if they do all the things they need to do so if you
▶ Play
have a contractor though that project after project after project you have challenge after challenge after challenge the next project that comes around so so long as they meet the pre-qualification criteria absolutely no harm no foul with regard
▶ Play
Speaker 47 1:31:12
to previous record that's correct but that makes sense well okay so you're talking about grading public schools which are a public entity right they're they're taxpayer funded and they're in they're an entity we're we're talking about grading a private firm
▶ Play
not not the firm the performance of the firm well I know but in completion of a duty paid for by the taxpayers
▶ Play
Speaker 47 1:31:36
right but but what I'm saying what I'm trying to say is what are we gonna do with that I mean we can do that we can definitely do that but we and we'll have that if but we have to figure out how to do that yes yeah I agree with that in a responsible way you know I mean I don't I don't know the answer and I've got some folks here and maybe they can answer that question better but I just don't
▶ Play
understand the the difficulty in establishing some objective performance criteria with regard to job completion or safety experience or budget. Are we talking about what Senator Dismang
▶ Play
Speaker 47 1:32:17
said, that we come up with a way of rating contractors based on their past performance and not use it against them? I agree with Senator Dismang. That's
▶ Play
a good starting point if we're so uncertain. But, again, the idea here is not just to do it for the sake of doing it. It's doing it so we can make better decisions at the state government level and also encourage contractors to perform. If they know that they're going to be identified as a subpar contractor for performance time after time after time, I would say that any private industry is going to be motivated to improve, which is a win for the taxpayers. So I guess there's a lot of value. Again, I think you're probably right. Until we learn for sure we're doing it correct, to base eligibility or bidding criteria on that is probably too far. but to not do anything with regard to evaluation of performance, I think to me as an engineer, that's what we do in business every day is we find ways to evaluate so we can improve.
▶ Play
Speaker 47 1:33:18
Well, as I said, I'm willing to look into that and see how we can accomplish that and do it in a way that's fair and as objective as possible. But we have to be careful that we don't put too much burden. We're already stretched so thin out in the field, so we're going to have to do it in a simple manner if we do it, and we'll have to talk to see what are the things that we need to look at. I mean, I'm not even, you know, what does that look like? What is it going to look like? What is it going to be used for? Are you going to use it? Who's going to use it? Are we going to come back one day and say, okay, now we're going to use this against you? Are we going to put it, you know, what is it for? What is this going to help us do? And those are the questions we have to figure out. Is it meaningful? Is it going to mean something? Because we can't use it. We still have to do low bid. All we can do under the laws the way they are now is to say, okay, you can't bid on more than $10,000. If you don't shape up, we're going to take that down to $5,000. And, you know, you're just not going to get the work. You can't bid on the work. That's what we can do. And so, you know, and to take those subjective ratings that, as hard as we try to not make them, it's going to be a very difficult task. And to apply that to our, that's the only way to limit those contractors from
▶ Play
bidding. Thank you. And one thing I want to say is I think the upside for the department, at least in my viewpoint, and even for the contractors, it creates an even pain field as a project is being implemented across the state. So if everyone's kind of grading by the same system as the progress takes along, even to your point, you were saying there may be a personality conflict, there may be a whatever going on, It takes a lot of that out of, or could potentially take a lot of that out of the process, because everyone would be using a formalized process on how they evaluate a project as it moves through, you know, to completion. And so that, to me, even, again, even if you don't use it eventually for, you know, awarding contracts, it does allow, again, all the contractors to know what to expect. And it's not a different situation based on who you have, because they're all utilizing a formalized, you know, subjective system to evaluate the project to completion. With that, I'll turn it over to, I'm not sure who seat 24
▶ Play
is. All right. Senator Chesterfield, you recognize. Thank you. My question is for Guidehouse. Is there some mechanism in place whereby other states have evaluated work? Sorry, I didn't hear the question. Is there a process that other states have
▶ Play
Speaker 11 1:36:38
used to evaluate work? To evaluate the actual contractor? The work of the contractor? The contractor? Mm-hmm. yes yes there are and do you do you
▶ Play
have examples of that evaluation of those evaluations
▶ Play
Speaker 7 1:36:51
i think those are the foundations for those the two reports that we referenced in the recommendations um i'm saying
▶ Play
do you have a list of what they look for when they evaluated the work
▶ Play
Speaker 7 1:37:04
their specific evaluation criteria uh-huh i see do you have i don't know if they included that
▶ Play
Speaker 11 1:37:12
or I can't hear you. Sorry. I just went off mute. Yeah. So, and I think the study articulates that they look at a combination of factors, right? Obviously, project completion, on-time completion, on-budget completion. But they also look at managerial ability. They look at their safety record. And so you're just
▶ Play
looking at a group of indicators that if it's on time, check. Was the work completed to satisfaction, check? So that's what you're talking about? Is that impossible then, Madam Director of Transportation here in Arkansas, is that impossible for you to do? This goes, the way
▶ Play
Speaker 47 1:37:55
this reads, of course you can make real high level criteria or you can do more detailed. Well, I'm just saying
▶ Play
if what this committee wants is a checklist of did they do the work on time, did they complete it, were they within budget, check, check, check. would that make it impossible for you no all right secondly is there a clawback clause in most of the contracts that you have already a what clawback clause that is if they don't do the work by a particular time do you take money away from the contract if they don't do it up to specifications can you can you claw back money
▶ Play
Speaker 47 1:38:32
from the contract there's reduction in the unit price or the amount we pay if they don't bring if they don't build it to
▶ Play
a certain standard yeah all right and my final question is is there a huge number of entities that are capable of doing this work they're a huge entity is there a huge number of entities able to contractors able to do this work
▶ Play
Speaker 47 1:38:57
well it depends on the type of work okay yeah there's you know the bigger jobs there's less contractors that are available that can do the work of course the smaller jobs, there's more, you know, it just depends on what the job is. I see. But when
▶ Play
we're completing big projects like the 30 crossing perhaps, how many contractors would you estimate are available to even look at that contract? Oh, just
▶ Play
Speaker 47 1:39:23
a few. Just a few. And you have to realize that those huge projects like that, or at least 30 crossing was qualification based. Okay. I thought it was. I just, as we
▶ Play
look at all of this about the evaluation, if this committee wants an evaluation that consists of did you do the job, did it come in on time, did they come in under budget, that is a simple measure. It is a simple measure, but how do we... But do you already
▶ Play
Speaker 47 1:39:51
do that? We don't do it formally, but I will
▶ Play
say that we're going to... Even if you don't think it's helpful, if it's helpful to get them off your case, wouldn't you think that would be better to
▶ Play
Speaker 47 1:40:08
do? hello it would be helpful but don't forget there's another side it's us I understand us I am saying that
▶ Play
you've got to live with this legislature am I making any sense you're making sense just thought I'd throw that out there since we're going to beat this one to death if it's a simple checklist do the checklist and let's move on alright
▶ Play
thank you representative davis you're recognized for a question got in seat 48 all right representative you recognize thank you chair but as usual
▶ Play
Speaker 199 1:40:53
um my good senator preceded me so she said it all is is that simple senator chesterfield just said it, Director Tudor, I have to believe and know that there are already a lot of these things internally, if not formally, happening with the Highway Department in terms of the Department of Transportation, excuse me, in terms of your measurements and how you look at past performers who've done contracts and how they have performed. So now to formally put that in the form of a document or a checklist as you go forward to just take the data that you have and formalize it into a document and it becomes a record. And then that record becomes a part of, as you go forward formally, we can look at, the public can look at, and others can look at, and it's not a lot of additional work. It's just taking that work that you are, the information that you pretty much have and putting it in a format for public consumption. A report, simply a report, right. It's just, that's all it seems to be. It doesn't seem to be, Senator Chesterfield did a great job in making this as simple as possible without creating a whole lot of work and a whole lot of other strained type of movement. I see it that way now. What
▶ Play
Speaker 47 1:42:12
are you seeing? Well, I see that we're completely off of the recommendation as far as what they recommended that we do, which is, this isn't, we're not talking about the recommendation anymore. or we've moved on to maybe something simpler, a simple report. What do you interpret the recommendation to be? To implement some type of rating to adjust their prequalification amount that would adjust how much they can bid
▶ Play
Speaker 199 1:42:43
on. That was the recommendation as I understood it. Well, as I read it, it was not a mandate recommendation. It was a, to me, conceptual, a contextual type of recommendation, meaning you could not have to do it word for word. You could take what they recommended and do what Senator Chesterfield has basically simplified to a document that would suffice what the public would want to see and would also provide a measurement, a record of what they have done, a performance record. So we still would not be ignoring God House. It just may not be doing exactly what they said. But we're still moving in that direction of measurement of performance and making sure that it's recorded so that we can analyze it and use it as we go forward. And you make qualified decisions based upon performance. I mean, as someone said, if somebody had safety issues that were extreme, because there's a concept called responsible low bidder. So there is some, and in your bid docs, you also reserve the right to accept refuse. So there is some rights of you. It ain't just a low bid. So you can get a low bid from someone that you deem to be irresponsive, and you can make a determination based on that. So you have some flexibility at your behest now. So all of this I think you have already. I think you have this to provide us what we need. I think you do. Thank you. Hopefully that helped
▶ Play
Speaker 200 1:44:32
as well. Thank you, Representative, and I'll just, so
▶ Play
we can go back to the report, I think if we do decide to take this up and have, and I know that we've got some other testimony, may change the discussion some, but if you look at their implementation roadmap, that may be where we would key back in on how to move forward. So, you know, the first is exactly what everyone's been talking about, past performance, managerial ability, safety record, that was kind of their initial thresholds to be looked at development of a scoring system and then a track performance so if you were to stick with one two and three and stop on number four you know at some future point then I think I think you hit all the notes that everyone was talking about while still staying away from something that you're hesitant with right now which is the pre-qualification standards So, and then one thing, and I'll give this to you after the meeting, but we, on the state level, and there was all this procurement work that was done, and I think you referenced a couple times that y'all, you know, kind of go by the Arkansas procurement, we do allow this and actually recommend this by legislation and through rule that performance-based be utilized, and so I can give you the sections on that so that you have it, so you do have the latitude if you are following Arkansas procurement law and there's some guidelines in place already about thresholds that we recommend for state agencies and so that may be just yes useful to be able to look at in the future again I don't think that's where we're headed today
▶ Play
Speaker 47 1:46:09
but it'll be useful but yeah we need to remember that we have federal regulations we have to follow on low bid as
▶ Play
well okay thank you very much I do not see any other questions we're going to move on to recommendation number nine the part of the information technology. Can I ask a quick question? Oh I'm sorry actually I need to stop. We haven't had any of this yet but so
▶ Play
Speaker 47 1:46:43
we do have public comment we have Matt Cashin from the Cashin Company. I will say that since since the committee has decided to back off of us adjusting their pre-qualification amount based on a rating that completely changes the conversation and so that that in itself has put us into another realm a different place to be thinking so i don't know if all of this is going to be helpful now that that's no longer on the table yes sir or yes ma'am i'm saying yes sir to to
▶ Play
his point i mean i think you're going to make some comments about surety bonds we've already that was not a recommendation that was being made i think it was in the report but not a recommendation that was actually being made by guide house was never referenced and so i we welcome any testimony you'd like to provide if you'd like to recognize
▶ Play
yourself with the committee thank you very much my name is matt cashen um here in little rock independent insurance and surety agent uh just as a qualifier of a past national president of of the National Association of Surety Bond Producers, past State President of the Independent Insurance Agents of Arkansas, current Vice Chair of the Contractors Licensing Board, and have been a Surety Industry Instructor and Curriculum Writer for over 30 years. Thank you for Director Tudor for her leadership and outreach to include Surety as a stakeholder in this process. My comments aren't going to be geared at the department or at Guidehouse, but they are geared at this study that Guidehouse bases recommendation six off of and the problem I have with recommendation six I mean with the study and and I've known about this study since it came out because it is a direct attack on surety bonds just by the title performance based contractor pre-qualification as an alternative to performance bonds not as a way to improve quality and so from that premise the information in here is is a bit skewed the six-year-old recommendation relies heavily on that National Center report from 2009 so just to be clear we're talking about 11 year old data and within that data it's very limited in its scope although it's presented in such a way that the construction community nationwide is overwhelmingly in favor of performance based evaluation contract award. When you dig into the data, you realize that that survey was nine U.S. highway contractors. Not 9,000, not 900, not 90, not 19, just nine. And with the presence of Mr. Estes from AAPA and Mr. Dean of AGC, you're probably going to be able to hear a much broader sampling of contractors' opinions towards this particular process. In actuality, this report from 2014 validates what the surety industry, what I do. The report says the average DOT default rate on their construction projects is 0.46%, less than one-half of 1% of construction contracts go into default. My 39-year personal history of executing bonds to the Highway Commission on behalf of Arkansas contractors is 0% default rate. In other words, the unseen services that the surety industry provides in the background is actually working. We do pre-qualify. We are the gatekeepers. We are the ones who are allowed to discriminate. State agencies can't discriminate. Everybody's a taxpayer. These are taxpayer funds. Everybody has a right to access to them. But not everybody's qualified to have access to them. That's where we come into play. And when we make a mistake, we pay. Senator, your reference about, you know, going online and, you know, buying something with a higher rating, maybe paying a few dollars more, if you make a mistake, what happens? You're out the money, you've got to buy it again. That's not the case when performance bonds are involved. Case in point, DOT had to recently default an out-of-state contractor for abandoning a contract. And it was the surety who stepped forward and offered to, and the DOT accepted, excuse me I've been around this so long I still call them the highway department that the DOT accepted this completing contractor I happen to know who the completing contractor is I happen to know who the surety is while I was not the agent on the bond for the defaulting contractor I do represent that surety and help facilitate that marriage of a completing contractor in the DOT and I can say that the price the surety is going to pay to have that job completed and honor the obligation under their bond is substantially higher than what the state is going to pay under the contract. The contract will not go over budget, will not go under budget. It's a contract. Set quantities at set unit prices. If certain quantities overrun, yes, they'll have to be paid for at the agreed to price. If quantities underrun, they won't be paid for at the agreed to price so there's really not budget overruns or underruns like we traditionally think of another issue i have with the federal highway report is the basic lack of understanding of surety yeah and
▶ Play
just just to be clear i mean just just yeah we are not in favor they are not in favor of doing away with surety bonds and i think the report and they can speak for themselves but i think there were components of the report that they were pulling out in regards to performance based you know grading which we've went through and you know had a lot of conversation about that's even if you look at the recommendations there's no comment about surety bonds and it and it really focuses in on this pre-qualification idea you know of again just like i mean if you hire an electrician your house and they burn it down you wouldn't hire them the next week so um but but yeah so if you can just be as concise we
▶ Play
got three more big i understand let me circle back real quick to the pre-qualification then because that seems to be the issue the The pre-qualification services that the surety industry undertakes are very similar and even more extensive than what is recommended in the various reports by federal high. We do all those things. We look at the equipment utilization, their access to skilled labor, their access to resources. Yes, we look at their financial information. We look at who they subcontract with. We look at past performance. They do get graded on every job. It's called the profit margin. And those poor quality contractors don't last and stick around very long. In fact, the majority of the criteria used in the Federal Highway Study, we do that every day because we're monitoring a contractor's entire portfolio of work, not just focusing solely on what is being done at the Highway Department. We take into account everything they've done. The report itself says it's going to reduce competition, and we saw that today in the lettings. I don't know if you've seen, the department left seven jobs this morning, had a total of 17 bidders across all seven jobs, only five from Arkansas. all. This afternoon nine projects and 18 bidders, two per job, except one job didn't have any bidders at all. This report itself says performance-based evaluation limits competition. So I'm not in disagreement in trying to evaluate contractors. They are evaluated every day by our department on the job. Yes, there's room for improvement. Mistakes are made. There are people involved. I mean, it just happens. Like any business or entity, there's always room for improvement. But it's still my belief that our DOT and our Arkansas Highway Construction community is really trying to do the best they can every day on every project. We have quality in Arkansas. Recommendation 6 only addresses quality, quality, quality. I believe we have quality. We've got a quality department with quality leadership. We've got a quality spec book. We have quality roads that continue to be improved and meet the needs of our people. we have quality contractors with quality employees that risk their lives every day and if you want to go to grading a safety record how do you grade a contractor who loses two employees on one job in one day it's horrible but it was caused by a log truck that lost its load it has nothing to do with contractor. 21 injuries, two fatalities, one log truck. Highway 65 Clinton is no way the contractor's fault. He was behind concrete barrier wall. How do you grade that? The problem with the grading is that it becomes at some level subjective. I may say it's a smooth road. Senator, you may say it's a rough road. I might say it's a great bridge. You may say it's a horrible bridge. Who draws the line? What biases and prejudices do they bring to that process which will open the department up to criticism as there are circles right now who go after the department and feel like they favor out-of-state contractors for example but anyway I'll be happy to try and answer any questions and get out of the way thank you
▶ Play
very much thank you for taking time and also being our first public commenter so very much do we have any questions seeing none again thank you for your comments today and taking time to be here. Next up is Park Estes. And yes sir as you're making your comments just if you need to recap a a summary i think where we are that way we don't rehash something yeah i appreciate
▶ Play
Speaker 213 1:56:23
that and appreciate the opportunity ladies and gentlemen to be able to be here today and since we've kind of gone off in a different direction you know i've got about a two and a half minute prepared statement and most of it is going to be very redundant to what uh director tutor has said what matt cashing has said so um you know i could maybe just explain who i am kind of who i represent and hit a couple of highlights and then we'll be done with it because i know you have a lot of ground to cover and i just took up a lot of time doing that so again my name is park estes i'm the executive director of the arkansas asphalt pavement association my association has 110 companies and we represent over 7 000 employees across the state of arkansas i'm speaking on behalf of the association and and its members right now not not on the personal side and you know our opinion is that rdot currently has a mechanism of the tools in place that fairly and objectively procures bids for jobs they let to contract. And trust me, if my members thought or had a problem with the way they do it right now, they would have heard about it. You know, we just think that the recommendation, as we understand it, would not be in the best interest of RDOT, the contracting industry, and more importantly, the taxpaying public, which ultimately we all work for at the end of the day. We believe that a rating system based on the parameters suggested, such as delays, disincentives, et cetera, will be subjective in nature, and even with the best of intentions, ultimately would be reduced competition and increased costs, which we've already heard about that more than once. We also believe that the system that's in place right now to procure work for RDOT is objective, it is fair, it addresses quality consistently across the state through the RDOT specification book. Also to hit on the bonding, we're confident the performance and payment bond process adequately addresses the quality of contractor that the report is concerned with. R.DOT and AAPA have always partnered to deliver the best asphalt paving product possible utilizing the most current technology available and if we find a better way to build a project or a better way to produce an asphalt mixture, we collaborate together and incorporate it into the specification book. So just in closing, I just want to emphasize that it's important to understand as of instated more than once, there's many issues and circumstances that can arise during the job that are out of a contractor's control that could unfairly alter a contractor's performance score. So therefore, on behalf of our membership and the 7,000 employees plus across the state, I want to reiterate that AAPA and its members do not agree with the implementation of the bidding process that could easily become subjective, in our opinion, would limit competition or it would increase overhead with a measure without a measurable return on investment and with that i'll close and be happy to take any questions if there's any thank you sir do we have any questions we
▶ Play
are getting bare bones so yeah thank you for your time today sir thank you for your time and then joey dean Yes, sir, if you just recognize yourself for the committee, and welcome to make your comments.
▶ Play
Thank you so much. I will also be brief. My name is Joey Dean. I'm with the Arkansas Chapter of the Associated General Contractors of America. We're locally known as AGC Arkansas. And I just want to offer my opinion on the rating system. Our members, specifically those in the highway road and bridge construction industry have a symbiotic relationship with the Department of Transportation. RDOT depends on a strong dynamic effective and experienced contracting industry to deliver timely and quality product for our taxpayers and travelers. Conversely RDOT depends on the industry and the industry depends on RDOT for projects to compete for. This doesn't mean that we always agree on everything thing because we don't. There are effective and existing processes to be worked through to resolve any issues or disagreements that may arise on occasion. In this particular situation though we are very much in agreement. We think the procurement process is effective to ensure a quality product and efficiency. Director Tudor has done a good job explaining their processes. Mr. Cashin has further explained the extreme vetting process that's used in bonding to ensure that only quality contractors get the opportunities to bid. We feel this rating system is redundant. We feel it's unnecessary, and would likely make the procurement process more subjective and less objective. This isn't good for RDOT. It's not good for the industry, and it's not good for the taxpayer. It's been discussed, but I'm going to say it again. Every single project is different with its own variables, both expected and unexpected. It can be weather, utilities, landscape, obstacles, the economy, access to labor, traffic, material, supply chain, or even a pandemic. All these things just aren't equal, which makes the process vulnerable to opinions, flawed scoring, personnel interpretations of performance, and it's just not a good idea. You know, essentially, what this does would put RDOT as a judge, jury, and executioner over the industry. There are already safeguards in place to ensure quality, and I can assure you that the contracting industry want nothing more than to produce quality projects. It wouldn't promote collaboration, and RDOT doesn't want that power. Thank you.
▶ Play
Thank you for your time. One thing I need to circle back up to recommendation number five. I think that's one that there's a lot of places RDOT's already taken some steps and so at this point I'd just like to express interest for that to be considered with as a recommendation in the next meeting and then on this recommendation six I will go ahead and state that there's interest from subcommittee to move forward specifically with items one two and three on the implementation roadmap in regards to a grading system related to contractors all right and that brings us to information technology and it recommendation number nine and with that i'll turn it back over to guide house and did you all i think i cut someone off a minute ago if y'all had some comments um earlier i thought no i think we're okay thank you you're
▶ Play
Speaker 7 2:03:19
good do you yes thank you do you want us to go through each it recommendation on its own or shall we go through all three of them and review them let me let me ask
▶ Play
direct director would it be okay if they went through each three or would you really respond after each
▶ Play
Speaker 47 2:03:37
one? I just assume they go through all three. Okay
▶ Play
yeah we'll do all three then and then come back to questions and then RDOT
▶ Play
Speaker 7 2:03:45
responds. Okay sounds good thank you. Thanks
▶ Play
Speaker 11 2:03:50
and and I'll start and then and discuss some of the findings and then turn it over to Erin to discuss a recommendation. So there are three recommendations here in the IT focus area. recommendation nine which is around building a governance structure to help guide our rdots it investments so two key findings here uh one uh we found it with it 2.1 that rdot has not developed at least at the time of the review of governance structure uh to ensure that it investments support the business objectives uh manage enterprise risk and meet external stakeholder needs and then the second one 2.2 was around overarching enterprise architecture and from what we understand at the time of the review that there was no overarching enterprise art enterprise architecture or blueprint to standardize organize and align you know the the department's i.t infrastructure and solutions again with the business goals and needs so in So in terms of supporting evidence, we found during our review that RDoC continues to increase its IT investment and has done so at least from a budgetary standpoint from $9.2 million in fiscal year 16 to approximately $23.5 million this fiscal year 20, with some of the operating expenses and equipment costs being the biggest budget driver. So the department definitely is investing in IT as a way to help manage its operations. That being said, a review by a third-party consultant, Infotech, that the department had brought on revealed that there is an unclear decision-making process and no IT governance for these expenditures. So the budget's increasing, the investment's increasing, but it's not clear that there is a centralized governance structure to direct those investments. And then as it relates to the actual architecture of their IT infrastructure, it is siloed organizationally, at least that's what we found, with responsibility residing with each of the divisions and districts that quote-unquote primarily own their respective IT platforms and solutions. I'll talk about recommendations, the findings of the recommendation 10 and 11, and then turn it over to Erin. The second recommendation here is about implementing some midterm IT initiatives that can optimize business operations so IT 1.1 is one of the two key findings here and you know the department appears to be approaching its data center modernization you know in phases but without a formal integration plan and the department has at least preliminarily at the time of this particular review identified software needs but those efforts to align purchases across the department hasn't been universally uh implemented uh and so you know the the department definitely is moving in a new direction especially with um you know the hire of the new it director there and and they have prioritized from a data standpoint um needing to look at some of their infrastructure and some of their softwares looking at their mainframe upgrade and their oracle implementation um and and and also upgrading again some of their you know storage and server infrastructure and so they've prioritized that um that being said uh you know there's still some work so right now the department deploys about 263 software applications and has about three over 300 uh databases and and there's an unknown amount of data that's stored locally on staff computers um and again there is not that formalized program beyond some of those infrastructure or upgrades to address these applications and these databases and potential ways to sort of rationalize and streamline that number and that set of data. And so those internal strategic planning documents that they have reveal that there is that lack of alignment between those IT application purchases because there are so many databases out there and they're not potentially connected and there's an unknown amount of data, that there is poor data quality and there's difficulty accessing data. We did note that in fiscal year 19, that there were several instances in which there was some significant IT spend, but the IT department or division was not involved upfront in the decision making around those purchases. And then lastly, recommendation 11 is developing some of those necessary pillars establish you know IT is that effective business partner and that's a little bit of a longer term recommendation and there are two key findings that that are related to this 2.3 which is that the department at least at the time of the review did not have a service catalog and defined service level expectations so it was not clear at the time you know what services the IT division will deliver you know when and and how support is actually distributed and and uh second you know secondarily as it relates to um uh the it division and and being able to support the business that they they have you know made some strides obviously in establishing a project management infrastructure to ensure that effective delivery of it projects but at the time of our review was was still very much in its infancy so uh some of the supporting evidence again the internal strategic planning documents that that they had revealed a lack of clarity around some of the services that that it offers there did not appear to be any service level agreements around um you know when um it would deliver specific services or performance against those you know service level agreements um i did mention this before uh they they you know they have restructured their it department so that it does include that project management office but at this point or at least at the point of the review they had not adopted a formal set of project management standards or protocol to help drive that that delivery and with that i'll turn it over to erin to discuss the recommendations
▶ Play
Speaker 7 2:10:04
thanks other okay so with respect to recommendation number nine uh where rdots IT strategic plan initiative was right on track in calling out the need for implementation of an IT governance structure as a necessary objective. RDoS IT investments grew 155 percent between 2016 and 2020 and or I guess actually that should say 2000 well I guess it's fiscal year 2020 and their investments in IT continue to grow. It'll be it will be critical to lay the foundation for decision making around IT purchases and projects that involve a cross-functional group of RDOT personnel. So not just IT, not just engineering, lots of personnel across the business unit to represent the various perspectives. From an impact perspective, governance typically yields increased capacity, performance, and improves business outcomes. And when you think about how that actually happens it's really done by ensuring that a product that it gets procured or a project request aligns with the core competencies of the IT division so IT is there to represent themselves and say that they are capable of supporting the thing that is being purchased that they are within the standards that are set by the the division of the IT team and that they are a manageable level of risk and that again they align with the business objectives of the agency when we think about considerations good governance requires top-down support and active engagement so you really want leadership participation in the it governance program it requires active tracking of requests and communications related to performance so you want to be able to show people what is actually happening once you've put governance in place. You've got to be consistent and you have to have processes in place to support those kinds of things. And again it could be a tight coupling with department-wide business goals as well as IT goals and capabilities. Those two things can't be in conflict. That's really the objective of standing up an IT governance structure. As with Sager, we're going to mostly skip over the implementation summary for each of these slides and we'll focus on implementation in a bit. So with respect to leading practices, there are well-documented sources for IT governance. COVID and ISIL are the most widely adopted IT governance frameworks. You can literally search on the internet and find many many uh documents and uh approaches and plans to actually implement those frameworks um and you know they are available by general consumption um by rdot it very easily accessible so in terms of an implementation roadmap there are really three key activities uh the first is to lay the groundwork um and then establishing a governance structure and creating finally and and executing a governance roadmap so we know that in the 2019 strategic plan it called for implementing a governance structure and we would suggest that RDOT evaluate a current IT model their current IT model so they need to understand what where they are and where they hope to be do they want to be centralized meaning all IT lives within the IT division authority nobody else is providing procuring IT services those distributed databases the daughter was talking about for the current state assessment they wouldn't live other places they would be strictly with withheld by the IT division they could also be decentralized in which case the central IT would manage some activities and others would support their own and then finally federated federated is a very complex approach and really it is focused on like much larger operating models much larger institutions like statewide governance where you have very different business units trying to solve similar challenges and so they buy into kind of shared frameworks but not technology um we would also suggest that rdop set some goals for the structure that they want to adopt and then get buy-in from others on that approach so you know if they're if they are decentralized now do they want to be centralized and you know get some some buy-in to make sure that everybody agrees that that's where they're headed and then evaluate their most common framework so again we talked about COVID and ITIL. CMMI is a capabilities maturity model and integration and basically it's really a great way of evaluating their actual maturity for IT. Maybe a good place to start and then think about one of the others as a framework to actually adopt. And then they'll want to work on establishing a governance structure that would start with identifying members so again we've talked about having some leadership across the agency that will participate in the process and again we're the objective of that is to make sure that IT understands what the business needs are and the business team understands what IT is capable of achieving and supporting and that they have shared goals and recognize their shared business challenges. A leading practice for governments is to make the IT and business frankly is to make the IT leader part of the executive team. Again that just really focuses on that alignment instead of making IT feel like a support entity. It really helps get them part of the executive engagement and problem solving. and then once the governance team is determined it'll be important to document responsibility rules of engagement outputs and inputs for decision making and to who and what the governance applies so we apply it to security purchasing data management project portfolio decisions all of those kinds of things and then from a creating and executing a governance roadmap this is really know putting that governance model to work it may mean developing subcommittees to address the different areas that you're applying governance to it would be thinking about reporting requirements so that you're actively communicating with stakeholders across the agency and then finally thinking through the performance metrics and the communications around what the governance team is doing and what it is achieving through those governance models i think we can move on uh number 10 is to implement some midterm it initiatives that can optimize business operations so really this is aimed at helping the department take some steps that will protect them and help them optimize operations so you know soccer was saying from a current state perspective there are you know three hundreds of databases lots of data sets that are not necessarily fully documented and hundreds of software applications so there's some risk associated with having all of those and there's additional cost probably associated with all of those and so ultimately we're suggesting that the department inventory data systems and applications and evaluate the purpose for each of those along with the risk profile the it division's ability to support those and any duplications so with respect to impact of this rationalization project obviously you can expect some cost savings we reviewed a report that quoted a gartner analysis indicating that application rationalization this process of inventorying and thinking about the need of the applications you have combined with some business process optimization can yield an average of 20 cost savings per year so if you apply that to rdots 2019 spend at 5.3 million rationalization could save rdot a little over a million dollars just in 2019 alone data management we've documented has already saved the agency about 600 000 and obviously we would expect that to grow as we you know collapse some of those databases and the need to support those so it's not just the database itself it's the hardware and the personnel that go along with each of those that are required to support them and then data better data quality can be normalized to help the department with analysis and reporting and public information we've talked a lot about the availability of data for trends evaluation for public information there's a lot of those recommendations that we've been talking about are tied up into normalized data and being able to produce those that data in a meaningful way and make sure that the different data sources all say the same thing about a particular data set and then also finally this rationalization project should reduce the risk to the department related with for example software producers doing look back audits related to licensing if they find unlicensed software they will come back to the department and ask them to pay for license costs for whatever period of time that that software has been operational it should also reduce security risk associated with uh with with applications that may not be fully inventoried or managed um and frankly the same is true for hardware assets so it's important to really have a full um purview of your your i.t assets to understand what your security risk um and frankly your disaster recovery risk is for all of those so from a considerations perspective it's worth noting that some upfront investment is really likely necessary first the purchase and configuration of a tool to support this rationalization is is a valuable effort imagine with all of those different data sets and frankly the databases and then the data sets within them we're talking about you know millions and millions of rows of data and having a tool to help analyze that and begin to rationalize it and normalize it is going to be really important and the same is true for those applications so having a tool to help support that inventory and classification is really important it sounds like the department has already begun to work with a consultant on the effort to actually do the inventory and classification um it there is a probably a new effort beyond just their day-to-day work that they're doing today to go through that classification and assessment efforts and then rationalization is likely to require terminating some applications and data sets which means that there's going to need to be some communications and some change management around getting buy-in uh to the stakeholders for each of those due to adopting the new approaches and turning off those applications again i'll skip implementation here so let's really focus on leading practices i'm going to focus on the last bullet where the the dots are are providing open data portals you'll recall that one of our early portfolio recommendations is to publish the status of construction projects and so when we when rdoc can get to the place of having rationalized normalized data they should be able to expose that data in an open data portal for example that would help with the function of actually reporting around the construction projects on their website but also give citizen application developers the opportunity to build solutions for them as well and publish those and it's you know that's a a big trend over the last 10 years or so that you know accessible open data means that that technologists out in the world are democratizing that data and making it useful as well and it's not all in the department to do that and so from an implementation roadmap there are three key steps here one is to build an inventory of applications and databases number two is to assess the applications and databases from that inventory and then finally number three will be develop a target state so with respect to building the application inventory and the database inventory are not should determine some early data governance and application standards so what we mean here is to say that they should work with that governance team we just talked about to think about what an end state could be thinking about the risk expense of applications supportability the you know portfolio need that they're going to have for each application and then inventory the applications and databases and indicate each is fit for the standards we've talked about then discuss the database and applications with stakeholders to evaluate necessity and impact and then review the materials that they have reached because if they if there's no good documentation for them that's going to make them more difficult to maintain in the long run they'll also need to classify each by their function so who does it support what does it do then with respect to assessment of the inventory think about this as developing an executive and executing a scoring method for each application in the database again thinking scoring it for availability or ability to support it so in other words can the IT team actually keep the lights on on this thing what the security risk might be it be for it any other risk disaster recovery for example total cost of ownership is there duplication of this application functionally does it serve the same purpose as something else that already exists and then the scoring is going to have to be applied to every single application and every single database and every data set it's a it is a substantial lift to go through this this process so the long run cost savings and risk reduction um typically are are described as being worth it by industry standards and then finally rdott will need to set a target state and develop a plan and execute against it for the various scored applications so once they've identified standards once they've assessed the applications the rdot governance team and it will need to determine the high level data architecture thinking about how to structure data for optimal access and use determine an end state for each and every application and so when we talk about in state we're talking about does this application need to be re-engineered does it need to be migrated to something else or the data within it needs to be migrated to something else some things will be continued as they are and then some things will just need to be eliminated so finally the implementation for each application and status will need to be executed right so it's one thing to you do the inventory you do the assessment you make some determinations about what you're going to do with it and then you actually go about retaining re-engineering migrating or continuing as is with each of those you should it's also worth noting that the department should maintain that inventory so that inventory is not a one-time deal every time you add an application every time you add a data set it should go into that inventory it should look at its purpose all those kinds of things for long-term tracking this is a this is a lifelong i.t uh project it's not a one-time deal um otherwise you're gonna have to repeat it and if you can if they go through the process of doing it the first time and then maintaining it um then then you know this process should be avoided and the risks that are associated with having unrationalized applications and data will improve their occurs or which would go away okay last one this is uh number 11 which is to develop the necessary pillars to establish IT as an effective business partner this last recommendation is really um tying the two things that we've talked about already um building governance and uh getting to a place of having some standards um and building some processes around those um so we're when we've this is talking about establishing more formalized i.t project management and an i.t service management framework coupled with the tools that will enable that those functions so when we talk about an IT service management framework we're really thinking about how does the entity respond to an incident how do they handle or an outage for example if the outage can if the same outage happens over and over and over again how do they address that how do they release new things into the environment how do they handle disaster recovery and business continuity those are the kinds of functions of an IT service management process and when you stand up those functions and you stand up more formalized IT project management you should get better customer service better customer satisfaction more transparency and a better more operation more effective operations for the IT program. So you know we've talked here kind of below there's the 42 percent and the 26 percent. We talked about this 26 percent versus six percent measure before where entities that have more mature project management processes tend to have about a 26 cost savings versus those that have less mature pm infrastructure so i won't belabor that one but with respect to the 42 here from an impact perspective you can get 42 of your business colleagues from an ip perspective to say that you have reduced business costs and you're not a cost center and then you know you're doing things right because typically i see it as a cost center in a support entity rather than a business partner that's delivering business value and reducing business costs um so then from a considerations perspective uh we think implementation should focus on delivering and developing a service catalog um that's really a menu of services and and then having a request tracking capability so um you know here's the menu here here's how you order it um those are big wins for the department uh it division we believe um project management of this implementation effort across it projects should be considered and finally building awareness and buy-in from department stakeholders will be important right now there are people that are able to procure things themselves there are uh you know different channels to receive technology support and so going through the process of having people order from the service catalog might be a different approach than they're used to taking and so it's going to take some communication and training to get people to adjust to this new way of ordering from a leading practice perspective IT service management frameworks are well documented and training is widely available um including itil which is you know the basis for the texas department of information resources and the indiana office of in office of technology easy for me to say service management uh frameworks that we've referenced in our recommendation um and and frankly those are widely accepted um or itil is widely accepted across industry both from a governance public sector perspective and commercial sector perspective um the entities and that we've uh talked about here with respect to texas bir and indiana office of technology they have published materials that rdot could use to help stand up their processes and procedures as reference points and frankly there are lots of again published materials all over the public sector that can support RDOT in this process. So from an implementation perspective, let's talk about the three pillars here which are establishing baseline standards and policies, selecting appropriate software and tools, and then establishing a long-term ITSM plan. So with respect to to the baseline standards and policies, we wanna understand and identify the framework that will support IT project management and service management. From a PM perspective, RDoC should evaluate different project and portfolio management frameworks that support the different kinds of work. So there are lots of entities that leverage waterfall. It's kind of a more traditional project management method. Agile is kind of a buzzword thing in the industry that is really good for product development, configuration-based projects, things that have kind of a quick turnaround that need a lot of customer interaction and buy-in. And then there are lots of hybrid versions that try to combine the two to reduce the risks associated with them. So then one identifies the tools that support them. So there, and when I say tool, I don't necessarily need a software tool. I mean, the actual like documentation kinds of tools that will support them. the specific processes, again, inputs and outputs and those kinds of things. We've referenced the Texas Department of Information Resources PM Lite as one example. Again, that's widely available through the internet. They also have a more comprehensive project delivery framework that has a very exhaustive list of things to do and the steps to take and sample documentation. They also need to train their internal IT staff to use the tools and processes and help other division stakeholders to adopt the tools. IT service management includes things like how to we've already talked about that sorry pardon me I'm going going through my notes quickly here trying to to get through the meeting uh and it's the interest of time for everybody uh they'll need to enter the they'll need to create some standards and service expectations and apply performance metrics to those so think about documenting and communicating them they'll need to think for example they'll need to say for example you know you can expect us to create a new user in 24 hours once you've created this created and completed the form so the idea here is to build a service catalog that menu that we were talking about and say this is what i can do these are the the list of the things that the IT division can support this is what you can the turnaround time you can expect from us this is how we'll support you and these are the requirements that we need back from you in order to make that sort of thing happen the next step is to identify the tools that will support these activities so we've talked about adopting a specific framework there are lots of software tools that support different ITSM frameworks we understand that the department had been through the process of procuring an IT ticketing system oftentimes these IT ticketing systems are larger are part of larger ITSM systems and RDOT should evaluate expanding the use of that tool to do more than ticketing and adopt the larger ITSM framework provided this recommendation goes through and then finally they'll want to set a road map for where they want their ictm and icsm capabilities to be so thinking about the growth areas the training that's going to be required for those continuing to evaluate demand and incorporating demand and new capabilities over time into that service catalog that menu and ordering procedure and then providing the appropriate change management programs as they move forward so in other words every time they they put in a new capability into the service catalog every time they configure the ITSM tool to do something else that allows for self-service for example they're going to want to make sure that their end users within the department understand how to use that that tool and understand what the new capabilities are. I think that's it. Thank
▶ Play
you. Great job and thank you and with that we do not have any questions
▶ Play
Speaker 47 2:36:01
so i'll turn it over to director okay thank you guide house recommendation nine we will continue our efforts to establish a formal governance structure to assist the it division to accomplish this recommendation guide house recommendation number 10 we will continue our efforts to develop an inventory and determine value of our applications and investigate consolidation opportunities and guide house recommendation 11 we will continue to implement the new information technology service management application that will accomplish this recommendation and that's my response thank you director
▶ Play
and also appreciate all the amens and head nods in the back of the room so sounds like this is something that we're very much on the same page as far as how to move forward and so that I think that's great great news members you know I said I was going to pass over and then come back to recommendations seven and eight from last week which is where we would actually take a vote we do not have a quorum we don't have enough members to really do that and one of the other items was the discussion item in relation to an oversight or advisory body since then we've received a memo from the department Arkansas or RDOT in in which they would like for this body to be the one that does help to oversee. I think that makes sense. There's some changes that would need to occur legislatively to allow that authority to exist, even for this body. If not legislatively, then at least on the council level, to allow those additional things to be for. And one thing, and I'll just tell you, one of the reasons that I felt like we needed some other body created or oversight was I want to make sure that we have public involvement as these things move forward, and there needed to be a forum for that and allow, you know, various groups with their representation, much like happened today, you know, make their comments, give their feedbacks, make sure that we're all on the same page. And I think you've seen kind of through this process that we can, you know, there's a very different perception between maybe how I read a recommendation, how the director reads a recommendation, and Senator Rice, I mean, all of us are perceiving a little bit differently. And so those are conversations that really need to be worked through because we can agree on the general, you know, two sentence bullet points. But how we get there, we may not fully agree or even understand the different directions or perspectives. And again, that's one reason I was thinking there needed to be something that was a little bit more inclusive. But we could be the facilitator for that. And it kind of goes back to what we talked about earlier in the meeting where you were talking, you know, I think there was some language, maybe it said consider or we'll begin working on or whatever it is whatever it was and we had a we had a conversation about well where's the public comment or how's the public comment going well there's not a venue for that yet and we're well on our way or the department is to implementing some of these items but as a for instance the call centers we were able to work through some of that discussion where we weren't really asking for a call center but more you know a more structured way of how those calls were routed so they were getting to the right place we just need to have some further conversation i think mayors uh county judges would like to be a part of that conversation at least be able to provide their input i think contractors clearly want to be a part of the conversation um so if we could we can't take any action today we can have further conversation on this today but uh maybe you know department and the commissioners can get together and kind of let us know what they see to be that public comment allowance as we move forward with the recommendations. So with that again, so next week, and I'm going to make sure I'm okay to do this, I mean, we'll just have to consider at the beginning of the meeting, you know, recommendations 7, 8, 5, 6, 9, 10, and 11. Okay. All right. Can I ask a question? Yes, ma'am. do you need me
▶ Play
Speaker 47 2:40:08
to come prepared to say anything next meeting or i mean what you just said do i need to respond to that at the next meeting or is that i mean i think that would be i
▶ Play
was hoping that was a conversation we could have today and maybe even look at taking some action but we don't we don't have the members to take action and i'm not going to ask for a vote in a putting public involvement into yeah yes i mean so i mean if i listen to the recommendations what What you hear over and over is, you know, there needs to be a formalized process for a number of different things. And I think there needs to be input on how that's set up and how that's formalized so that it accommodates everyone as much as possible. And then also gets us to the outcome that we'd like to see. Yeah, and so, you know, my perspective would be that that public comment occur here, that we allow the public, as we work through these status reports, whatever it may be, we allow the public to engage and let us know what they want to see on a dashboard for instance or what they think a call center should look like or you know whatever it may be you just go through you know I mean on the there was some today and I'd have to pull it back but you know there were some discussion of things that haven't been started yet that you're fixing to start but I want to make sure we have public comment before we get too far down the road and get away from what I just want to make sure we're
▶ Play
Speaker 47 2:41:35
all on the same page okay so is that my
▶ Play
homework yeah I think it's all of our homework to some degree but I think you all had the memo recommendation you know recommending that this committee be the one and it dovetails off of that recommendation to some degree okay all right with that do we have any other business any other comments or Questions? Seeing none, we are adjourned.
▶ Play

Agenda

A. Call to order

5:22 - 5:48 1 segment 1 speaker

B. Update from previous meeting

C. Procurement Recommendation No. 5: Implement efficiencies in procurement and purchasing (Recommendations Report, pp. 27-30)

5:48 - 42:17 106 segments 9 speakers

D. Procurement Recommendation No. 6: Implement construction contractor performance measurement (Recommendations Report, pp. 31-33)

42:17 - 2:03:07 223 segments 14 speakers

The department’s Director (Speaker 11) presented Recommendation 6, explaining that the current pre-qualification and bonding processes do not reliably screen for construction quality, citing FHWA and NCHRP studies, and outlined a four-step, phased roadmap for a contractor-performance measurement program. [42:24] [42:59] [43:34] [44:10] [44:46] [45:20] [45:50] [46:23] [46:59] [47:29] [48:01] [48:33] [49:04] [49:37] [50:10] [50:47] [51:17] [51:51] [52:27]

Committee members, led by Senator Dismang, sought clarification on the underlying data-questioning how many DOTs were surveyed, which states had adopted similar practices, and whether a performance-based pre-qualification guarantees higher quality-and were told the studies covered 52 DOTs, identified six states (FL, MI, OK, UT, VA, WA), and that no explicit quality guarantee exists. [52:56] [53:00] [53:32] [53:52] [54:06] [54:16] [54:18] [54:24] [54:40] [55:05] [55:15] [55:53] [56:08] [56:12] [56:25] [56:59] [57:05] [57:21] [57:34] [57:40] [57:59] [58:12] [58:36] [58:45] [59:01] [59:17]

The Director explained that RDOT already uses an administrative pre-qualification system with liquidated-damages restrictions and argued that adding a performance-based rating would require substantial new staffing, risk subjectivity, and entail significant implementation costs; Senators expressed mixed views, with Dismang favoring a non-punitive informational grading system and others (e.g., Senator Hendren) seeing accountability benefits, prompting the Director to propose limited stakeholder consultations and caution against using any rating to limit bidding eligibility. [1:03:42] [1:04:14] [1:04:46] [1:05:17] [1:05:51] [1:06:25] [1:06:55] [1:07:28] [1:07:59] [1:08:31] [1:09:02] [1:09:34] [1:10:07] [1:10:43] [1:11:14] [1:11:48] [1:12:18] [1:12:54] [1:13:29] [1:19:43] [1:20:03] [1:20:34] [1:21:05] [1:21:36] [1:22:08] [1:22:39] [1:23:12] [1:23:35] [1:23:49] [1:24:13] [1:24:21] [1:24:54] [1:25:09] [1:25:19] [1:25:27] [1:25:56] [1:25:59] [1:26:30] [1:27:05] [1:27:42] [1:27:49] [1:28:07] [1:28:16] [1:28:25] [1:28:51] [1:29:21] [1:29:53] [1:30:25] [1:30:31] [1:30:54] [1:30:57] [1:31:12] [1:31:30] [1:31:36] [1:32:02] [1:32:07] [1:32:17] [1:32:27] [1:32:36] [1:33:06] [1:33:18]

After testimony from DOT representatives describing current low-bid limits and potential performance criteria (on-time, on-budget, safety, managerial ability) and public commenters questioning feasibility, subjectivity, and competitive impact, the chair concluded that the committee will adopt a limited grading approach by proceeding with the first three roadmap items, deferring broader implementation and moving to the next recommendation. [1:33:42] [1:34:13] [1:34:46] [1:34:58] [1:35:19] [1:35:52] [1:36:12] [1:36:29] [1:36:38] [1:36:46] [1:36:51] [1:36:58] [1:37:04] [1:37:12] [1:37:31] [1:37:36] [1:37:55] [1:38:01] [1:38:09] [1:38:32] [1:38:39] [1:42:29] [1:42:43] [1:48:07] [1:48:39] [1:49:13] [1:49:48] [1:50:19] [1:50:53] [1:51:24] [1:51:54] [1:52:00] [1:52:25] [1:52:39] [1:52:55] [1:53:26] [1:53:57] [1:54:29] [1:55:05] [1:55:39] [1:57:18] [1:57:51] [1:58:24] [1:58:57] [1:59:15] [1:59:36] [1:59:47] [2:00:07] [2:00:40] [2:01:11] [2:01:45] [2:02:15] [2:02:49]

E. Information Technology Recommendation No. 9: Build an IT Governance Structure to guide ArDOT's IT Investments (Recommendations Report, pp. 46-48)

2:03:07 - 2:17:22 32 segments 4 speakers

The chair asked whether the committee should review each recommendation individually or discuss all three together and the members agreed to cover all three before taking questions. [2:03:19] [2:03:23] [2:03:31] [2:03:37] [2:03:40] [2:03:45]

Speaker 11 presented the findings for Recommendation 9, noting that RDOT lacked an IT-governance structure and enterprise-architecture blueprint despite a 155 % increase in IT spending and that responsibility for IT platforms was siloed across divisions. [2:03:56] [2:04:34] [2:05:09] [2:05:41]

Speaker 7 then explained why establishing an IT-governance structure is critical, describing expected benefits such as improved capacity and risk management, citing common frameworks (COBIT, ITIL) and outlining a three-phase roadmap of groundwork, governance establishment, and roadmap execution. [2:10:04] [2:10:39] [2:11:10] [2:11:44] [2:12:16] [2:12:47] [2:13:23] [2:13:55] [2:14:30]

F. Information Technology Recommendations No. 10: Implement mid-term IT initiatives that can optimize business operations (Recommendations Report, pp. 49-52)

2:17:22 - 2:26:55 17 segments 1 speaker

Speaker 7 introduced Recommendation 10, arguing that a mid-term IT rationalization effort could generate roughly 20 % annual cost savings-about $1 million on the 2019 $5.3 million IT spend-by inventorying and consolidating applications and databases. [2:17:49] [2:18:21] [2:18:53]

He detailed the anticipated risk reductions, including lower licensing exposure and improved security, and emphasized the need for an upfront tool to support the inventory and classification process. [2:19:26] [2:20:01] [2:20:32] [2:21:03] [2:21:39]

The proposed implementation roadmap was broken into three steps: building a comprehensive inventory, assessing each asset against risk, cost and redundancy criteria, and developing a target state with decisions to retain, re-engineer, migrate or retire each item. [2:22:50] [2:23:23] [2:23:58] [2:24:33] [2:25:04] [2:25:36]

No formal vote was taken, but the presenter noted that RDOT has already engaged a consultant to begin the inventory and classification work. [2:21:03] [2:21:39] [2:22:13]

G. Information Technology Recommendation No. 11: Develop necessary pillars to establish IT as an effective business partner (Recommendations Report, pp. 53-55)

2:26:55 - 2:37:39 21 segments 3 speakers

The committee did not vote on the recommendation but the director later affirmed that the agency will continue work on Recommendations 9, 10 and 11 as outlined in the discussion. [2:36:01] [2:36:10] [2:36:43]

Speaker 7 outlined Recommendation 11, focusing on establishing formal IT project-management and service-management frameworks (e.g., ITIL) to improve incident response, disaster recovery, and overall customer satisfaction, citing potential cost-savings of up to 42 % for the agency. [2:27:19] [2:27:51] [2:28:27] [2:28:58] [2:29:36]

He described three implementation pillars: defining baseline standards and policies, selecting appropriate tools, and creating a long-term ITSM roadmap that includes a service catalog, request-tracking, and training for staff and stakeholders. [2:31:15] [2:31:46] [2:32:19] [2:32:50] [2:33:20] [2:33:55] [2:34:30]

The discussion highlighted the need for a service catalog with clear turnaround times and performance metrics, and suggested leveraging existing public-sector resources such as Texas DIR’s PM Lite and ITIL guidance. [2:35:06] [2:35:36] [2:35:56]

The chair thanked the presenters and the director confirmed that the agency will continue efforts to implement the governance structure, inventory applications, and the new IT service-management system as part of Recommendations 9-11. [2:36:01] [2:36:10] [2:36:43]

H. Other Business

2:37:39 - 2:42:03 12 segments 2 speakers

Chair Senator Dismang opened a discussion on the need for a formal public-comment process and a broader forum to gather input from municipalities, county judges, contractors and other stakeholders on how the recommendations should be implemented. [2:37:48] [2:38:21] [2:38:53] [2:39:23] [2:39:56]

He noted that the committee lacks a quorum to take formal action on the recommendations at this time, but emphasized that establishing inclusive procedures for public involvement is a priority before moving forward. [2:40:20] [2:40:26] [2:40:59] [2:41:31]

Committee members agreed to continue the conversation in future meetings and to coordinate with the department and commissioners to develop a mechanism for public feedback on dashboards, call-center designs and other deliverables. [2:41:35] [2:41:38]

I. Adjournment

2:42:03 - 2:52:03

Speakers

Senator Jonathan Dismang Chair Unverified
79 segments
Speaker 7
57 segments
Speaker 11
74 segments
Speaker 1
1 segment
Speaker 47
118 segments
Senator Gary Stubblefield Unverified
7 segments
Speaker 81
1 segment
Senator Terry Rice Unverified
9 segments
Speaker 107
1 segment
Speaker 134
1 segment
Speaker 149
1 segment
Senator Jim Hendren Unverified
13 segments
Senator Linda Chesterfield Unverified
16 segments
Speaker 199
7 segments
Speaker 200
1 segment
Matt Cashen Unverified
16 segments
Speaker 213
6 segments
Joe Eating Unverified
5 segments