JBC-PEER Review

January 27, 2021 ·8:30 AM ·Room A, MAC ·32:43
Video Transcript 16 documents

Summary

Machine transcript

May contain errors. Verify important quotations against the official video.

About transcript accuracy
Source
Whisper
Model
ggml-large-v3-turbo.bin RTX5060
Processing date
October 18, 2026

F. Pay Plan Holding Account Transfer Request 2:39

Speaker 6 presented three performance-fund pay-plan holding-account transfer requests-$9,220 for the State Board of Optometry, $150,000 for the Minority Health Commission to reclassify nurse registrations, and $107,000 for the Public Defender Commission for performance and insurance premium increases-totaling $266,220. [2:42] [3:06] [3:38]

Representative Monte Hodges moved that the items be approved and the committee adopted the motion without objection. [4:00]

G. Review Requests Methods of Finance 4:10

Speaker 6 outlined five finance requests for capital projects under $250,000, including $269,144 for ASU Jonesboro stair repairs, a $3.3 million STEM lab upgrade at UA Pulaski Technical College funded by reserves, grant and rainy-day funds, $1.1 million roof work at South Arkansas Community College, $3.87 million for UAMS Hart Electrical System Lab, and $898,162 for a UAMS cafeteria renovation. [4:12] [4:44] [5:26] [6:00]

Speaker 12 moved that the methods of finance be approved and the committee adopted the motion. [6:14]

H. Review Requests Discretionary Grants 6:19

Speaker 6 presented two discretionary grant proposals-a $685,024 fully-federal health-department grant to train pharmacists in chronic-disease assessments and three identical Department of Human Services grants to fund medication-assisted treatment for opioid use disorder-and the committee heard no questions. [6:20] [6:30] [7:02] [7:25]

I. Review Requests Service Contracts for Legislative Review 7:30

Speaker 6 introduced a series of construction-related service contracts, including a $100,000 on-call maintenance addition for the Building Authority, a $28,084 amendment for the State Police architectural services, and an on-call architectural contract for UA Community College, and Representative Monte Hodges moved that the items be approved. [7:32] [7:53] [8:27] [8:58] [9:12]

Senator Kim Hammer questioned the State Police contract amendment, and Lindsey Williams explained that the change orders were driven by unanticipated design issues and a newly acquired CDL testing pad that avoided leasing space at ASU Newport, resulting in negotiated fee reductions. [9:17] [9:22] [9:36] [9:47] [10:07] [10:09] [10:43] [10:57] [11:10] [11:20]

The committee then reviewed intergovernmental and out-of-state contracts, during which Senator Joyce Elliott sought clarification on a $75,000 education-department amendment for private/parochial school assessments; staff clarified it was a one-time use of COVID-era federal funds. [12:09] [12:26] [12:58] [13:31] [13:36] [13:41] [14:02] [17:11] [17:19] [17:28] [17:32] [17:38] [17:41] [17:47] [17:51] [18:00] [18:18] [18:26] [18:34] [18:58] [19:07]

Finally, Representative Monte Hodges and Senator Ronald Caldwell debated a large $18.6 million amendment to the Corrections Department’s energy-performance contract, with Caldwell noting the project had already exceeded its guaranteed savings by 30 percent and outlining phase-two expansions; the committee approved the contracts without objection. [19:31] [20:06] [20:40] [21:11] [21:43] [22:19] [22:24] [23:00] [23:06] [23:31] [23:38] [24:04] [25:15] [25:23] [25:45] [25:55] [26:26] [26:51] [27:00] [27:29] [27:36] [27:58] [28:12] [28:35] [28:42] [28:55] [29:14] [29:22] [29:46] [30:08] [30:24] [30:33] [30:55]

Official video page ↗

Transcript

Transcript available SliQ live captions ✓ Whisper ✓ Download .txt
Machine transcript

May contain errors. Verify important quotations against the official video.

About transcript accuracy
Source
Whisper
Model
ggml-large-v3-turbo.bin RTX5060
Processing date
October 18, 2026
Unknown speaker 0:00
Thank you. Thank you. Thank you. Thank you. Thank you.
▶ Play
okay good morning everyone we're gonna go ahead and get started uh part two of uh pierre uh so kathy you want to get
▶ Play
Speaker 6 2:42
us going here yes sir mr chairman i believe your packet will begin on item f which is where we left off yesterday these are performance fund pay plan holding account transfers these are requests made by agencies to increase spending authority to pay regular salaries extra health, and personal services matching our report on a transfer from a performance fund. On the second page of this part of the packet is three requests that are coming in today, totaling $266,220. The first one is the State Board of Optometry requesting $9,220 due to salary adjustments. The second one is the Minority Health Commission requesting $150,000 due to changing the way they pay to register nurses. The position has gone from professional fees, contracting an employee, to having an individual which will be paid through regular salaries and match. And the last one is the Public Defender Commission requesting $107,000 due to performance increases and insurance premium increases. And so these are the requests today on the pay plan holding account. Are there any questions? There's no questions.
▶ Play
These items stand approved. Mr. Chairman,
▶ Play
Speaker 6 4:07
the next group, item G, these will be our methods of finance. And these are going to be capital expenditures for the purchase or construction of all lands, buildings, structures, utility systems, et cetera, that have not been previously approved by the General Assembly. They come either before this committee or ALC for advice and recommendation, and these requests are going to be projects less than $250,000. On the first page of item G is the letter from DFA sending over five methods of finance. On the next page is the summary of those. The first one is ASU Jonesboro Collegiate Park Buildings. They are working on stair repairs, $269,144. The agency reports that they have university reserves set aside to pay for that. UA Pulaski Technical College STEM Project to add lab space and update facilities, add code-compliant ventilation, electrical services, roof work, floor drains, etc. This is $3,300,000, and they report that they have reserve funds, 9%, a grant from EDA for 76%, and then rainy day funds to cover 15% of this project. Number three is South Arkansas Community College for Campus Deferred Maintenance. One of the things they reported is that they'll be doing some re-roofing of some buildings, $1,100,000. and they note that they have cash funds from unexpended plant funds that are available for this. UAMS has the last two, number four and five. The first one is for the Hart Electrical System Lab, $3,870,205. They have clinical reserves set aside. And then finally, number five, UAMS central building cafeteria dish room renovation $898,162 that also is coming from reserves and revenues for UAMS those are the methods of finance on today's agenda are there any questions committee not these
▶ Play
Speaker 12 6:14
items stand approved mr. chairman the next
▶ Play
Speaker 6 6:20
group are our grants these are discretionary grants and we have two today one from the health department and one group from the Department of Human Services on first page is the health department this is one for six hundred eighty five thousand twenty four dollars this one is a hundred percent federally funded with Harps food stores to partnership between work sites communities pharmacies and primary care providers the aim of the project for them is to train local pharmacists to provide diabetes heart disease and other chronic disease assessments counseling and medication therapy management for individuals within a targeted county. And on the next page are grants from the Department of Human Services. There are three here. They too are all 100% federally funded. And they are all the same. They are with different locations throughout the state to provide medication-assisted treatment to uninsured and underinsured diagnosed with opioid use disorder. And those are the discretionary grants on today's agenda. agenda. Are there
▶ Play
Speaker 9 7:25
any questions committee? If not, these
▶ Play
Speaker 6 7:32
items stand approved. On I, this is our section dealing with contracts, services contracts. The first page, item I, page one, is a letter from OSP noting that the contracts being sent over for review today by the legislature have been submitted for legislative review and the contracts submitted appear on their face to be lawful and are therefore submitted for this committee the first one the first group that we look at are construction related contracts on i1 page two number one this is building authority this is an on-call maintenance and renovation contract that they are adding a hundred thousand dollars to an existing contract the second one is the state police this is an existing contract this is amendment 15 to this this is with Wittenberg this is adding twenty eight thousand eighty four dollars to existing contract and this is the contract they have for architectural and engineering services for construction of four sites for troop headquarters around the state they noted that this particular contract and this adjustment being made is for the Newport facility which added a CDL pad and so they're making adjustments and doing additional architectural engineering work for that on the next page UA Community College at Moralton this also is an on-call architectural contract an original contract for a hundred and sixty five thousand dollars for those services and those are the construction like related contracts on today's agenda when I have any questions
▶ Play
Speaker 11 9:12
I stand approved. Oh, I'm sorry. Senator
▶ Play
Hammer, you have a question? Do you think I'd get
▶ Play
a question from the state police, please, on number two?
▶ Play
Please recognize yourself for the record, please. LINDSEY WILLIAMS, I'm a major with the
▶ Play
state police over the regulatory division. Okay. You're recognized. Thank you, Mr. Chair. Hey, Lindsay, I was wondering, I was looking through the list and a lot of the amounts are for change orders. Those change orders, what, what drove the decisions that you had to have so many change orders to all these
▶ Play
contracts? Senator, there's a variety of reasons. Some of the early change orders were just simply things that weren't accounted for during the initial design or issues that were left out maybe by the architects that we thought were in there. These most recent ones that we're talking about here are related directly to the commercial driver's license testing pad that we have been able to provide. We, we found some adjacent land to the headquarters. This was not originally planned, but we found adjacent land that would allow us to not have to use property at ASU Newport's campus and pay, pay rent and so we were able to construct this and so these costs are related to
▶ Play
that the amounts that are paid out are those to the architect or those construction costs that are listed on our sheet these i believe are related
▶ Play
to the to the architect the fees that that they charge and we were able to negotiate some fees when we initially signed on with wd D&D architects, since we were building four headquarters, uh, and the plans were similar for, for all of those, they, uh, they negotiated a reduced fee down from what is the typical fee for architectural services, and so we were able to take advantage of that, and in doing this through a change order on the CDL pad, we were able to take advantage of, of that as well and not have to re-bid and go through negotiations again.
▶ Play
Speaker 27 11:51
Okay, thank you. Any other questions? Thank you.
▶ Play
There's no more questions. These items stand
▶ Play
Speaker 6 12:09
reviewed. Mr. Chairman, the next group of contracts are our intergovernmental contracts. These are contracts between state agencies, I-2. The first one is Health Department with UAMS, and this is an amendment adding $58,000 to an existing contract to cover the medical director for the preparedness unit. And in talking with the agency, they noted that UAMS had changed this individual's salary, and this is going back to pick up and bring them up to date with that increase. Number two is state police with UA Fayetteville. This is an amendment to an existing contract for services for conducting observational seatbelt use survey for analyzing that data and for publishing a report. On the next page, numbers three and four are both for UALR, the first one with ASU Mid-South, the second one with ASU Mountain Home. these are the same. They are both to provide entrepreneurial and small business services to designated geographical areas. Number five on the next page is Workforce Services with UCA. This is an original contract for $85,000. They note that this is to maintain databases and reports that were originally created by UCA for the Division of Workforce Services. Those are the intergovernmental contracts on today's agenda.
▶ Play
is there any questions no questions item
▶ Play
Speaker 6 13:41
stand approved the next group of contracts mr chairman are out of state contracts beginning on i3 the first one is arkansas geographic information systems office with city gate this is an original contract for 149 800 this will be for redistricting software solution number two is the education department with ncs pearson it's an amendment to existing contract for evaluation assessments number three also education department with renaissance learning this is an amendment to an existing contract to add assessment testing for grades three through eight in the private parochial schools to an existing contract for existing k-8 public school contracts and then on the next page is the health department number four this is with With the Nurse-Family Partnership, you'll notice that this contract is a sole source justification. In reading the sole source letter, OSP has noted that this is the only source for this service and they'll be serving high-risk families. This is a new contract, but they've actually been providing this service since 2011. They're just starting a new round of contract. The goal is to enroll first-time mothers before the 29th week of pregnancy and continue regular visits under the child's second birthday. Number five is DHS. This is one of the contracts they have for waste removal and disposal. This one is at the Arkansas Health Center. The sixth one there is DHS. This one is with eSystems, and they are adding money for testers and user acceptance testing and management solutions. Number seven is DHS for SNS management group for guard services at DHS Pulaski North and Southwest offices. Number eight is DHS with health management systems. This is an amendment. It's not adding any money, which typically we don't see contracts in here in this committee that don't add money. But in this case, this is making changes to the performance indicators and therefore is coming over for review. Number nine is DHS with Optum Government Solutions. This is for patient access, a new CMS requirement providing decision support system. Number 10 is Information System, and this is an original contract for identity and access Management Solutions. Number 11, UA Fayetteville with PFM asset. This is for management of short-term operating funds. And number 12, UA Fayetteville with two revolutions. This is an amendment for online learning and continued work due to COVID-19 to support student-centered learning and re-entry planning. And number 13, Workforce Services with Computer Aid Incorporated. This is an original contract for $193,856. This has to do with modernization of the unemployment insurance and hiring a project manager to perform those duties. Those are the out-of-state contracts on today's agenda. I
▶ Play
see we have a question
▶ Play
from Senator Elliott. Mr. Chair, this is regarding number three. Another explanation of what this contract is doing. I don't know if I need to talk to anybody from the Department of Education yet, but I could just hear
▶ Play
it from our staff. That might be helpful. That's
▶ Play
education. Do we have anyone here that can? Could I just hear it from our staff
▶ Play
Speaker 35 17:38
person? Because that might answer my question.
▶ Play
from a staffer? Yes, please. What was your question? Number three, would you just restate what
▶ Play
Speaker 6 17:47
the purpose of this contract is again? Oh, okay. This one is adding $75,000 for assessment testing for grades three through eight in the private parochial schools to the existing K-8 public school contract. Okay. Yeah, I guess I need to ask a question of
▶ Play
Mr. from the Department Please recognize yourself for the record. Good morning. Greg Rogers, Department of Education. Rachel Horne, Director
▶ Play
Speaker 45 18:18
of Curriculum and Assessment, Department of Education. You're recognized. Good morning. I just was
▶ Play
curious about if this is something we have done all along, or is this new? I just, I'm just not familiar with what we do with the private
▶ Play
Speaker 45 18:34
and parochial schools. This year, because of the COVID-19 pandemic, we received additional federal funds. And so because we are paying for the three eight public school contracts out of federal funds, then we are also providing equitable services out of those federal funds for the private and parochial schools. So this would be like a one-time thing. This is not an ongoing thing. Is that correct? so we are providing out of those funds two years of these assessments for three eight public which then also means we would provide two years for three
▶ Play
eight private pro guilt okay all right that's all i need thank you very much see that was not hard
▶ Play
smile greg thank you are there any other questions
▶ Play
Speaker 6 19:23
without objection these items are reviewed Mr. Chairman, the last group of contracts are in-state contracts. They begin on page 11 of item I. The first one is the corrections department. This is an amendment adding a little over $18.6 million to an existing contract that they have with Integrity Energy Partners. This is a phase two of a project that they have to provide energy savings performance contract. Number two is Department of Labor and Licensing with Arkansas Information Consortium. This is an original contract for $450,000 for the licensing platform for the Professional Board of Geologists. Number three is DFA, no, I'm sorry, that is Building Authority, and it's with Sharp Cleaning. to provide janitorial services for the Winthrop Rockefeller building. On the next page, four, also building authority for janitorial services is an original contract there for the building on Commerce Way. Number five is educational department. This is a contract amendment for their janitorial services. Number six is an amendment for ADEQ, for sharp cleaning services, for their building, their headquarters. On the next page, page 13, contract number seven, this is the health department, and this is an original contract for interpreter services to be used by local health unit staff. Number eight is the health department for lab information system with CQ Consulting and amendment add $416,000. Number nine begins contracts for DHS. The first one is an amendment for home studies. Number 10 is an amendment that DHS has for providing mail processing services for the agency. Number 11 is with April Peak. It's an amendment for speech therapy services at the Southeast Arkansas Human Development Center. Number 12, DHS, this one is with the Arkansas Optometric Association for professional visual consultants. for the Medicaid Vision and Arkansas Kids First program. Number 13 is DHS with PALCO. This is adding about $2.7 million to the self-directed finance management service delivery model to Medicaid recipients. Number 4 is UALR. This is a contract with Mangum Holcomb. This is for $135,000 to do a variety of marketing services. And then the last one is Workforce Services. This is an amendment adding some additional funds to a contract they have dealing with some extra cleaning for COVID, buildings with COVID. And those are the in-state contracts on today's
▶ Play
agenda. Okay. Thank you. I do have a question. Someone from the Correction Department, are they here today? I am
▶ Play
the Assistant Director over Construction and Maintenance for the Division of Corrections.
▶ Play
Um, my question, OK, on, um, page 11, the first item, the correction department, um, so you guys are requesting an additional $18 million, is that, is that correct? Or is that an additional million to be added to the $17 million that's already been, been spent? It would
▶ Play
be in addition. I mean, it was, it's, again, it's the, it's the contract that we have for renewal from
▶ Play
phase one to phase two. Okay. Okay. That's a substantial amount of money. The, so the, the, the, the original 17 million has already been spent in, in, for the energy saving performance contract. That's correct. Right. So do we know, have we got any data back as to, you know, the
▶ Play
savings that was? Yes. Yes. What we did is we get quarterly reports that we investigate what we are, what we're receiving in savings. And right now what we've done is they have exceeded their expected, their guaranteed savings by 30%. So we've actually realized a greater benefit than the guaranteeing savings that was impressed upon us when we entered into the energy performance contract. Okay so so the new
▶ Play
so the first original 17 million what what what what it for I think because I see that you have Tucker unit and the Gibson building for this new contract what was it what was it the original 17 million what it what facility did it
▶ Play
it was you two units. It was our Delta unit down at Dermont, and it was our East Arkansas unit at Brickies. Those were completed last year, and they are performing as expected, actually better than expected. Okay. All right.
▶ Play
Just quite a bit of money that stood out. Senator Elliott, you have a
▶ Play
a question. Yes, Mr. Chair. Um, I was just curious about as, as well, at this facility, um, when, once you, uh, use the funds that you're proposing to use here in this con-, in this proposal, uh, do you expect that the energy situation is going to be, um, working at, I, I don't necessarily need to say maximum, but will we expect not to keep hearing from people that that things are not doing okay at this
▶ Play
facility? Yeah, the second phase is actually for our Tucker unit and our Tucker Max unit, which is adjacent to each other. And they evaluate four different criteria areas that we investigate and do analysis on. Those capital equipment items are replaced with more efficient equipment. Mechanically, the lighting, water treatment, and water flow is also evaluated in that process. So, again, we monitor that on a consistent basis, but we do receive quarterly reports that allows us to see what our savings actually are.
▶ Play
Is this strictly, though, just, I mean, for savings? I'm really thinking now, I'm just taking advantage of your being here and asking you this question. Sure. Do we have, what is our situation with other facilities around the state when it comes to, um, you know, climate energy and, um, because we hear from folks all the time, you know, this is not working, that's not
▶ Play
working. Yes, we, uh, we are continually evaluating that equipment, uh, but we also have an investment grade audit in a phase three of this program that's actually going to evaluate 11 of our units and evaluate our mechanical, our lighting, our water treatments, etc. And we're actually going to get that report back to us to identify to us where we can actually save the most money at each one of these units, whether it's replacing with more efficient equipment or it's replacing lighting that gives us that guaranteed savings or that estimated savings per month. So we evaluate that all the time. I guess
▶ Play
I'm trying to get a sense, too, is could we expect to hear back from, would that report also give the information about, not just about savings, but whether we can expect to need more upgrades of maintenance so that, you know, it's not a 98-degree day and there's no air conditioning and that kind of thing? I understand. Is that a part of what you would be looking at? Well, we
▶ Play
actually in our maintenance division and construction division now operate a maintenance preventive program that was just recently instituted that evaluates the equipment, the efficiency of the equipment, the life cycle of that equipment. And then we assess that based on its, again, its usage, its life cycle, whether it's operational or not operational. But we are actually in the middle of actually instituting a program that's going to help us stay better on top of everything that is malfunctioning or not operating correctly or optimally at a unit. All right. And for making those,
▶ Play
and for these upgrades, Do you just depend on general revenue or are there other sources of funds?
▶ Play
There is other sources involved based on the necessity or the dollar figure that you get into with any kind of capital equipment improvement that you
▶ Play
make on a compound. All right. Thank you so much. Yes, ma'am. I have another question. Okay. I mean, it's just quite a bit of money. It just kind of stands out. Mm-hmm. When the original $17 million was presented, and approved, there was no talk of phase two. When did the phase two come about that we would need to allocate an additional $18 million to
▶ Play
accommodate? Yes, sir. We actually, the $17 million or the initial phase one project was for those initial two units. All of the units were identified and evaluated. And those numbers were turned into the energy office for us to feel like we were choosing the right units that would make the greatest impact. So the first two units were selected in that phase one, which was Delta in East Arkansas. Now in phase two, we've identified the next two units that was on that list that would give us the greatest impact of cost savings and optimal equipment usage on a compound.
▶ Play
Okay, but what I'm asking is that, you know, originally that would the phase two was never item of discussion. So, I mean, so this is kind of new to, to me, it may not be new to anyone else that, that we were, that we, that you guys would need an additional 18 to do two more units. So, I'm
▶ Play
just kind of, you know. Mr. Chairman, I will have to get that information to you. I'm not I just recently, in September of this year, came into this position. So I will be happy to identify when this came up for discussion, where it went, who had those discussions. I'll be happy to supply that information. I appreciate it if you could. Sure.
▶ Play
Are there any other additional questions? Mr. Cooper, thank you for your time. Yes, sir. any more questions okay all right without any objection these items stay in
▶ Play
Speaker 6 31:19
review mr chairman the next item on the agenda are the reports uh this committee uh peer and review receive a number of monthly quarterly reports we've uh provided those for the subcommittee we also have provided them as a separate handout if people would like to take them with them We won't be going through those reports, but if there are any questions, we should have people here who could
▶ Play
Speaker 11 31:47
address the concerns any committee member might have.
▶ Play
Good reading for you. You have any questions? Of course, you know, we don't meet all that often, but we do have some scheduled dates with February 24th. so mark your calendar and Kathy will be sending out emails and also March 23rd so just just keep an eye on your emails for any future dates that may come spring up impromptu. If there's not anything else this meeting is adjourned. Thank you.
▶ Play
Unknown speaker 32:35
You
▶ Play

Agenda

Call to Order

2:29 - 2:39 1 segment 1 speaker

F. Pay Plan Holding Account Transfer Request

2:39 - 4:10 5 segments 2 speakers 1 document

Speaker 6 presented three performance-fund pay-plan holding-account transfer requests-$9,220 for the State Board of Optometry, $150,000 for the Minority Health Commission to reclassify nurse registrations, and $107,000 for the Public Defender Commission for performance and insurance premium increases-totaling $266,220. [2:42] [3:06] [3:38]

Representative Monte Hodges moved that the items be approved and the committee adopted the motion without objection. [4:00]

G. Review Requests Methods of Finance

4:10 - 6:19 5 segments 2 speakers

Speaker 6 outlined five finance requests for capital projects under $250,000, including $269,144 for ASU Jonesboro stair repairs, a $3.3 million STEM lab upgrade at UA Pulaski Technical College funded by reserves, grant and rainy-day funds, $1.1 million roof work at South Arkansas Community College, $3.87 million for UAMS Hart Electrical System Lab, and $898,162 for a UAMS cafeteria renovation. [4:12] [4:44] [5:26] [6:00]

Speaker 12 moved that the methods of finance be approved and the committee adopted the motion. [6:14]

H. Review Requests Discretionary Grants

6:19 - 7:30 4 segments 2 speakers

Speaker 6 presented two discretionary grant proposals-a $685,024 fully-federal health-department grant to train pharmacists in chronic-disease assessments and three identical Department of Human Services grants to fund medication-assisted treatment for opioid use disorder-and the committee heard no questions. [6:20] [6:30] [7:02] [7:25]

I. Review Requests Service Contracts for Legislative Review

7:30 - 31:21 85 segments 10 speakers

Speaker 6 introduced a series of construction-related service contracts, including a $100,000 on-call maintenance addition for the Building Authority, a $28,084 amendment for the State Police architectural services, and an on-call architectural contract for UA Community College, and Representative Monte Hodges moved that the items be approved. [7:32] [7:53] [8:27] [8:58] [9:12]

Senator Kim Hammer questioned the State Police contract amendment, and Lindsey Williams explained that the change orders were driven by unanticipated design issues and a newly acquired CDL testing pad that avoided leasing space at ASU Newport, resulting in negotiated fee reductions. [9:17] [9:22] [9:36] [9:47] [10:07] [10:09] [10:43] [10:57] [11:10] [11:20]

The committee then reviewed intergovernmental and out-of-state contracts, during which Senator Joyce Elliott sought clarification on a $75,000 education-department amendment for private/parochial school assessments; staff clarified it was a one-time use of COVID-era federal funds. [12:09] [12:26] [12:58] [13:31] [13:36] [13:41] [14:02] [17:11] [17:19] [17:28] [17:32] [17:38] [17:41] [17:47] [17:51] [18:00] [18:18] [18:26] [18:34] [18:58] [19:07]

Finally, Representative Monte Hodges and Senator Ronald Caldwell debated a large $18.6 million amendment to the Corrections Department’s energy-performance contract, with Caldwell noting the project had already exceeded its guaranteed savings by 30 percent and outlining phase-two expansions; the committee approved the contracts without objection. [19:31] [20:06] [20:40] [21:11] [21:43] [22:19] [22:24] [23:00] [23:06] [23:31] [23:38] [24:04] [25:15] [25:23] [25:45] [25:55] [26:26] [26:51] [27:00] [27:29] [27:36] [27:58] [28:12] [28:35] [28:42] [28:55] [29:14] [29:22] [29:46] [30:08] [30:24] [30:33] [30:55]

J. UAMS NCI Fund Report

31:21 - 31:39 1 segment 1 speaker 1 document

K. Quarterly Reports

31:39 - 31:42

L. Monthly Reports

31:42 - 31:59 2 segments 2 speakers

M. Review Requests Reports and Communications

N. Contract Amendment - Renewals/Extensions with No Material Change - Member Requested for Discussion**

O. Other Business

31:59 - 32:23 1 segment 1 speaker

P. Adjournment

32:23 - 32:37 1 segment

Speakers

Representative Monte Hodges Unverified
21 segments
Speaker 6
37 segments
Speaker 12
1 segment
Speaker 9
1 segment
Speaker 11
2 segments
Senator Kim Hammer Unverified
3 segments
Lindsey Williams Unverified
6 segments
Speaker 27
1 segment
Senator Joyce Elliott Unverified
13 segments
Speaker 35
1 segment
Speaker 45
3 segments
Senator Ronald Caldwell Unverified
15 segments