B. Report on the Progress of each Highway Construction Project of $10 million or More as Required by A.C.A § 27-65-107(a)(19) [Exhibit B] - Lorie Tudor, Direct… 7:41

The Director of the Arkansas Department of Transportation, Lori Tudor, opened the item by distributing the third-quarter report that lists all highway projects of $10 million or more and introduced two senior staff members, assistant chief engineer Steve Frisbee and deputy director/chief engineer Vines. [7:47] [7:57] [8:09]

She invited committee members to pose questions about the report, but no questions were recorded before she moved on to provide an update on the I-40 Hernando de Soto Bridge project. [8:19] [8:52] [9:09]

C. Update on Hernando de Soto Bridge on Interstate 40 over the Mississippi River - Lorie Tudor, Director, Arkansas Department of Transportation 9:11

Director Tudor and Chief Engineer Vines briefed the committee on Arkansas’s bridge inspection program, which monitors 12,776 structures-including 7,383 state-owned bridges and 765 fracture-critical bridges-inspected at least biennially (annually for fracture-critical members), has never been found non-compliant by the FHWA, and employs enhanced QA/QC teams, drones and non-destructive testing. [9:55] [10:26] [11:00] [11:35] [12:10] [12:49] [13:22] [13:53]

Tudor explained that a fracture discovered on May 11 2021 on the Hernando de Soto I-40 Mississippi River bridge triggered an immediate closure, the formation of a multi-agency expert team (FHWA, TDOT, HNTB, Michael Baker International), termination of the inspector responsible for the missed defect, and ongoing investigations by the DOT Inspector General and a FHWA special audit. [18:58] [19:32] [20:03] [20:35] [21:09]

The department outlined a two-phase repair strategy-phase 1 stabilization and phase 2 fabrication now underway with Kewick Construction-while noting a budget increase from $3.5 million to $6.4 million for consultant reviews and equipment upgrades, and reported that traffic-management measures on parallel I-55 (lane reductions, a temporary middle-lane closure, and coordinated lane additions at the Crump Interchange) have cut travel delays by roughly 20 % and restored near-free-flow conditions. [21:42] [22:15] [22:47] [23:45] [24:15] [24:45] [25:18] [30:43] [31:16] [31:47] [32:22] [32:58] [33:36] [34:12] [34:43] [35:13]

Senators questioned the $2 million allocated for additional consultants, receiving clarification that the funds come from state allocations, will be procured through a competitive RFP process requiring commission approval, and that a report on the balance of the special-projects/economic-development fund will be provided; Senator Missy Irvin also criticized the unclear communication during a 911 call, urged staff training on precise scripts and improved emergency management, and expressed concern that traffic delays from bridge closures could harm West Memphis businesses and add stress to the I-55 bridge. [41:07] [41:30] [41:32] [41:49] [41:52] [42:03] [42:08] [45:35] [45:49] [46:19] [1:03:11] [1:03:41] [1:04:13] [1:04:47] [1:05:22] [1:06:50] [1:07:12] [1:07:48]

Speaker 26 reported that recent changes implemented by RDOT and TDOT have markedly improved traffic flow, exceeding expectations and earning positive feedback from local drivers, and Representative Ron McNair thanked the presenters, noted the attendance of Commissioners Marie Holder and Keith Gibson, and closed the discussion to proceed to the next agenda item. [1:06:07] [1:06:38] [1:08:00] [1:08:24]

Official video page ↗

Transcript

Transcript available Whisper ✓ SliQ live captions ✓ Download .txt
Machine transcript

May contain errors. Verify important quotations against the official video.

About transcript accuracy
Source
Whisper
Model
ggml-large-v3-turbo.bin RTX5060
Processing date
October 22, 2026
Unknown speaker 0:00
Thank you. Thank you. Thank you. Thank you. Thank you. Thank you. Thank you. Thank you. Thank you. Thank you. Thank you.
▶ Play
Speaker 1 5:30
Thank you.
▶ Play
Would everyone take their seats, please? We'll try to get started.
▶ Play
Speaker 8 6:17
Everybody get started without taking their seats. Uh-oh.
▶ Play
I want to call the meeting of the Highway Commission Review and Advisory Subcommittee to order. We've got a couple lengthy presentations, so if everybody would take their seat. My co-chair, Senator Johnson, is home working, trying to make food for all of us, so he won't be here today. But we're going to get started with our report on the progress of our highway construction project. We've got two handouts I think everybody should have. The quarterly report and then the one on the progress of the highway construction. You should have those. Who's presenting? Ms. Laurie, are you doing that?
▶ Play
Speaker 22 7:41
Okay. Good afternoon, I'm Lori Tudor, the Director of the Arkansas Department of Transportation, and I've brought two of our top staff with me today. I'll let them introduce themselves. Okay. Good afternoon, Mr.
▶ Play
Speaker 26 7:57
Chair, committee. I'm Steve Frisbee, the assistant chief engineer for operations for RDOT. My name is Rex
▶ Play
Speaker 38 8:09
Vines. I'm deputy director and chief engineer for RDOT. Thank you
▶ Play
Speaker 30 8:13
all for being here. Go ahead and proceed.
▶ Play
Speaker 22 8:19
Okay, in front of you, you should have your report that we put together quarterly for this committee, subcommittee, and it's the third quarter report, and it lists all the projects, $10 million or more that are under construction, and the status of progress on those projects so with that I'll just open it up for any questions about the
▶ Play
report any questions from anyone if not then we will proceed to the
▶ Play
Speaker 22 9:09
next one or if you want to okay the next thing we would like to do is give you an update on the I-40 Hernando de Soto Bridge between West Memphis and Memphis over the Mississippi River. We presented to you at our last meeting and we have a nice update for the committee this morning or this afternoon. So we're going to kind of tag team this and Rex, our chief engineer, is going to start us off. I'll have a few comments in between and then Steve will finish up. So hopefully, this is going to be a nice, informative presentation. We did it yesterday at the commission meeting, and so we'll get started. I'll hand it off to Rex. Okay, thank you.
▶ Play
Speaker 38 9:55
Thank you, Director. As you're all very aware, on May 11th of 2021, a fracture was discovered on the I-40 bridge crossing the Mississippi River. It's also known as the Hernando de Soto Bridge. The discovery of the fracture has garnished a lot of attention and questions in the past weeks, and although many of the questions have been great and they have been answered, we feel like the story of the bridge inspection program has been lost in the shuffle. So what I'd like to do this morning is provide some more information in a manner that I hope will help everyone understand RDoS Bridge Inspection Program as a whole, as well as provide an update on the bridge. RDoS is responsible for inspecting 12,776 structures across the state. 7,383 of those, or I'm sorry, 7,383 of those structures are state-owned and then the remainder are city and county bridges, local, local roads. Structures are inspected a minimum of every two years and fracture critical members are inspected annually. There are 765 bridges that have fracture critical members and I'll explain that in a little more depth later. The Federal Highway Administration has general oversight of our program and conducts annual compliance audits. I'd like to point out that the department has never been found non-compliant by the FHWA. In fact, in many ways our bridge inspection program exceeds the minimums, minimum requirements to maintain compliance. All of our structures with reduced low postings are inspected annually. They're only required to be inspected annually. Structures in poor conditions are inspected annually, which only requires a biannual inspection. Our inspectors use non-destructive testing such as ultrasonic testing on many of our practical members like pins on pin and hangers. Critical findings and load posting issues are reviewed by engineering staff monthly. In 2017, we increased our NBIS QAQC program by adding an inspection team to our statewide inspection program. Before that, we only had one. Then in 2019, we added another statewide inspection team in an effort to increase our quality assurance program. then in 2020 we've introduced drones into our program to just help enhance the just help enhance it so as we move on to the next i'd like to just point out a couple the manuals on your screen you see here are the national bridge inspection reference manual produced by usdot and we we We're going to bring a copy of that today, but it's over 2,000 pages long. It's a little big. So we thought it would probably be best not to. So that is on the left of your screen. The R.DOT bridge inspection manual is more specific to Arkansas and Arkansas DOT. Each of these manuals are heavily used by our bridge inspectors as they go about performing their duties. there are 24 inspection teams located around the state who are based in our district headquarters these inspection teams consist of district bridge inspector and an assistant district bridge inspector each team reports to the district construction engineer in that district who is a professional engineer there are three statewide inspection teams who are tasked to inspect our larger structures around the state. These inspection teams consist of a statewide bridge inspector and an assistant bridge inspector. These teams report to the staff heavy bridge maintenance engineer who is also a professional engineer. So what does it take to be a bridge inspector? I'm glad you asked. A minimum of five years experience with structures with a a minimum of two and a half years of inspection experience. Certification from the National Highway Institute course safety inspection of in-service bridges and inspectors are also required to have periodic refresher training. One last thing I'd like to share with you regarding this overall program is some quotes from our recent compliance letters from the Federal Highway administration. And
▶ Play
Speaker 41 14:46
I specifically, I'll let you read those that specifically want to highlight the 2018-19.
▶ Play
Speaker 38 14:53
The Arkansas Department of Transportation has functioning and effective bridge inspection program. So now to move a little past the overall program and get a little more specific to the Hernando Soto Bridge of I-40 Mississippi River Bridge. It is a very complicated bridge to inspect and hopefully I can help you understand it a little bit there or at least help clarify some things. This bridge has five units, 18 pre-stabst concrete girder units which are 1,200 feet long. It has seven plate girders and floor beams which are 980 feet long and do include fracture critical members. five steel box girders with floor beams this is 1860 feet long two span tied arch truss which is 1850 feet long which have fractured critical members and this is the the picture that you see on the screen here is what most people think of when you say the mississippi river bridge this is only it's a very small portion of that bridge it's also 26 steel multi-beam spans which are 3,595 feet long this totals 9,435 feet in length and is roughly equivalent to 31 and a half football fields in accordance with the national bridge inspection standard each unit is fully inspected every two years. RDOT has added a fracture critical member inspection in between these the required inspections. I would like to clarify one thing on terminology before we move too far on. The terminology we use can be internally can be a little confusing at times. A fracture-critical bridge is a bridge that has one or more components that are considered fracture-critical. So a fracture-critical component simply means that it would, if certain pieces of the bridge fail, it could result in collapse of the bridge. I think there has been some, that is why we inspect it annually and not biannually, as is required. So I think there's been, in our conversations, there have been people who have heard fractured critical, as in they are fractured and critical. But it does not mean that we inspect them annually to be sure they're in good shape. If we find a fractured member, we immediately address it. We do not allow these to go on. So just wanted to clarify that. what has also drawn a lot of confusion is the timing of the inspection and who performs them you can see on the photos on your screen these are just some some indications of photos the one the photo number one is of some inspectors checking the top truss or checking some cable stay units or cable units and then the photo two is uh in the what we call a snooper that's a kind of a generic term for an under under bridge unit and they are there's a truck on top of that that's all tied to that they move around but in general the entire structure is inspected by our dot inspection team finally this includes critical members using the snooper we use climbing as you see these gentlemen on the on the left climbing. We use binoculars on the cables and we now have drones that we've added to this. On the off years between the biennial inspections we perform fracture critical inspections in which we have hired consultant inspectors with rope certifications to inspect the cable system along with drone inspections. This also includes climbing and the use of the snooper to inspect the fracture critical members. As you know, the fracture was discovered on one of the tide span arches by a consultant inspection team, Michael Baker International, as they were performing an inspection on the cables. The bridge was immediately closed to traffic and the I-55 bridge, which would be forced carry the load of both interstates was reinspected by RDOT's bridge inspection team. Within hours, we began forming a team of experts with Federal Highway Administration, with Tennessee Department of Transportation, with Arkansas Department of Transportation, HNTB, and Michael Baker International, and we began, this team began assessing the damage to the structure. We'll quickly schedule press conferences to let the public know what had occurred and that we were performing investigations. During the assessment, drone footage of the 2019 inspection revealed damage that had not been previously recognized. We began an internal investigation which resulted in immediate termination of the inspector responsible for the inspecting this portion of the structure for at least the past two years. A social media post later surfaced claiming 2016 origins of the same damage as we do not have the technology to confirm that the validity of this picture we have turned this photo over to the office of inspector general and we are proceeding with our internal investigations assuming this photo is legitimate. As part of the investigation into our bridge inspection program, we have requested the assistance of the U.S. Department of Transportation Inspector General to investigate. The Federal Highway Administration is performing a comprehensive special process and compliance audit. Tennessee Department of Transportation has re-inspected the I-55 bridge to assure us it's safe and RDOT has solicited consultants to review our program as well. So now I'd like to move on to the repairs, if I may. In 2007, a structure on the I-35 in Minnesota collapsed during rush hour, in part due to additional unaccounted for weight for repair equipment. To not repeat the mistakes of the past, the design team has gone to great effort to account for as many variables as possible. Globally the bridge was still feared to be in danger of collapsing so the design team developed an intermediate solution in order to move on to the permanent solution. The bridge had to be stabilized before we could continue further. This phase one repair provided some additional confidence that the bridge could handle the weight of the work platforms, the equipment, the personnel and the materials to perform the work. So as I mentioned earlier, upon the discovery of the fracture, a design team was formed to come up with an immediate and permanent repair. The team consisted of bridge experts from Federal Highway Administration, RDOT, TDOT, Michael Baker International, and HNTB. Once Kewick Construction was brought on board, their construction experience was brought into and into the process immediately and we addressed some safety and constructability concerns and that was incorporated into the final design so that we could provide the safest and the fastest repair possible. The fabrication of phase two has begun and some parts are being installed already as the schedule rest primarily on fabrication we are not ready to provide a an exact timeline of the repairs and the reopening has not been that's not been released by TDOT so but before I start before I finish I'd like to show you a short video the Tennessee Department of Transportation has put together that goes over how the repair will be handled. Thank you. Just so you know, Senator Ingram picked out the music. You know, sitting from my vantage point, watching so many different entities working together for a common cause, including two firms who are normally competitors, and just sitting back and watching them push agendas aside and working for the greater good, a quote from Harry Truman, I believe is applicable here. Director Tudor brought this to our attention recently, and it's on your screen. It's amazing what can be accomplished when you don't care who gets the credit.
▶ Play
Speaker 22 24:45
thank you mr chairman thank you members now um steve's gonna take nope i'm gonna take it from here forgot the script um so you know because of of this this challenge that's been put in front of us because of the i-40 bridge it came at a time when we were creating our budget for this upcoming fiscal year which is uh starts on july 1st so the first thing we did is we went to our heavy bridge maintenance section and we said what do you need what can we do to improve our program what kind of equipment what you know so we did some some really some in-depth looking into it and so we increased our budget from last year it was 3.5 million to 6.4 million and a big portion of that increase is going to be hiring consultants, and those consultants are going to come in and do two things. One, they're going to look at our entire program, and they're going to give us suggestions. What are some things we can do? What are some new technologies, new equipment? We're going to get an outside person or an outside firm to come in and get us up to speed with the newest industry standards and those types of things. And then also we're going to hire a consultant to help us with quality control and quality assurance until we are internally sure that our program is in, you know, we have the redundancies, everything in place so that we have a very, very strong bridge inspection program. So we want to really learn from this and we will learn from this and get better. in our current statewide transportation improvement program that we're under right now our plan for the future the next four years the projects that we have and we recently got that approved by the federal highway administration went through a huge public involvement process but the plan the statewide transportation improvement program we all call the stip is underway, and in that STIP, over the next four years, we have a total of 272 bridges that are scheduled for replacement for $502 million, and then we have about 200 bridges that will be rehabilitated annually through the current STIP. It's about $38 million a year, so a total of 800 bridges to have some rehabilitation and a total cost of $152 million. And then thanks to the passage of Issue 1, the extension of the half-cent sales tax, we're going to be able to start the Renew Arkansas Highways program July 1st of 2023. And in this program, when we went out to the public and we said, this is how we'll spend all of our funding if issue one passes, that will include $1.1 billion over the next 10 years, beginning July 1st, 2023, to repair or replace all of our load posted or structurally deficient bridges. So Issue 1 allowed us to really beef up our bridge replacement rehabilitation program to take care of all of those bridges over the next 10 years. Well, in addition to that, we're going to set aside over the next 20 years $3.6 billion for a second Connecting Arkansas Highways program. And that program will build some projects on new location, like I-49 from Alma down to, I think it's Highway 270, and some other big projects that we're going to be able to accomplish that will build new bridges, like a new bridge over the Arkansas River, and then also some of the capacity projects that will widen roadways that need additional capacity. We were replacing bridges within those sections to have wider bridges and newer bridges. So in addition to just focusing on bridges, we'll have this big capital and congestion relief program that will also take care of many of our bridges. So with that, I'm going to turn it over to Steve Frisbee, and he's going to give you an update on removing some of the pain points that we're going through right now since
▶ Play
Speaker 26 29:18
we closed the I-40 bridge. Thank you, Director. So as we are focusing on getting the I-40 bridge repaired and reopened, we've also been focusing our efforts on maintaining traffic flow across the I-55 bridge. Prior to the bridge closure, both I-40 and I-55 carried a combined 85,000 to 90,000 vehicles per day, and each bridge is part of a vital link of not only between Arkansas and Tennessee, but for freight movements from coast to coast. Immediately after the bridge closure, RDOT and our partners at TDOT, Federal Highway Administration, the cities of West Memphis and Memphis, police, emergency services in each state, we set up a daily conference call to share updates, collaborate strategies, and maintain safe and efficient flow of traffic. As expected, following the closure, traffic backups of five-plus miles in each direction of I-55 occurred on most days and continued throughout the peak daytime hours. With Wednesdays through Fridays seeing the worst congestion, trips across the river were experiencing an average delay of at least one hour, and with any crashes or stalled vehicles, backups caused multi-hour delays at times. This would cause drivers to attempt to divert through town, causing further problems for the local highways and streets in West Memphis. our district forces quickly worked to add a motorist assistance patrol vehicle in west memphis to assist stranded motorists and clear any stalled vehicles from the traveled way also our highway police patrol units have worked tirelessly protecting the traffic queues with blue lights warning motorists of the pending stop traffic ahead and we've opened rest areas and way stations for additional truck parking for commercial motor vehicles as well so to improve the traffic flow our engineering staff has been working hard brainstorming and analyzing options for improving the bottlenecks for reducing traffic merging conflicts and sharing and listening to our partners on our daily calls working together to find the best solutions so early last thursday rdot implemented some traffic control changes as shown on the map here we what we did is we've reduced the I-55 southbound from two lanes down to one lane prior to the west split where I-55 joins I-40. So as you approach this location, I-40 eastbound already reduces to one lane before joining with I-55, and then they join into three lanes. We elected to close the middle lane of the three-lane section through West Memphis, separating the I-40 one-lane of traffic from the I-55 one-lane of traffic to minimize merging conflicts with the ramps and allow a more even flow specifically for the I-40 traffic as compared to the I-55. We ended that middle lane closure near Ingram Boulevard, allowing the two lanes to continue through merged together onto the river bridge. So in addition to our changes, TDOT forces have been working for several weeks now planning and moving utilities, widening drainage structures, to be able to widen the one lane of I-55 ramp at the Crump Interchange, which is just across the river. This area was the main choke point for eastbound interstate traffic, and it was the beginning of the traffic backups that have occurred daily since the closure. TDOT paved the majority of this much-needed additional lane at the Crump Interchange last Thursday. So as much as that work was necessary, it did increase during that day last Thursday. It increased the already high congestion and traffic backups last Thursday extended several miles into Arkansas up I-55 past Marion and on I-40 all the way back to the Crittenden County line, causing some of the worst traffic delays yet. There was of course immediate concern that these traffic pattern changes that RDOT implemented the same day were to blame and Thursday was a really rough day for travelers for those that were involved there and it was a rough day for all of us involved. However, we still felt confident that we made the right decision that our traffic changes were based on solid engineering judgment and that it would work. We asked for patience to give our changes time to take effect without the additional construction work impact that we experienced last Thursday. TDOT agreed to not work at the Crump Interchange on Friday following, allowing our traffic changes to be tested, and we were relieved to see traffic flow improve last Thursday. We saw at least a 20% improvement the first day after TDOT didn't work. Even better, TDOT worked over the weekend and were able to complete the two-lane section, adding that second lane at the Crump Interchange, and we were very thankful for their efforts to gain this important additional travel lane, and we feel this was the key to opening up the flow for eastbound traffic. I'm pleased to say that the combined efforts of RDOT, TDOT, Federal Highway Administration, we are seeing much improved traffic flow this week. This travel time chart shows the traffic delay. It's calculated from the TDOT Smartway system, which has traffic sensors throughout Memphis and West Memphis to collect detailed traffic data. The normal travel time there, if you could see at the bottom, is the green line, and it shows about a seven-minute trip for seven miles from the West Split across the Crump Interchange to Memphis. That's the normal daily commute time. On Friday, June 4th, the travel time was close to one hour, so that was almost two weeks back. And last Friday, after our changes were made, they peaked at 43 minutes, showing that 20% improvement on a very busy day. But even better yet, after the crump ramp went to two lanes over the weekend, this Monday and Tuesday's travel time, as you can see there in yellow, is a comparison of this past Monday to the previous Monday, and the purple is this past Tuesday to the previous Tuesday. The travel time dropped to 10 minutes. We saw almost free flow traffic all day, a huge improvement over what we've seen since the closure on May 11th. We are cautiously optimistic, understanding the busiest travel days are Wednesdays and Thursdays, but we feel these changes that have been made will continue to make an impact for better flow of traffic during the duration of the I-40 closure period. Traffic again flowed very well yesterday on Wednesday and even today Thursday. Yesterday morning we did have some emergency pothole work that had to be done due to some damage that had occurred overnight and that did cause a bit of a backup. This morning we had just minor traffic backups in the typical morning rush hour but previous to that since May 11th it would be pretty much gridlock all day long especially on Wednesdays, Thursdays, and Fridays, and to see that traffic free-flowing at 2 p.m. is just, it's amazing. It's better than we had expected. So I am proud to re-quote our Deputy Director and Chief Engineer Rex Vines, who in response to this effort earlier in the week, he quoted Proverbs 15.22 that says, without counsel, plans fail, but with many advisors, they succeed. This is a perfect example of that quote because I cannot stress enough the collaborative teamwork that's taken place here from our friends that assisted in our planning branch at RDOT, our engineers and maintenance crews in District 1 there in Memphis and West Memphis, TDOT, the Federal Highway Administration, our local partners all worked together and played a role to make these changes a reality. This directly impacted, immediately made an economic safety and quality of life impact on businesses, residents, freight haulers, emergency services, and all travelers throughout this area during the emergency closure of the I-40 bridge. We do plan to continue to monitor traffic conditions and are ready to make necessary changes as needed to keep this momentum going in the right direction, and we do appreciate the patience of the
▶ Play
Speaker 22 37:30
traveling public during this crisis. Thank you. So with that, I'll just say, we're lacking quotes in this presentation, but I was at a groundbreaking in Mayflower, and I was talking to one of our congressmen, and we were talking about the bridge, and he said this to me, never let a good crisis go to waste and that really resonated with me because as bad as this has been as the events unfold we are learning so much but not only are we learning so much so are the other DOTs across the nation there's just so much going on right now and at the end of the day when this is all in the rearview mirror there's going to be some huge lessons learn that it's going to make I know is going to make our dot better and stronger than we've ever been before but I'm I'm convinced it's going to make the whole nation stronger as far as our bridge inspections go because the challenge the whole nation is facing is an aging infrastructure and this fracture in the I-40 bridge is just one thing that has just put a spotlight on that this is a bridge that was open to traffic in 1972 and it you know all of our infrastructure these huge bridges all across the nation are getting older and they're going to have more problems so to strengthen that bridge inspection program to find a weakness before a major catastrophe occurred to find a weakness and to be able to correct that is really uh to me a fortunate thing uh more than And I mean, it is unfortunate that what we're going through, but I'll just say that I'm glad we found this weakness before anything really bad happened. So with that, I'm just going to stop and thank you for your patience. I know this was a long presentation, but we really wanted to tell the story. So I'll stop and take any questions that you
▶ Play
Speaker 70 39:27
might have. Okay. Senator Testerfield? Yes, thank
▶ Play
you. And thank you for the presentation. Just a quick question. Are there any other bridges made of the same
▶ Play
Speaker 26 39:41
material in the state of Arkansas? As far as the steel material, of course, many of our bridges have similar structural steel members in them. And so, yes, ma'am, there are quite a few bridges with the similar materials.
▶ Play
That's so reassuring. You wouldn't want to tell me where they are, would you?
▶ Play
Speaker 26 40:02
As Mr. Fiennes shared, we have 12,000 bridges across the state. Now, it's not necessarily the materials, I would say, but as the type, as we use that term, fracture-critical. What are the fracture-critical bridges in the state? So out of the 12,000, the good fortunate thing is there are 765 fracture-critical bridges across the state. And those are the ones that have these special, we do special inspections on those because of that fracture-critical. It wouldn't be going from Helena to Lula, would it? Yes, ma'am. The Helena Bridge is also fracture critical. So much
▶ Play
for that. So, Saracen, thank you very, very much. I appreciate it. Senator Dismayne. Mr. Secretary. Chairman, just
▶ Play
real quick, on the consultants that we're looking to hire and kind of the plan that's surrounding that, do we have
▶ Play
Speaker 22 41:07
any idea on costs? we I'm sorry is it on we have budgeted two million dollars two million dollars for that we've budgeted two million dollars but we don't know yet we're out for we've done requests for proposals so we have to go through the process but that's how much we have budgeted. Okay,
▶ Play
and then on that, so where were those funds come from as far as your existing budget? Because, you know, we're really tight. Legislature's allocating money because we've got to meet the match. You know, I mean, that's kind of the argument. I just want to make sure. Right. So where would this $2 million come
▶ Play
Speaker 22 41:49
from? It comes from our state funds that we get, you know, our-
▶ Play
So some of that, the $50 million that we sent over, you're going to utilize some of that to pay for consultants? Yes, sir. for this problem that's there. Okay, and then is it possible, so there's some money set aside. How much do we have set aside in the
▶ Play
Speaker 22 42:08
special projects fund right now? In special projects? I don't think
▶ Play
we have any. It's zero. What happened to those dollars then? Because there were some dollars set aside for economic development special projects. We discussed it in this committee and in a full ALC. There was money specifically set aside for economic development?
▶ Play
Speaker 22 42:30
Okay, I'm not sure if we're talking about the half cent sales tax funding, but I would like to get my, I'll get you.
▶ Play
This, this was, so the legislature, I can't remember how many years ago now, probably two years ago, sent well in excess of what we thought was going to go over because of the amount of surplus that
▶ Play
Speaker 22 42:48
was transferred. Oh, okay, I know exactly what you're talking about now. And then there was some of those funds that were set aside. Yes, that's right. We set aside, I think it was 15 million dollars to do economic development and those funds the way we are handling the way the commission determined to use those funds if the economic development council and the governor if someone came in like amazon or amazon was one or two of them right and there's been there's been some big industries that have come in and needed some transportation improvements and if they if If they pass the test with all the people in the governor and the Economic Development Council, then the commission has allotted them a certain amount of money. We have a balance in that account. We haven't used all of it. I apologize. I wasn't tracking it. But we
▶ Play
have utilized some of it. I was
▶ Play
Speaker 22 43:43
not aware of that. We still have a balance
▶ Play
in those funds. Do you mind getting the balance of that? Because what I would say, I've been here long enough to know that when we started sending the money over to RDOT out of general revenue or surplus, out of general dollars, you know, the primary focus was for repairs and maintenance. And then, you know, it transitioned because we sent so much over that it was more than you needed, I guess. And so then we did this economic development fund. And since we're not utilizing it for repairs and maintenance, as was originally, you know, considered by this legislature, you know, we have new folks in here, but the folks that were here. That was the drum beat, was repairs and maintenance. Then I would like for us to look at utilizing some of those funds for these consultants if we're going to do that. And just one last question on the consultants would be, you know, they're only going to be as valuable as they are independent as they're working through the process to give you all information, review information, and then provide recommendations. And so I'd just like to hear a little bit about what we're going to do to ensure that there is independence. Like for instance, if there were consultants to be hired, I would prefer them to be hired by the commissioners, not RDOT employees. That way there's independence between the employees and the consultants that would be putting forward the proposals and reviewing the information. But again, I would just like to kind of hear your considerations as we work through your hiring, what we're going to do to make sure there's a stop or there's a good divide between what we want the outcome to be and what it may should be based on the information that we're providing
▶ Play
Speaker 22 45:35
to the consultants. Thank you. Okay, I'll respond to that. The commission, the commission approves any hiring of any consultant. Anytime we do anything like that, They give us permission to go out for requests for proposals, and then they also give us permission to evaluate the proposals. We come back to them. Everything is done by commission approval. Every dollar that is spent is done by commission approval. Our dot is the commission is our oversight, and they know everything that we do. We will give them a recommendation on which consultant to hire, and they can either accept our recommendation or decide to hire someone else. And then the final reports will be given to them to review. I mean, there is not, I don't want you to, I don't know, there might be some kind of misunderstanding of the role the commission has at the department, but they will be completely involved in this, especially in this particular instance because of the nature of it. Does that
▶ Play
answer your question? Did you need an information request on some of those numbers Senator Desmond sent to the, I mean. If we
▶ Play
could get a report on the Economic Development Fund to know what's spent, how much is there, and if there could be consideration to use some of these funds for the consultants that are going to have to be hired so that we can still fund some of the repairs and maintenance that, you know, needs that are out there. I think that would be helpful, and again, I may visit with some of the commissioners, too, just because I want to make sure, again, that we, if we're going to hire a consultant, I mean, they're going to tell you what you want to hear if we're not careful, maybe
▶ Play
Speaker 22 47:34
not what you need to hear, so thank you. Can you all get that information? I would just like to add to that just a little bit. Under the severity of this whole situation, I do not want them, and neither as a commission, want them to tell us what we want to hear. We want to hear the truth. And I assure you that is what we're thinking when we're having a consultant. We're going to get the truth from Federal Highway Administration. they're taking an in-depth look from the national level at our program we're going to get a good look not telling us what we want to hear but they're going to tell us what we need to hear from not only Federal Highway but from the Office of Inspector General and then just to be on the safe side so that the industry part of everything that the consultant industry people out there that actually know all the cutting-edge technology we want to get what they have to say about our program and i don't want to hear what i want to hear what i'd like to hear is oh you're perfect but i'm not going to hear that they're going to tell us how we can approve why would we spend two million dollars to be told not the truth i want to hear the truth and so does the commission so i'll just leave it at that and if you
▶ Play
don't mind the economic development figures and send that to staff and then they can send it to members okay okay thank you
▶ Play
you. Thank you, Mr. Chair, and I'm right here. So I appreciate that you want to hear what you need to hear, but we have already hired a consultant that came and presented to us. We've already spent taxpayer dollars actually on a consultant, so what about some of those recommendations? How will they be implemented, and what do you look for this consultant to tell you different than what was already hired
▶ Play
Speaker 22 49:28
to tell you the efficiency review that that consultant came in and looked at our processes they looked at everything that we did they had no that we could find any kind of recommendations about our actual bridge inspection program processes there was a little bit in there about training inspectors and that's in in the final report and course we're going to implement all those recommendations we've already gone through that and that'll be happening over the next you know year or so we're going to be reporting to this committee about our implementation you know efforts but you know that that money that was spent looked at our processes but it had no recommendations on the bridge inspection process itself you know how we inspect bridges how you know how that's structured so we don't have anything there follow-up mr. chair so the two million dollars
▶ Play
is going to be just about bridges that's all we're going to learn about with the two million dollars it's going to
▶ Play
Speaker 22 50:33
be directed and it's going to be focused
▶ Play
only on our inspection program thank you mr. chair thank you Representative Wright. Thank you. I just want to say I agree with everything that Senator Dismang had to say, and I want to follow up on Representative Vaught's line of questioning. I know that the guide house report didn't specifically provide recommendations for bridge repair or things like that, but they did make a lot of recommendations for the department overall. And if we're going to be hiring consultants to give us, more consultants to give us proposed things that the department can do to improve processes, particularly related to bridges, it would help to have some confidence that the current recommendations that you've received from consultants are going to be implemented. Did I understand you correctly that you just said that all of the guidehouse recommendations, you intend to implement all of the guidehouse recommendations?
▶ Play
Speaker 22 51:41
the report the final report and then senator dismaying uh you know we had some legislation this time we you know we agreed to i mean we went through that whole process i guess that's the answer yeah i mean that's the point of this committee right that we'll be coming before you and showing you how we're implementing these recommendations and the legislation's in place for us to do that.
▶ Play
Okay, I was just asking, I mean we can't implement a lot of what Guidehouse recommended. I'm just wanting some assurances from from you that the recommendations that you've already received from a consultant are being implemented so that folks like me have some faith that later recommendations are going to be implemented, that they're not just going to exist on paper in a report and then never be implemented.
▶ Play
Speaker 22 52:45
Well, I think your assurance is the legislation that was passed in this last legislative session. I mean, we're required by law to implement these recommendations. Okay, thank you. Representative
▶ Play
Beatty. I was going to follow up on Representative Vaught and Representative Bray's question along with the question on the guide house recommendations. How many of those recommendations have been implemented to date? Well, since the legislation
▶ Play
Speaker 22 53:28
doesn't take effect until... I'm not asking about the legislation. I'm asking
▶ Play
how many of those recommendations that were provided to RDOT have been implemented to date. I can't answer that. Could you provide that information to us at the next meeting? I certainly can. Thank you. Thank you, Mr. Chair.
▶ Play
I'm sorry. I should have asked this a second ago. I was going to ask the same thing that Representative Beatty just asked. As they're implemented, can you update us? And then as you get the new guidance from or the new recommendations from the new consultant, can you also bring those to us so that we can know what those recommendations are and as they're implemented so we can be fully aware. So I'm not caught off guard if somebody asks me something. Absolutely. Thank you, ma'am.
▶ Play
Senator Ingram? Thank you. A couple of things. Let me make, clarify, especially since this occurred in my Senate district. One, I think RDOT is to be commended for standing up, taking responsibility, and addressing this in a very quick manner. realize the enormity of what they were dealing with. They have worked fantastic with local government. You saw today, we're maybe five to 10 minutes on backups now, and so I applaud the highway department for taking responsibility, dealing with it, and then moving to come up with best practices. I think that's normal in business and I'm glad to see that that is being undertaken by the highway department. To clarify maybe Senator Disping's question, some of you might not remember, but when we had a crisis regarding our federal match money, I think that year Mississippi was unable to generate enough revenue to meet their match, we came up with a plan of $50 million that would get us $200 million for our match. And that plan, we tweaked some things, put some money over there, and then set up a 25% of the surplus. But the deal was $50 million. As you know, in this legislative session, we repeal that 25% of the surplus and held it to 50 million instead of 250 million is what the surplus would have been. The money that I think Senator Dismaying is talking about special projects, that money is what was used for closing any project project and that money came out of the governor's quick action fund and it was transferred over, as I remember, to the highway department to pay for infrastructure for major projects. I think, Senator, didn't we cut the quick action fund by 20 million? Aren't we down to 30 million now?
▶ Play
That wasn't quick action money. We cut the
▶ Play
Speaker 9 57:18
quick action. The governor did not transfer
▶ Play
quick action money over for that. for no projects. That was surplus money that is gone, but we approved them to use money for projects based on AEDC, I mean, a recommendation from AEDC that a cost of benefit that if a major project came like Amazon, that we would use this pool of money instead of going through quick action, correct? We did not,
▶ Play
no sir, the governor and RDOT
▶ Play
to prove that amongst each other. Well, yes, I understand that, but we had budgeted the money and that we had budgeted the money for them to use, and then they decided that instead of doing it that way, that they were going to use the money, that the highway department would hold the money for special projects that was for AEDC, so I guess my point is, is that this isn't RDOT's decision, This is AEDC and the governor's office decision whether to use this money on projects that outstrip the opportunity, these, as you know, these projects on roads and sewers cost far more than any local entity has and in economic development, you cannot get in the game if you don't have incentives and this is just part of an incentive package, so I just wanted to try to make, make, make that clear and I've probably made it less clear in attempting to clarify it. Thank you. Representative Wright.
▶ Play
Lori, on this money, this $2 million for the consultants, just wonder, was part of this for the job that actually is taking place on the bridge that's, that's, you know, being fixed now? Did we get them involved in this? No. No. No. No. No. Oh, okay. Thank you. Do we have any other
▶ Play
Speaker 51 59:14
questions? Me? 80? I see 80. Do you guys push? Yeah, I'm on.
▶ Play
Speaker 140 59:26
I'm on. Okay. Oh. Just go ahead then. Just go ahead. Just go ahead. Just
▶ Play
go ahead. Just go ahead. Just go
▶ Play
ahead. this was waiting to be recognized um thank you mr. chair um and you may have addressed this but traveling over i-55 um i've had to do that a couple of times since this um this accident or this failure has occurred i'm concerned about west memphis and the traffic through there can you just describe for me um some of the things that y'all have done in order to try to alleviate that traffic through west memphis and the incredible amount of congestion that you know obviously as a result of this sure i'll get steve
▶ Play
Speaker 22 1:00:31
to go over that again for you
▶ Play
Speaker 26 1:00:34
yeah so again uh the example i used was last thursday and wednesday which were some of the worst days uh that we've dealt with again we do a daily call uh with memphis west memphis R.DOT, T.DOT, the locals and talk through and again it's been great collaboration but it was bad last week so as the issue has been as the interstate backs up because the I-40 closed and I-55 being the only route we were seeing gridlock and when that gridlock occurs and traffic backs up inherently those vehicles that we call diversion they are going to try to find a way around they're going to get off at 55 go through Marion There were vehicles, trucks that were getting stuck in neighborhoods. I know we've coordinated with the mayor, and they were having to do some traffic control. Trucks coming in on 40 would divert and try to get off on 70, come through town. Traffic signals were being overloaded. Emergency services couldn't get through. It was bad. But again, all that was because the interstate traffic was getting off, trying to find the fastest way around. And so the changes we made here based on this map by, again, the joint effort from these changes and what TDOT did at the Crump Interchange, allowing that one lane. Imagine we had 85,000, 90,000 vehicles a day on two different interstate routes, all not only down to one interstate, but then down to one lane.
▶ Play
I know, it was horrid. I couldn't, I mean, you were merging people into one
▶ Play
Speaker 26 1:02:14
lane. Right. So that was why we're so happy to see that TDOT was willing to go in and make those. It's
▶ Play
also on the Arkansas side, though, too, that we were merging into one lane. This was a
▶ Play
Speaker 26 1:02:27
couple weeks ago. Well, we were, so I-40 has always been merging to one lane. So do you mean coming into West Memphis or through
▶ Play
town? I believe it took me like two hours to drive 15 miles from West Memphis over the bridge into Crump Avenue, Crump Boulevard. So it was all through that. So it merges into one and then back into two when you're going over the bridge. And it was just a nightmare. So is there any chance to be able to, I mean, have you opened that up, I guess is my question. You have opened that up. Okay, my second question is, I've listened to the 911 call that occurred the day that this happened. And in listening to that 911 call, there was not clear information given by our consult department of transportation to the 911 operator. Do you have the ability to train your employees to say exactly a script as to what needs to happen and why it needs to happen so that it's being clearly communicated? because I've listened to that call and the 911 operator still could not understand what was going on with that situation and it was because whoever was on the phone you know was having a side conversation with two or three people and I understand that that was an emergency situation however there's got to be a very clear concise conversation in a situation like that and it just goes to I think the recommendations and everything that people are asking here is management and managing these situations and making sure that you have people that are communicating clearly with those other folks and so I was concerned because you know listen to the conversation it was so frustrating because I said just say this and you would be clear as to why we need to shut the bridge down so that's a little thing but I think it's it's emblematic of the whole perhaps management of how this occurred but I think that's something that you need to think about to be honest with you and and to clarify what I think other people are saying like a list this is a recommendation this is a response this is a recommendation this is a response here's the timeline this is when we did this I mean you don't have to wait on legislation if it's a good idea it's a good idea i would think that you know department of transportation said this is a really good recommendation we don't have to wait for legislation we need to go ahead and implement this we need to act on this this is what we've done this is how we've done it we're on the we are on this we're responding we've read this we have processed this this is what we're doing with it this is a timeline of how we're doing it you know i i mean i think that would be a reasonable approach to the job that you have. So I think that's kind of the frustration you're hearing. But thank you. Do we have any other
▶ Play
questions? the question. I don't have anybody to do it.
▶ Play
Speaker 26 1:06:07
Yes, and again, just to clarify, so the experience that you're describing was prior to our changes, prior to what RDOT and TDOT has done to make improvements. And since then, again, I don't want to jinx us. We have been very pleased, but since last Friday and what these charts show, again, we have the great data that we have that shows, again, you can see it, you can experience it, but since our changes, it's actually exceeded my expectations. It is free flow and we've been getting lots of recommendations or encouragement from the locals saying, wow, I'm not sure what you did, but it's great. So we're hoping to keep that
▶ Play
going. Thank you. I'll just respond. Of course it's going to be delays. I mean, I think everybody expects that, right? I mean, five minutes is probably, I mean, at certain times of the day, you're going to be expecting to probably sit there for a lot longer. And I don't, I'm not trying to push anybody down to a five. I'm concerned about the businesses along those routes you know and I'm glad to hear you're working with local my my question was really the infrastructure of West Memphis and those streets and those businesses and the drive I mean I'm sure they are frustrated too because everybody is trying to get jump off the interstate and so I'm concerned about those businesses and the traffic in and out of their you know their their driveways and their businesses that that's really the concern to have I mean everybody expects delays and I'm glad to see that you're taking those those precautions but you know it becomes problematic for your neighborhoods and for your for all of that and traffic accidents occur and things like that so that's that was just really my big big concern and then the stress that we're putting on the I-55 bridge thank you
▶ Play
any other questions comments anyway I want to thank you all for the presentation thank all of the RDOT folks for being here I also want to mention we have Commissioner Marie Holder and Commissioner Keith Gibson with us we're glad to have you today do you all have anything else to add you're done okay appreciate it our next item is Executive Director Brian Day with the Port of Little Rock he's got a presentation for us and y'all should have a handout from him thank
▶ Play
you so much for allowing mr. day to come before the committee today we have been dealing with highways but we have not looked at the impact that is miscue had on waterway traffic, and we also have not fully realized the impact of 50 years of the port, and I wanted to invite him here to visit with you about what is going on in this state 50 years later. So thank you, Mr. Chair, for allowing us to have this portion of the agenda.
▶ Play
Speaker 155 1:09:24
Thank you, Mr. Chair, members of the
▶ Play
Speaker 166 1:09:30
committee, and thank you Senator Chesterfield for having me come today. I'm grateful that's a tough act to follow with our dots so hopefully my comments will will inspire you to think about the waterways and as we move forward I would also be remiss if I didn't acknowledge that Miss Cassandra Caldwell was in the office Miss Caldwell is the director of the Arkansas Waterways Commission which is your state agency that oversees America or Arkansas's inland waterways as Senator Chesterfield said we have recently celebrated the Arkansas River's 50th anniversary. In early June 1971 President Richard Nixon dedicated the river in the port of Tulsa and Catoosa and 50 years later the Arkansas River is a major economic impact asset for your state and your communities. What I wanted to do today was just share a little bit about the inland waterways system, share a little bit about the Arkansas River and what it is today and the challenges it faces because it too is a piece of infrastructure that needs to be invested in and monitored. And then while I'm here just talk a little bit about the Port of Little Rock because that's that's what I do every day. So if you'll bear with me I'm going to refer to a few notes on my phone. You do have in front of you a packet of information about the Port of Little Rock as well as the impact of Arkansas's waterways and some specific details about the Arkansas River. So America's inland waterway system consists of about 25,000 miles. Arkansas has the third highest number of navigable waterways in the country. Some people find that hard to believe, but you have the Mississippi, the Arkansas, the red, the white, and the Ouachita. Each of those rivers has different elements to it, but the Mississippi and the Arkansas are major contributors to the economy. Most of America's inland waterway system relies on the Mississippi River as its backbone and the Arkansas River flows into the Mississippi. Of course we know from studying history that America's inland waterways were important and towns located on the waterways as Little Rock did several hundred years ago. They used the waterway to transport people and goods and services and if you were lucky enough to have a waterway in your community, sorry I lost my phone, then you usually built there. In the mid-1800s the railroads came to town and people began to think a little bit less about the waterways and they weren't so important. But in the early 20th century, we recognized that waterways were critical to commerce, transportation, tourism, flood control, and other elements that make a state or a community great. Of course, the Arkansas River was born out of the flood of 1927. If you've studied history you know that that was a major flood it had congress begin to think about what we're going to do to control and manage our rivers for strategic purposes as well as for flood irrigation hydropower tourism environmental recreation and of course commerce in terms of commerce I just have to say that waterborne transportation is the cleanest the the greenest the cheapest and the safest way to move goods and commodities I'm going to give you a couple of examples. You look at a semi-truck, and you were earlier, you were talking about all that traffic on the interstate going from West Memphis to Memphis, but a single semi-truck can hold about 26 tons, about 900 bushels, and about 7,800 gallons of gas. You can put all of that, if you take a rail car, a single rail car can hold about 112 tons, about 400 bushels of grain, and about 34,000 gallons of gas, but let's talk about a barge. A barge can hold about 1,500 tons, 52,000 bushels of grain, or 453,000 gallons of fuel. Taking that one step further, a truck gets about 155 ton miles per gallon, a rail car gets about 413 ton miles per gallon, but a barge gets 575 ton miles per gallon taking those effects into taking those facts into account we see that barge traffic is the best way to go now not everything can be moved on barges but we look at grain fertilizer oil scrap rock aggregate those types of raw resources are what we thrive on with the Arkansas River and Arkansas's inland rivers if the America's waterways this is this is what I want you to acknowledge, if America's inland waterway system did not exist, it would add 26 million trucks to America's highways. 26 million trucks are taken off the road every year because people are able to move their commodities by barge. Let's talk about the Arkansas River for just a little bit. As I said earlier, that the river was born out of the flood of 1927, and we had Senator McClellan from Arkansas and Senator Kerr from Oklahoma who worked together to build a consensus in Congress to fund this civil works project. At the time, it was the most innovative and largest civil works project ever funded by Congress, and it took years to get it funded because not everyone agreed of its importance and its value. But those two senators stuck to their guns. They lobbied, they brokered, they negotiated, they brought a bipartisan bill to Congress, and Congress funded 1.2 billion dollars, 1.2 billion with the B, you can't build anything for that today, but that 1.2 billion dollars built 450 plus miles of navigable waterways from Tulsa, Oklahoma to the Mississippi River. Ironically they were concerned that the project would not be fully funded so they opened, they built the first locking dam in Dardanelle. Who hears from Dardanelle? Surely someone, there you go you were the first and today dardanelles an amazing recreational component a great lake great fishing tournament campgrounds and all of that because of the lock and dam system and then they started building out from there the first barge reached little rock arkansas in 1969 because they had built coming up through the locks and dams and then the first barge reached tulsa oklahoma in 1971 There are 18 lock and dams and 13 of those are in Arkansas, five of them are in Oklahoma and you've got some facts and figures in front of you but in 2018 the Arkansas River shipped about 18 million tons of commodities in the Arkansas side with a value of about 4.5 billion dollars. I want to talk a little bit about floods because that we have to think about that as we think about this infrastructure. As I mentioned earlier the locks and dams do provide commerce but they also provide flood control. You all know about the 1927 flood. In May 1990 there was major rains in eastern Oklahoma and western Arkansas and they in the raise the level of water caused dams that were the capacity of the locks and dams were exceeded. Floods were released and and and the river flooded. The good news is the system worked and damage to property was minimal. We had the same event in 2019. 2019 was the largest flood on record since the locks and dams existed and was the fourth largest flood on record since we've been keeping records. We did have tragedies at Dardanelle because of the levee. The levee breached but other than that most of the communities along the the Arkansas River were saved because the locks and dams did their purpose. I'm not really here to talk about levees, but that is a piece of infrastructure. I know you all have addressed it and we've tried to work on it, but we need to not lose sight of that. So the river works. It's 50 years old last week, two weeks ago, and we're continuing to thrive and it is a valuable economic engine. But the river is not without challenges. Ms. Caldwell would tell you that the Corps of Engineers estimates there's $250 million worth of critical needs on those 18 locks and dams. They define a critical need as something that is a piece of maintenance or an issue that needs to be maintained that has a 50% chance of failure. Think about this. If there are six lock and dams below Little Rock, if one of those locks and dams fails, the 12 public-private port terminal operators on the Arkansas River are probably out of business. So we have to make sure that Congress funds that infrastructure adequately and takes care of those preventative needs. You all have addressed in the past, I think most of you probably are aware of this, there's the Three Rivers Project where the White, the Mississippi, and the Arkansas River come together. For whatever reason, the Corps of Engineers decided at the time instead of tying the Arkansas directly into the Mississippi, they built a man-made channel and someday Mother Nature is going to put the rivers back the way she wants them and if we don't control that system the arkansas river would be out of business the good news is because of your support several years ago because the work of the arkansas waterways commission congress has has funded and designed what they call the three rivers project which will stabilize the mouth of the river and 450 million dollars has been placed in the president's budget this year to make sure that project is done it's a real concern and it's basically a long man-made levy that someday it could breach to bring the rivers back together and commercial traffic could not come up the river and then finally the other thing you've probably heard about on the Arkansas River is we as operators on the river believe that the channel should be 12 foot deep right now it's guaranteed to nine feet but if you're moving rock or low-value commodities it's hard to compete with 12 foot rivers. My good friend Scott McGeorge out of Pine Bluff ended up closing a quarry in the Dardanelle-Russellville area because he could not load the barges to 12-foot draft and he could not compete with quarries in Kentucky and Tennessee and Ohio who were using the deeper rivers to move that rock to New Orleans in the Gulf. The good news is, again, because of work of the Waterways Commission and others in Congress, Governor Hutchinson when he was in Congress, Senator Bozeman and others have supported that, and the Corps of Engineers has refunded the study of that project to see if it makes sense to do. I want to wrap, I'm not yet ready to wrap up, but I want to talk a little bit about the port, and I want to just say a few closing remarks and hopefully answer some questions. How many of you have been to the port of Little Rock, or how many of you have driven by the port of Little Rock? How about that? You know where it is. It's on the eastern edge of town, I want you to think about this. In 1959, the city of Little Rock, politicians, the visionaries like yourself said, you know what, we, as when this river gets built, we need to have a port. And for those of you that grew up in Little Rock in 1959, my dad, who's no longer with us, talks about in the summer walking across the river from downtown Little Rock to north Little Rock because it dried up. And he talked about in the springs it flooding and jumping the banks. So in 1959, the visionary politicians, the political leaders of the community said, we need a port and someone put their finger on a map and said let's put it here and think about 1959 the interstate 440 didn't exist in fact the interstate system didn't exist the bill and Hillary Clinton Airport was Adams field a small gravel runway the community of College Station was just now being built and quite honest honestly there wasn't anything out there but a bunch of farms and they talked about there was a farmer out there raising goats that mingled around where everything is today the city of Little Rock citizens believed in those visionary leaders and they passed a one million dollar bond issue and the Port of Little Rock was born. Fast forward today, 60 years later on paper, about 50 years later, we kind of opened about the same time the river did, 50 years later we are 4,000 plus acres in size, we have 43 businesses from five foreign countries and there are 7,000 people that drive to the Port of Little Rock every day. For you as state leaders and elected officials, I want you to know that those 7,000 people come from 23 counties. We did a labor shed study last year. A third of the people that work, or a third of the state, a third of the counties in the state of Arkansas send someone to work at the port of Little Rock every day for a growing job. We are continuing to attract and recruit businesses from around the world, and that employment number will only grow. the point I want to make on that is as you talk about infrastructure, you work with RDOT and others, this major infrastructure investment in the 1960s and 70s that is known as the MCAR and some McClellan-Kerr Arkansas River Navigation System has paid dividends a hundredfold. The economic impact of the Port of Little Rock to the state of Arkansas is $500 million a year in wages, investment, infrastructure, return to taxes, local taxes, state taxes, property taxes. Earlier you were talking about Amazon, and I will tell you that we are grateful the state did help with that economic development fund and is installing traffic signals at the interstate exit ramps to accommodate the 2,000 plus vehicles that Amazon will bring to the port every day when they open in about three weeks. We also use federal funds and city and county funds to add 11 million dollars of infrastructure improvements to that project to accommodate those needs. But the Port of Little Rock, because of that innovative infrastructure investment that Congress made, because of the support of the state over the years with the Arkansas Waterways Commission and some of the grants that you've provided and the support that you've given us and other ports on the river, we're not alone. We have Pine Bluff and Fort Smith and public ports on the river. There's a number of private ports. The Oakley family does very well. The river is important. 55,000 jobs a year are supported by the Arkansas's inland river system. The numbers are in your packet. I don't know them by heart, but it's the real deal. And as you talk about infrastructure in this committee and you look at how to spend funds, you've got some COVID relief funds. I would encourage you to think about Arkansas's waterways, roadways, railways, all of those things matter. And it's a great story to tell. A couple of industries at the port like Wellspun, the Indian Gas and Oil Pipe Company, they could have located anywhere in the world, but they located in Little Rock because of the Arkansas River. And that's something that all of you should be proud of. And communities up and down the river from Fort Smith to Moralton to Conway to Ozark, they're taking advantage of this system. And we need to not lose sight of that as we plan for the future in the next 50 years to make sure that congress knows that you believe it's an important asset and that they're willing to continue to invest in it. I could talk about it all afternoon. I know it's close to quitting time or end time and I would like to thank you for the opportunity to visit with you today. I'd like to thank Senator Chesterfield for the invitation and I'd be glad to try to answer any questions
▶ Play
if anybody had any. thank you i very much enjoyed your presentation um and i i love the story of the arkansas river i just think it's it's such a neat um i i just i really enjoy it um and i i appreciate the history you have i apart from you know the incredible amounts of economic activity that is generated through the barges and the commercial traffic that's on the river. This river being a navigable river, I know I've had some conversations with some people in the past that were primarily developers, but kind of as visioning the Arkansas River more than just, you know, a river for barge traffic and commercial type purposes. Have y'all talked about that as far as, you know, kind of building out an infrastructure of, you know, places where, or the opportunities for it to be more of a tourist, you know, destination for navigation. I know there are some rivers in Georgia that empty out into like Savannah, and we toured that port when we were there for a legislative conference, but that used that, you know, kind of area for really just tourist and travel and leisure so but you would have to have the necessary um gas stations you know obviously along the way to be able to accommodate that type of a truck but have y'all have y'all
▶ Play
Speaker 171 1:26:36
had any conversations or discussions about that senator that's a great
▶ Play
Speaker 166 1:26:41
observation um i'll preface the comments i grew up in little rock and i remember growing up my mother and dad said, stay away from the river, it's dangerous. And it's not. It's an amazing body of water. As a whole, we, I'm talking statewide as a whole, we do not do a good job of explaining or promoting the benefits of tourism and recreation and wildlife and fishing and duck hunting and environmental control. Dardanelle does a very good job of that. Of course, primarily because if you were dropped in the middle of Lake Dardanelle, you would not realize that's the Arkansas River just because of the way of the geography. I do know there are communities, the city of North Little Rock, Lisa Farrell and Jim Jackson have done an amazing job embracing the river with their private development, the marina, the river trail, the bike trail, the apartment living, the city of Ozarks trying to do some things there in their river. It is something that we must do a much better job of it. My colleagues at the port of Muscogee, they have a private marina at the port. They do recreational activities there. It is not, we need to, we don't do enough at the port of Little Rock, and we really don't do enough as a state to remind people that it is a recreational asset, and it should be embraced and taken advantage of, but that's a good, a great
▶ Play
point yeah i i've known lisa for a very long time and um my i have a brother that has a sailboat there and um but and and it's been so much fun you know to set sail right there especially at dusk and downtown little rock and it's just really a beautiful spot but um but but also the navigation down it you know being able to really think about being able to take a boat you know from here to the Mississippi River and down is kind of a fun, neat adventure that I think, you know, we could
▶ Play
Speaker 166 1:28:39
perhaps capitalize on. We should. Pre-pandemic, we did get a call from a cruise line that wanted, you know, they do a lot of river cruises in Europe, and they were toying with putting together a river cruise up the Arkansas. Of course, then the pandemic hit and everything came to a screeching halt, but my hope is that maybe next year they'll reach back out to us. They were going to have a stop in Little Rock and stop in Fort Smith it would have been a really neat deal like they do that in Europe every day yeah I
▶ Play
know that's and that was another reason why I asked the question
▶ Play
Speaker 166 1:29:09
because so hopefully they'll we've got their contact and you've that reminds me I need to reach back out to them but hopefully once the cruise industry comes back to life that maybe they'll put a river cruise ship on the Arkansas that would come out of New Orleans up the Arkansas up to Fort Smith and turn around it'd be an amazing experience it
▶ Play
would be incredible and I just think it's such an opportunity to take advantage of because of what we have you know to draw a lot of people to our state and through our state and so i i would just encourage you to do that because i just think that would be one of the coolest things i may put you i may put you in charge of that assignment i would love it me and senator chesterfield would you go on it with me well it's my hometown so i appreciate that i would i would volunteer to do that we'll reach out to
▶ Play
Speaker 166 1:29:57
both of you. It's something we need to do
▶ Play
a better job. I totally would volunteer to do that and Greg Napholtz is a friend who's very interested in that as well. Thank
▶ Play
Speaker 137 1:30:08
you. Any other questions, comments from anyone? Thank you, Director. Well, thank
▶ Play
Speaker 166 1:30:13
you and I know our story's a little easier to tell than the predecessor, but all of you are welcome to come to the port. Please don't lose sight of Arkansas's inland waterways as we look at future policies and programs. It's very important to our state, and we need to keep reminding Congress that they need to invest in the system. So thank you for your time this afternoon, and you have my card in the information. If you have any questions or you want to come out and ride the tugboat, just let me know. Thank you. Thank
▶ Play
you. Seeing no other business, we are adjourned.
▶ Play
Unknown speaker 1:30:56
You
▶ Play

Agenda

A. Call to Order

6:34 - 7:41 2 segments 2 speakers

B. Report on the Progress of each Highway Construction Project of $10 million or More as Required by A.C.A § 27-65-107(a)(19) [Exhibit B] - Lorie Tudor, Director, Arkansas Department of Transportation

7:41 - 9:11 7 segments 5 speakers 2 documents

The Director of the Arkansas Department of Transportation, Lori Tudor, opened the item by distributing the third-quarter report that lists all highway projects of $10 million or more and introduced two senior staff members, assistant chief engineer Steve Frisbee and deputy director/chief engineer Vines. [7:47] [7:57] [8:09]

She invited committee members to pose questions about the report, but no questions were recorded before she moved on to provide an update on the I-40 Hernando de Soto Bridge project. [8:19] [8:52] [9:09]

C. Update on Hernando de Soto Bridge on Interstate 40 over the Mississippi River - Lorie Tudor, Director, Arkansas Department of Transportation

9:11 - 1:08:36 156 segments 17 speakers

Director Tudor and Chief Engineer Vines briefed the committee on Arkansas’s bridge inspection program, which monitors 12,776 structures-including 7,383 state-owned bridges and 765 fracture-critical bridges-inspected at least biennially (annually for fracture-critical members), has never been found non-compliant by the FHWA, and employs enhanced QA/QC teams, drones and non-destructive testing. [9:55] [10:26] [11:00] [11:35] [12:10] [12:49] [13:22] [13:53]

Tudor explained that a fracture discovered on May 11 2021 on the Hernando de Soto I-40 Mississippi River bridge triggered an immediate closure, the formation of a multi-agency expert team (FHWA, TDOT, HNTB, Michael Baker International), termination of the inspector responsible for the missed defect, and ongoing investigations by the DOT Inspector General and a FHWA special audit. [18:58] [19:32] [20:03] [20:35] [21:09]

The department outlined a two-phase repair strategy-phase 1 stabilization and phase 2 fabrication now underway with Kewick Construction-while noting a budget increase from $3.5 million to $6.4 million for consultant reviews and equipment upgrades, and reported that traffic-management measures on parallel I-55 (lane reductions, a temporary middle-lane closure, and coordinated lane additions at the Crump Interchange) have cut travel delays by roughly 20 % and restored near-free-flow conditions. [21:42] [22:15] [22:47] [23:45] [24:15] [24:45] [25:18] [30:43] [31:16] [31:47] [32:22] [32:58] [33:36] [34:12] [34:43] [35:13]

Senators questioned the $2 million allocated for additional consultants, receiving clarification that the funds come from state allocations, will be procured through a competitive RFP process requiring commission approval, and that a report on the balance of the special-projects/economic-development fund will be provided; Senator Missy Irvin also criticized the unclear communication during a 911 call, urged staff training on precise scripts and improved emergency management, and expressed concern that traffic delays from bridge closures could harm West Memphis businesses and add stress to the I-55 bridge. [41:07] [41:30] [41:32] [41:49] [41:52] [42:03] [42:08] [45:35] [45:49] [46:19] [1:03:11] [1:03:41] [1:04:13] [1:04:47] [1:05:22] [1:06:50] [1:07:12] [1:07:48]

Speaker 26 reported that recent changes implemented by RDOT and TDOT have markedly improved traffic flow, exceeding expectations and earning positive feedback from local drivers, and Representative Ron McNair thanked the presenters, noted the attendance of Commissioners Marie Holder and Keith Gibson, and closed the discussion to proceed to the next agenda item. [1:06:07] [1:06:38] [1:08:00] [1:08:24]

D. 50 Years Later: A Review and Forward Look at Arkansas’s Waterways - Bryan Day, Executive Director, Port of Little Rock

1:08:36 - 1:30:44 52 segments 7 speakers 1 document

E. Other Business

1:30:44 - 1:30:44

F. Adjournment

1:30:44 - 1:30:58 1 segment

Speakers

Speaker 1
1 segment
Representative Ron McNair Unverified
12 segments
Speaker 8
1 segment
Speaker 22
44 segments
Speaker 26
26 segments
Speaker 38
28 segments
Speaker 30
1 segment
Speaker 41
1 segment
Speaker 70
1 segment
Senator Linda Chesterfield Unverified
5 segments
Senator Jonathan Dismang Unverified
16 segments
Representative DeAnn Vaught Unverified
4 segments
Representative David Ray Unverified
3 segments
Representative Howard M. Beaty, Jr. Unverified
3 segments
Senator Keith Ingram Unverified
8 segments
Speaker 9
1 segment
Representative Johnny Rye Unverified
1 segment
Speaker 51
1 segment
Speaker 140
1 segment
Senator Missy Irvin Unverified
23 segments
Speaker 155
1 segment
Speaker 166
37 segments
Speaker 171
1 segment
Speaker 137
1 segment