ALC-Highway Commission Review and Advisory Subcommittee

August 25, 2022 ·3:00 PM ·Room B, MAC ·47:37
Video Transcript 6 documents

Summary

Machine transcript

May contain errors. Verify important quotations against the official video.

About transcript accuracy
Source
Whisper
Model
ggml-large-v3-turbo.bin
Processing date
October 19, 2026

E. Federal National Electric Vehicle Infrastructure Formula Program Update - Rex Vines, Deputy Director and Chief Engineer, ARDOT 1:26

Rex Vines presented ARDOT’s NEVI Formula Program plan, explaining that Arkansas will receive $54.1 million over five years, will not own or operate charging stations, and must install DC fast chargers meeting specific power and spacing requirements, with 40 % of benefits targeted to disadvantaged and rural communities. [2:14] [2:38] [3:10] [3:37] [3:42] [3:55] [4:19] [4:52] [5:25] [6:00] [6:33]

He outlined the submission of the deployment plan on July 27, its positive review by the joint FHWA-DOE office, anticipated final approval in September, and the intent to award contracts to private owner-operators at an estimated $1 million per site. [5:25] [6:00] [6:33] [7:08] [7:40] [8:10]

Senator Chesterfield questioned why state-owned highway property could not host chargers; Vines responded that federal law prohibiting revenue collection on interstate facilities prevents ARDOT from competing with private operators. [15:32] [16:00] [16:07] [16:19] [16:31] [16:36] [16:47] [16:51] [17:19] [17:31] [17:55]

Several legislators raised concerns about charger speed, siting at retail locations, and impacts on trucking and highway revenue, to which Vines noted the program’s reliance on market-driven private placement and ongoing stakeholder engagement. [18:08] [18:25] [19:00] [19:31] [20:01] [20:11] [20:28] [20:38] [20:56] [21:10] [21:32]

C. Review of July and August 2022 Monthly Updates of the ALC Efficiency Study Recommendations Rules for Implementation [Exhibits C1-C2] - Rex Vines, Deputy Dir… 31:35

AR​DOT staff highlighted July-2022 updates, including a contract for a stakeholder-inquiry tracking software (GovQA), implementation of digital auditing in procurement, and expanded training programs that have reached over 3,400 employees. [32:30] [33:02] [33:39] [34:11] [34:47] [35:22]

The August-2022 report was summarized with the formation of a contractor-performance evaluation committee and a request to proceed with a computerized maintenance management system contract to satisfy recommendation 7 of the Guidehouse study. [36:26] [37:02] [37:38] [38:09]

Senator Chesterfield asked when the contractor-performance work would reach 50-60 % completion; staff indicated rapid progress but could not provide a specific date. [38:27] [38:43] [38:53] [39:07]

Senator Hester briefly interjected about item D before being redirected, confirming no substantive discussion on that item at this time. [36:13]

D. Review the Proposed Contract with Data Transfer Solutions (DTS) to Develop a Maintenance Management System for the Implementation of Efficiency Study Rule R… 39:46

AR​DOT presented the proposed $1.63 million contract with Data Transfer Solutions to implement the VueWorks maintenance management system, noting the procurement process (11 proposals, demonstrations, negotiation approval) and that no public comments have been received on the notice published on July 26. [39:48] [40:22] [40:53] [41:29] [41:59]

Senator Hester asked how the system would help identify and track pothole repairs; staff explained that the software will log reports from employees and the public, enabling faster response and performance monitoring. [42:29] [42:59] [43:19] [43:33] [43:36] [43:46]

Senator Pitsch inquired about communicating repair timelines to the public; Vines indicated that while not part of this contract, the system’s integration with a separate government-QA platform will allow tracking of citizen reports and communication of status updates. [44:50] [45:17] [45:31] [45:38] [45:49] [46:19] [46:42]

Official video page ↗

Transcript

Transcript available SliQ live captions ✓ Whisper ✓ Download .txt
Machine transcript

May contain errors. Verify important quotations against the official video.

About transcript accuracy
Source
Whisper
Model
ggml-large-v3-turbo.bin
Processing date
October 19, 2026
Unknown speaker 0:00
Thank you. Thank you.
▶ Play
Speaker 2 1:00
I'll bring the Highway Commission Review and Advisory Subcommittee to order. We're going to, without objection, we're going to bring the item E up to the beginning of the agenda. So you know objection, we will begin with the Federal National Electric Vehicle Infrastructure formula program update uh rex if you want we'll come forward and whoever you need there and and introduce yourself and you're welcome to
▶ Play
Speaker 44 1:51
proceed rex finds the deputy director chief engineer for arkansas department
▶ Play
Speaker 5 2:01
transportation I'm Brad McCaleb, I'm the division engineer for transportation planning and policy with
▶ Play
Speaker 2 2:06
the Arkansas Department of Transportation. You're welcome to proceed, whoever
▶ Play
Speaker 5 2:14
wants to go first. All right. Senator Johnson, Representative McNair, and members of the subcommittee, I thank you for the opportunity to be here today and share with you the department's efforts related the National Electric Vehicle Infrastructure, otherwise known as NEVI Formula Program. Our overall approach to this program has been to meet the federal requirements while maintaining a free market perspective in order to maximize the potential benefits for the state of Arkansas. To that end, RDOT has determined that we will not own, operate or maintain nevy charging stations nor will we install any of them on our properties we do not intend to use state funds for the non-federal match to this program for the implementation of the program and the charging station owner operators will be required to provide at least a 20 non-federal match for the program my presentation today will cover some Some basic information about electric vehicles, an overview of the NEVI program, a description of the Arkansas Electric Vehicle Infrastructure Deployment Plan, and the next steps in our process. I
▶ Play
Speaker 2 3:37
don't see any presentation package, did you all provide anything?
▶ Play
Speaker 44 3:42
We may not have. I apologize. a copy of the presentation at the end.
▶ Play
Speaker 5 3:55
All right. Thank you. Sorry about that. All right. So there are three categories of electric vehicles and chargers. Hybrid vehicles have an engine and charge an electric motor rather than needing to be plugged in to charge. Plug-in hybrids have an engine and an electric motor that can be charged with either a level one or level two charger depending on their design level one chargers use a standard 110 volt wall outlet they provide about a five mile range per charging hour the level two chargers use a 208 to 240 volt outlet they're the most common type of chargers that you'll see in a public location And they deliver about 25 miles of range per charging hour. Battery electric vehicles do not have an engine. They have a battery and direct drive electric motors at the axles. And they utilize the DC fast chargers. A DC fast charger is what the NEVI plan is focused on implementing across the nation. They require at least a three-phase, 400-volt commercial power from an electric utility company. They can deliver approximately 100 to 200-plus miles of range on a 30-minute charge, and they're primarily for long-distance travel. The Infrastructure Investment and Jobs Act, or EJA, includes $7.5 billion for alternative fuels infrastructure with two different components. The first one is the $5 billion NEVI formula program. Arkansas is scheduled to receive $54.1 million over the next five years from this program. The second component includes $2.5 billion of competitive grant funding that is evenly split between EV charging stations and other types of alternative fuels. We anticipate that the competitive grants will be available in November of this year. The NEVI program requires that interstates and designated electric alternative fuel corridors have a publicly accessible DC fast charging station every 15, excuse me, every 50 miles along the corridor that is within one mile of an exit. The charging stations have to have at least four 150 kilowatt charging ports that can operate at the same time, delivering 600 kilowatts of power per hour on demand. By comparison, the average U.S. home uses less than 900 kilowatts in a month. The station must have a combined charging system port, which is a specific plug configuration that is common to most vehicles. As a result, Tesla chargers, which use a proprietary port, are not eligible for this funding at this time. The NEVI program also requires that 40% of the benefits be targeted toward disadvantaged and rural communities in the state. Currently, there are a total of almost 500 miles of interstates and designated electric vehicle corridors in Arkansas. About 63% of these facilities pass through disadvantaged communities and about 70 percent of them pass through a rural community in Arkansas. RDOT will engage with equity-based and rural communities to better understand the needs, priorities, and benefits as we move forward with developing the implementation of the program. We started working on the plan in late May. We submitted our plan to the Joint Office of federal highway administration and the department of energy on july 27th we've been informed that the joint office has reviewed the point our plan they commented that it was very concise and easy to read they noted that we engaged in strong coordination and made great use of the graphics to explain the plan additionally they submitted our table of known risks and challenges to the the Federal Highway Administration headquarters as a best practice example for other states. We anticipate final approval of our plan by the joint office in September of this year. Federal Highway Administration released a 90-day guidance back in June for use in developing the plan. A formal plan template was included in that guidance, and the items that are shown in this slide are what were required to be addressed in the plan. The first step in our plan development process was to form the project management team, which consists of staff from the Arkansas Department of Transportation, Energy and Environment, and the Arkansas's Clean Cities Coalition. This team meets weekly to coordinate on plan development. Next we brought HNTB, a national architecture and engineering firm that has worked with ARDOT on a variety of projects and to provide assistance. A major component of our stakeholder coordination was the formation of the Arkansas NEVI electrification working group. The working group members assisted with strategic decisions and reviewed drafts of the planned components. To engage with the general public, we hosted a virtual public meeting on June 21st. There were 84 participants that attended, and after a formal presentation, the project management team responded to questions that were posted by attendees. A recording of the event has been posted on our NEVI website for public viewing, along with fact sheets, frequently asked questions, and other resources. The plan that we submitted to the joint office has also been posted on that website. We also engage in initial coordination efforts with our neighboring state DOTs to understand where key gaps might be located along our borders. Because our neighboring states are planning similar competitive procurement processes, we do not know exactly where charging stations will be located at this time. Coordination with our neighbors will continue throughout the NEVI formula program period. Our objective is to fully build out 100% of the interstates and designated electric vehicle corridors to NEVI standards first. which is required by the guidance. Our strategy for accomplishing this is to spur investments in EV charging stations through a competitive procurement program with potential owner-operators. Once we are certified as fully built out, the next phase will be to move to other routes of significance, likely U.S. and state routes with high traffic volumes. If funding remains, after providing sufficient regional coverage, RDOT will use feedback from ongoing public and stakeholder engagement to determine additional priorities. NAVI funds will be awarded through our competitive procurement process to third-party owner-operators. Our initial priority for eligible locations will be to fill the gaps in the charging network on the interstates and designated EV alternative fuel corridors. RDOT will establish pass-fail criteria based on the minimum compliance requirements from the NEVI program and a bonding agreement, as well as additional scored criteria to select final awarded owner-operators. Station owner-operators will be required to provide at least 20 percent non-federal match, and once again, RDOT has determined that we will not own, operate, or maintain NEVI charging stations, nor will we place any of them on our property. The blue dots on this map are existing NEVI-compliant charging stations that exist today. The pink areas indicate a 25-mile driving distance from each of these stations. This map shows 11 gap segments that are not NEVI-compliant at this time. Several of the gap segments are more than 50 miles in length and therefore will likely need two electric vehicle charging stations to span that gap in the coverage and meet the minimum requirements. Locations directly along the border could ultimately be served by stations in our neighboring states. One example of this would be the U.S. 412 corridor that could be served by a charging station located in Oklahoma and eliminate the need for Arkansas to install one in this corridor. Next steps in the process include development of the competitive procurement program, publication of a request for proposals, a review of those applications, and making awards to the owner-operators that are selected through that process, and then the ongoing management of the program, including development of the next annual plan. The NEVI program requires the department to submit a plan each year. The timing on all of this will remain uncertain until federal rules are finalized. We anticipate those rules being finalized sometime this summer. We will have to incorporate those final rules into our competitive procurement program, and it's our intention to release that program to coincide with the final rulemaking process. Based on information from the top 10 electric vehicle charging station companies, we are currently estimating an average cost of approximately $1 million per charging station site. This would include utility site make-ready upgrades, hardware, installation, and everything needed to activate the EV charging station. At $1 million per NAVY site, Arkansas will have sufficient funding in fiscal years 22 and 23 to fully build out approximately 23 locations, leaving a large amount of funding to build out other key routes of significance and additional Arkansas EV charging station priorities. Thank you again for the opportunity to share this information with you today. I'd be glad to respond to any questions
▶ Play
Speaker 2 14:43
that you might have. I have one. How many private owner-operators are there in the United States right now? In the United States? I'm afraid to not know the answer to that
▶ Play
Speaker 5 15:03
question, sir. Are there any in Arkansas that you know of? There are some private owner-operators in the state of Arkansas now. ChargePoint is one of the companies that owns charging stations, operates those. Usually, the charging stations are in coordination with other existing businesses, such as Walmart, or some of the local corner stores with gas stations, Circle K,
▶ Play
those types of facilities. Senator Chesterfield. Thank you, Mr. Chair, and good afternoon. Thank you for being here. Hope to get your little, not little report, but your substantial report in writing so that I can peruse it a little bit better. You have made a decision not to allow any of the property that belongs to RDOT to be used in this capacity. Could
▶ Play
Speaker 5 16:00
you tell me the reasoning why? Part of the reason behind that, some states are allowing these to be located at their tourist information centers or rest stops, But we currently have a restriction on collecting revenue at those sites, and the charging stations will be charging people for access to that electricity. So these are RDOT rules that you will not collect funds,
▶ Play
or is it—it's not state law, is it? That is my understanding. That is state law?
▶ Play
Speaker 5 16:31
Federal law, I'm sorry. Federal law. Because we use federal money for
▶ Play
those—to develop those sites. Because we use federal dollars, if somebody pulls into a rest stop, he or she cannot take advantage of the opportunity then to recharge the vehicle. Is that what you're saying? That would be in
▶ Play
Speaker 44 16:51
violation of federal law? Well, I believe it's—that's correct. Yes, ma'am. One of the primary reasons as well is we're not asking for exceptions from the federal government because we would then be in competition with private entities. And we would be charging or collecting revenue on state highway or federal highways. And that would be direct competition with the gas stations, the other entities who are trying to attract customers.
▶ Play
And we made a decision, and that's federal law that says you can't be in competition. I'm just trying to figure it out. I'm seeing some people back there
▶ Play
Speaker 48 17:31
saying yes, yes. And you're saying, well, no, ma'am. Come on now. The regulations prohibit collection of revenue with interstate rest areas and interstate rest stops. You can't compete with the private sector on the federal system. California has electric charging that they put in as a pilot program. That program, California, the state of California, is paying for the electricity that those people use. So there's no charge to the consumer.
▶ Play
Speaker 51 17:57
Okay, gotcha. All right. Thank you. I appreciate
▶ Play
the comment of you can get 200 miles until you need a half and a half hour charge. I'm an electrical engineer. I belong on blog posts, etc. And it's the new wave of all electrical engineering thought is how do you charge faster? So when you show the chart up here that's got the four chargers, the 600 kilowatt, And those aren't going to be what's going to be there a year and a half. I mean, every project has planned obsolescent in it. But this is a new and emerging technology that's going to be dramatically different. And I hope that we're thinking ahead that I just don't see marketplace where people are going to drive 200 miles and sit there for a half hour to recharge and then drive 200 miles and sit there another half hour. If engineers don't get our act together and fix that, where you can charge in the time span of fueling your car, you might have something here. But my fear is that we're not thinking that through, and especially if we're involved in that at some level and saying we're going to have NEVI or whatever the acronym is, rules and bylaws, It's going to be a different charger quickly because they're just not going to find a marketplace that sits there and waits that long. And the engineering world is fast and frantically designing new charging situations and systems because they're going to need them. You know, it's one thing to charge this eight hours away to sleep all night. But if you had to have this all night and it had to be shut off, there would be a way that the marketplace would have driven a charging of a phone in a five-minute span instead of an eight-hour charge. And I think that's got to happen to get the electric vehicles. So I hope we're looking forward to that. That may be a comment, but we need to be aware of that. Senator English?
▶ Play
Thank you. Thanks for the presentation. I'm very interested in this. First of all, it's kind of naive, but where are you going to put these charging stations if they can't go on the highways? Is that in towns and just like a gas station or something
▶ Play
Speaker 5 20:28
like that? They can be, they're going to be along the interstate highways. They just won't be on property that Arkansas Department of Transportation owns. Where do people go to plug in? Well, some of the locations, some of the companies that provide this service will team with, like, a Circle K or a QT, one of those types of businesses. Yes, ma'am. So then I guess my other
▶ Play
question is, so for trucking companies, and this has to be within a mile of interstate, A lot of these trucking company things, like I know in North Little Rock, are more than a mile away.
▶ Play
Speaker 5 21:10
How are we going to handle that? Right now, the NEVI program doesn't speak directly to commercial vehicles. If they're designed to use this type of DC fast charger, they can use these locations. If they're not, then they won't be able
▶ Play
to. Okay, yeah. I just saw
▶ Play
Speaker 5 21:36
Tesla can't. There are some in the private sector that are working to address that problem right now.
▶ Play
This is a way to answer that question. Senator, Representative Fyke. Has the federal government spoken to y'all about replacing lost revenue with the EV starting to be, on how they plan on replacing that revenue? No, sir. I noticed today that California has got some pretty aggressive laws that are about to take place, it appears,
▶ Play
Speaker 2 22:15
and I would think the lost revenue has to be replaced or our highway system will start crumbling. You agree? Yes, sir. Thank you. representative rye
▶ Play
thank you mr chairman beer just a little bit got a question for you let's say back in the end of 2019 gasoline was about two dollars a gallon and no matter what that 19 to 21 cents was actually 19 to 21 cents and now that gas is three or 350 and it got up to four-something, let's just say it averages $4 a gallon, well, you're not going to take in any more money for the roads to get fixed off $4 a gallon than you would off $2 a gallon. And I just wonder, since probably people have cut back a little bit on their driving, if that's affecting our taxes coming in for our roads.
▶ Play
Speaker 70 23:26
We have not seen a decrease yet. Senator Hester. Thank you,
▶ Play
over here. So I'm kind of piggybacking off of a question from my colleague, but, you know, when you said that we would put them at like a Circle K or, you know, those are gas stations people expect to spend less than five minutes at. It would seem to me that you'd prefer to put them at maybe a shopping center or a place that has restaurants. I mean, it really seems like just, you know, what do we do to ensure we're putting them in places where people
▶ Play
Speaker 5 24:09
will actually use them where they plan to spend time? So that's why the department's taking the approach that we have as toward the free market, relying on the individuals that operate in that space of the economy and understand what they need to do, where they need to be located to be competitive. That's why we're not dictating or selecting the specific locations that they can apply for.
▶ Play
Okay, and we say that, you know, I think some of the criteria are if something goes wrong, and it will, right, like that's how things work, right, that they're going to be up and going again within like 24 hours. I mean, are we putting any restrictions or criteria on these
▶ Play
Speaker 5 24:51
people, and how are we going to enforce that? The final rules are not out yet. The guidance that we have at this point doesn't address the department's role in enforcement to that degree. There are requirements for these facilities to be publicly accessible 24-7. Yeah, this is something
▶ Play
that clearly is getting more and more discussion. You talked a lot about priority areas. Are there any thoughts on like the non-priority that, I mean, that we might get totally different things are totally different expectations there. Do you have any thoughts
▶ Play
Speaker 5 25:26
on non-priority areas? Well, part of the approach that we're taking, and again, we don't have the final rules, but we have to achieve that fully built-out status, that designation from the Secretary of Transportation on the existing interstates and designated corridors. Once we have achieved that designation, what we're hoping to be able to do is get some exceptions to the minimum requirement so that we don't have to necessarily have four 150 kilowatt chargers at a site when you have some locations that are relatively high risk to the market because of their location and the traffic volumes that exist there. So in order for us to try to right-size these stations for various locations across the state, we feel like we need that flexibility. We've made that comment in regard to the rules, but we have, again, the final rules aren't out, so we don't know where we stand at this point. Sounds good.
▶ Play
Speaker 83 26:34
Thank you. Representative Flower. Thank you, Mr. Chair. I just had a couple of
▶ Play
quick questions. you so for the federal land where or for the federal rules that prohibit the state parks and rest stops is would it prohibit for the private sector to for the private sector to fund something like this that kind of infrastructure on these lands so they would benefit they would charge it wouldn't be the
▶ Play
Speaker 5 27:10
state charging? The distinction there is between department property where we have used federal funds to either acquire the property or build the facilities there versus a state park that may or may not have used federal money. I'm not familiar with how their funding works or what type of restrictions they may have. It may very well be possible for the state parks to work with one of the charging station companies to install charters on their facilities. Could we find
▶ Play
out? Yes, ma'am. Okay, and then the other thing is who might be, who would be eligible for the grant funds? Any
▶ Play
Speaker 5 27:53
public entity is available for, talking about the competitive grants, that second component. Yes, ma'am. So, cities, counties. Okay, yeah. Thank you.
▶ Play
Representative Cavanaugh. Thank you, Mr. Chair. My question's a little different vein of thought, but on this program coming from the federal government for these EVs, is there anything in the program that deals with the disposable of these batteries? Because we know that's going to be a long-term problem. I mean, really, it is a long-term problem about how we're going to dispose of these batteries as they're replaced. Does it address that in any manner? No,
▶ Play
Speaker 5 28:32
ma'am. At least not in the guidance that we've received and not in the proposed rules as they were written.
▶ Play
Okay, but Arkansas, are we thinking about how that's going to be addressed?
▶ Play
Speaker 2 28:54
Not at this stage. Okay, thank you. So, there's about, on our interstate corridors right now, about
▶ Play
Speaker 5 29:03
25, is that what I've heard? The interstates and the designated corridors, so U.S. 412 between the Oklahoma border and Interstate 49, those routes, yes, sir.
▶ Play
Speaker 2 29:14
Okay. That's, I mean, it's pretty much filled in by that 25-mile circle up there. Is there a gap
▶ Play
Speaker 5 29:22
along the state line there? The requirement is for there to be a charging station at least every 50 miles in the corridor. So what was shown on that map was the 25-mile driving distance, which ends up showing where we have gaps of at least 50 miles or
▶ Play
Speaker 2 29:41
more. 25 miles one way on the, yeah.
▶ Play
Speaker 5 29:45
Yes, sir. So the areas highlighted in yellow are where we have a gap in the charging network at this time. And again, those blue dots, those locations, those are NEVI-compliant charging stations that exist today. So they were installed by the private sector. They were not part of this program.
▶ Play
Speaker 2 30:16
Okay. Thank you. Are there any other questions? Seeing none. Appreciate it, guys, and we'll go on to the next. Good job. I guess you can stay up there, Rex. Thank you. You can bring up the batter up. Anybody else you want up there with you?
▶ Play
Speaker 44 30:46
Not yet. In your packets, you have four reports that I'm bringing to you today, Exhibit B, C1, and C2, and D. And I'll go through each one of those separately and then just pause and allow you to ask questions. Exhibit B, which is toward the front of your report, is a quarterly report for the progress of each of our highway construction projects of $10 million or more. I do not have a formal report,
▶ Play
Speaker 2 31:24
but we'll be happy to accept questions. Anybody have questions on item B? Seeing none, I'm going to item C. If any members find anything, we
▶ Play
Speaker 106 31:39
can always go back to it.
▶ Play
Speaker 2 31:43
Accept them if nobody has questions. item c okay items c1
▶ Play
Speaker 44 31:50
and c2 in the middle of your packet are the july and august of 2022 monthly updates for the alc efficiency study recommendation rules for implementation i'll highlight some of the more significant updates that we've made since the last report and then open up for questions if that's allowable you'll notice that many of the implementations just have a percent complete that's where we've or have continued to progress on those and they are underlined in your packets so in your July report recommendation number four which is found on page seven of July report this recommendation is for the department to implement a process to track all stakeholder inquiries to from receipt to resolution as part of fulfilling this recommendation we have selected and executed a contract with a consultant named government or gov qa to provide software which can integrate into our website that will provide us the ability to input track and document the processing and response to customers and stakeholder inquiries the estimated cost of the gov qa to provide the software and training is less than fifty thousand dollars and this is uh this software is used by florida dot as well as the cities of portland and philadelphia the next highlighted section is recommendation five which is found on page nine of of your packet. Recommendation 5 is for the department to implement efficiencies in procurement and purchasing. Previously, our purchasers were required to physically, manually audit every piece of paper that came through the office. This was very inefficient, and we have implemented a digital auditing process within our accounting system, and this will make us much more efficient uh in in auditing those papers i would also like to highlight that currently 85 percent of our bids and contracts are going out through our online bidding process and lastly on recommendation five we are updating our purchasing and disposal process and procedures manual to provide guidance of best practices to our purchasers across the state and to integrate updates with our Oracle accounting system. And then, lastly, on the July report is recommendation 13 on page 25. This is to improve staff capabilities to align with the current and future organizational needs, and I am proud to highlight the progress we've made in this area. We have filled three positions who are dedicated to expanding and enhancing our training programs, publishing learning paths, developing curriculum for the online and classroom training, and coordinating the leadership development program and maintenance training academy. We have had 124 newly hired employees participate in the entry-level driver training. We've had 3,450 employees have received a new anti-fraud and code of ethics training 1500 employees have received additional work zone safety training 10 newly promoted supervisor has supervisors have been through our new supervisor on board training 15 supervisors have participated in a pilot leadership immersion training with the ualr leadership academy and 16 additional supervisors have attended the leadership ulr leadership academy so you can say we're making a lot of progress in that area and those are the main highlights for the july report i'll pause and take any questions members
▶ Play
Speaker 2 36:01
have any questions or what's been covered seeing none okay oh yes sir hey and i may be totally on
▶ Play
the wrong uh section or whatever of the report and actually I think I am I got a question I think on on item D we're not there
▶ Play
Speaker 44 36:26
sorry go ahead okay we'll move on to the August report I have a couple items I'd like to highlight here on the August report recommendation six which is page 11 in your August report recommendation six is to implement construction contractor performance measurements in order to fulfill this recommendation we've established a contract contractor performance evaluation committee if you'll recall we had public comments in the previous when we were getting ready for this that suggested we have represented from the contracting community employ on this committee so we requested the association general contractors of arkansas and arkansas asphalt pavement association to recommend members for this committee and they have recommend agc has recommended mr paul drury of capital mid-south and the arkansas asphalt pavement association is recommended mr brad marotti of delta arkansas delta asphalt of arkansas and that committee is currently reviewing best practices of contract performance measures used by other dlt's and then lastly on this report recommendation seven is to implement the project and portfolio management frameworks for pre-construction construction and maintenance in order to complete a portion of recommendation seven we are requesting approval to proceed with the contract for a computerized maintenance management system. This contract is found in exhibit D at the back of your packet and is the next agenda on the item. There's an item on the agenda. So these are the main highlights for
▶ Play
the August report. I'll be happy to take any questions commit. Senator Chesterfield. Thank you. Thank you, Mr. Chair. Recommendation six was perhaps one of the more contentious areas of concern as we were providing this. You're at 25 percent completion according to your own report. When do you anticipate at least getting to 50 or 60 percent of completion of this guideline? I don't have a date in front of me,
▶ Play
Speaker 44 38:53
but we are moving very quickly. They've done a lot of research. The committee's done a lot of research on different DOTs, and I believe they're settling on one. So they're moving very quickly on this. So we anticipate moving soon. All right. Thank you. Maybe we'll have a greater degree
▶ Play
of completion when we see you again. Yes, ma'am. Thank you so much, Mr. Chair. Thank you. Rex, I guess we'll go
▶ Play
Speaker 2 39:17
to d so all right ask his question excuse
▶ Play
Speaker 44 39:27
me maybe i'll answer your questions in my my recommend in my uh introduction here um so when item d in your packet is introduction of a maintenance management system contract to accomplish guide house study recommendation number seven rdoc plans to implement a modern maintenance management system software to more effectively plan statewide maintenance activities funding and inventories prior to execution of contracts of fifty thousand dollars or more to implement study recommendations department is providing hcrass the opportunity for review of this contract in may of 2021 the department issued a request for proposal for maintenance management software these proposals are advertised on our website and of course with procurement law additionally rdop mailed out the advertisement to a list of national nationwide potential vendors 11 proposals were received and reviewed. 11 vendors were later invited to make demonstrations. In November of 2021, following proposal evaluations, the commission approved the department to begin negotiations with data transfer solutions for implementing VueWorks software. This web-based software will allow staff to track and manage service requests and more efficiently plan assets, equipment, and labor for our maintenance activities. On July 26th of this year, RDOT submitted the proposed contract with DTS to this committee for review, and on August 1st of this year, RDOT published a notice for 14 days for public comment regarding our intent to enter the contract with DTS for a maintenance management system software. The notice was published on the RDOT website and an ad was in the Democratic Gazette. No comments have been received to date. The initial cost of the software implementation and training is $1.63 million. The annual cost will be $160,000 for support, maintenance, and data hosting. And RDOT is excited to implement the DTS software to modernize our maintenance management and planning efforts. I would like to add or take note that this is the first contract of $50,000 or more related to implementation of the Guidehouse study recommendations which RDOT has submitted to this committee for review. Our staff did communicate with the Office of State Procurement to ensure we provided all the necessary information in the course of what other state agencies do, but if the committee would like something else in the future, we would be happy to provide it.
▶ Play
With that, I'd be happy to take questions. Senator Hester. Thank you. So on the maintenance, this may just be like a resurfacing or overlay type maintenance, but does it include like potholes, areas where that – I will say why. So I'm on the – I'm chairing our claims commission, and every time we have claims and we have a list of people that say, hey, I broke a, you know, whatever. My car got broke. You know, all these different things because we hit a pothole. And I totally get why we can't, you know, pay for all those in the state, right? But I'm empathetic to the users and to that. But this is a system, this software will help us identify these potholes and get them fixed more quickly. Yes, they will
▶ Play
Speaker 44 43:19
identify and we can put them into a system where we can track them and track the length of time it's taking for a specific crew to take care of that. That also helps us be more efficient. We can see where maybe we have weaknesses on timely repairs such as that. So, yeah, absolutely. And how do
▶ Play
you identify currently where there are potholes? I mean, the system will be helpful, but it's only as good as the information that goes in. How do you identify where they're
▶ Play
Speaker 44 43:46
at? Well, one is just our employees driving through the jobs or public comments yeah i know there's like a 1-800 number or something people calling them part of part of the one of our recommendations will also include allowing public to give us feedback and get us information regarding those types of issues okay thank you so much yes sir
▶ Play
Speaker 2 44:08
so a large part of that maintenance has been on the on the district engineers so will this help you in the central office see have a have a part in that also absolutely this will help us track
▶ Play
Speaker 44 44:26
and and see where we have issues where we need help uh where maybe a specific district needs more help uh the district you live in has more bridges than any other district in state and so they need a lot they need more help with bridge repair and so but this will
▶ Play
help us see that more clearly Thank you, Senator Pitch. Thank you, Mr. Chairman. Communicate, communicate, communicate. I'm kind of on Senator Hester's bandwagon there. But there are times where RDOT will not fix a road with an overlay, et cetera, because it's getting widened or whatever. I'm using an example in my area. Will there be communication devices in this maintenance software where I'm Joe Q Public and I said there's a pothole on south 45th street and you don't plan to fix that because south 45th street is going to a different level of road will you be communicating the date and time to expect it fixed as well as why there's data
▶ Play
Speaker 44 45:31
with it that will not be specifically in this program it will be in the other program the uh government
▶ Play
qa because that's usually where we get into i mean sure i think there's a level of they understand it takes time. They don't go to the head of the list with the citizen. But when you have a legitimate reason, engineering or otherwise, to not be out there as soon as possible to fix, that's usually where we get the most unhappy customers, if you will, the unhappy citizens. And I think at some level, if there's the ability to say this project is on pause because or even a short description why where they can report them that's going to be invaluable to solving some of the customer service issues. Absolutely and with the government QA that's part
▶ Play
Speaker 44 46:19
of that is it's tracking that input we're getting from the truck it's tracking what have we done about it who have we communicated what we've done about it with and that will help us track that to be sure that that citizen that calls in with a pothole has at least been contacted but or we've taking care of the pothole, or feedback, absolutely, yes. So this
▶ Play
Speaker 2 46:42
will be a lot better than you guys just putting a sign out that says bump? Yes. I'm always like, fix the bump. So we can give you some feedback about the bump sign. That's right, that's right.
▶ Play
Speaker 128 46:58
Move the bump sign, fix the
▶ Play
Speaker 2 47:01
bump, right? All right, thank you, sir. Is there any other questions for members? Seeing none, we'll consider that reviewed. Is there any other business for the committee? Seeing none, we are adjourned. Thanks.
▶ Play
Unknown speaker 47:36
Thank you.
▶ Play

Agenda

A. Call to Order

1:14 - 30:54 91 segments 15 speakers

B. Reports on the Progress of Each Highway Construction Project of $10 million or More as Required by A.C.A. § 27-65-107(a)(19) [Exhibit B] - Rex Vines, Deputy Director and Chief Engineer, Arkansas Department of Transportation (ARDOT)

30:54 - 31:35 2 segments 2 speakers

C. Review of July and August 2022 Monthly Updates of the ALC Efficiency Study Recommendations Rules for Implementation [Exhibits C1-C2] - Rex Vines, Deputy Director and Chief Engineer, ARDOT

31:35 - 39:46 23 segments 5 speakers 1 document

AR​DOT staff highlighted July-2022 updates, including a contract for a stakeholder-inquiry tracking software (GovQA), implementation of digital auditing in procurement, and expanded training programs that have reached over 3,400 employees. [32:30] [33:02] [33:39] [34:11] [34:47] [35:22]

The August-2022 report was summarized with the formation of a contractor-performance evaluation committee and a request to proceed with a computerized maintenance management system contract to satisfy recommendation 7 of the Guidehouse study. [36:26] [37:02] [37:38] [38:09]

Senator Chesterfield asked when the contractor-performance work would reach 50-60 % completion; staff indicated rapid progress but could not provide a specific date. [38:27] [38:43] [38:53] [39:07]

Senator Hester briefly interjected about item D before being redirected, confirming no substantive discussion on that item at this time. [36:13]

D. Review the Proposed Contract with Data Transfer Solutions (DTS) to Develop a Maintenance Management System for the Implementation of Efficiency Study Rule Recommendations #7 [Exhibit D] - Rex Vines, Deputy Director and Chief Engineer, ARDOT

39:46 - 1:26

AR​DOT presented the proposed $1.63 million contract with Data Transfer Solutions to implement the VueWorks maintenance management system, noting the procurement process (11 proposals, demonstrations, negotiation approval) and that no public comments have been received on the notice published on July 26. [39:48] [40:22] [40:53] [41:29] [41:59]

Senator Hester asked how the system would help identify and track pothole repairs; staff explained that the software will log reports from employees and the public, enabling faster response and performance monitoring. [42:29] [42:59] [43:19] [43:33] [43:36] [43:46]

Senator Pitsch inquired about communicating repair timelines to the public; Vines indicated that while not part of this contract, the system’s integration with a separate government-QA platform will allow tracking of citizen reports and communication of status updates. [44:50] [45:17] [45:31] [45:38] [45:49] [46:19] [46:42]

E. Federal National Electric Vehicle Infrastructure Formula Program Update - Rex Vines, Deputy Director and Chief Engineer, ARDOT

1:26 - 47:12 140 segments 17 speakers

Rex Vines presented ARDOT’s NEVI Formula Program plan, explaining that Arkansas will receive $54.1 million over five years, will not own or operate charging stations, and must install DC fast chargers meeting specific power and spacing requirements, with 40 % of benefits targeted to disadvantaged and rural communities. [2:14] [2:38] [3:10] [3:37] [3:42] [3:55] [4:19] [4:52] [5:25] [6:00] [6:33]

He outlined the submission of the deployment plan on July 27, its positive review by the joint FHWA-DOE office, anticipated final approval in September, and the intent to award contracts to private owner-operators at an estimated $1 million per site. [5:25] [6:00] [6:33] [7:08] [7:40] [8:10]

Senator Chesterfield questioned why state-owned highway property could not host chargers; Vines responded that federal law prohibiting revenue collection on interstate facilities prevents ARDOT from competing with private operators. [15:32] [16:00] [16:07] [16:19] [16:31] [16:36] [16:47] [16:51] [17:19] [17:31] [17:55]

Several legislators raised concerns about charger speed, siting at retail locations, and impacts on trucking and highway revenue, to which Vines noted the program’s reliance on market-driven private placement and ongoing stakeholder engagement. [18:08] [18:25] [19:00] [19:31] [20:01] [20:11] [20:28] [20:38] [20:56] [21:10] [21:32]

F. Other Business

47:12 - 47:17

G. Adjournment

47:17 - 48:06 1 segment

Speakers

Speaker 2
19 segments
Speaker 44
32 segments
Speaker 5
45 segments
Senator Linda Chesterfield Unverified
8 segments
Speaker 48
2 segments
Speaker 51
1 segment
Senator Mathew Pitsch Unverified
9 segments
Senator Jane English Unverified
3 segments
Representative Lanny Fite Unverified
1 segment
Representative Johnny Rye Unverified
2 segments
Speaker 70
1 segment
Senator Bart Hester Unverified
9 segments
Speaker 83
1 segment
Representative Vivian Flowers Unverified
3 segments
Representative Frances Cavenaugh Unverified
3 segments
Speaker 106
1 segment
Speaker 128
1 segment